14. Servicing Mode

14.1.1Pump down operation (SW1)

Operate the pump down process according to the following procedure. o Confirm the valve on the liquid side and gas side are open.

o Press PUMP DOWN button (SW1) on the Service PCB inside the outdoor unit for more than 5 seconds. Pump down (cooling) operation is performed for 15 minutes.

o Set the liquid side 3 way valve to close position and wait until the pressure gauge indicates 0.01MPa (1.45 PSI).

o Immediate set the gas side valve to close position and then press the PUMP DOWN button (SW1) to stop the

pump down operation.

NOTE: Pump down operation will stop automatically after 15 minutes if PUMP DOWN switch (SW1) is not pressed again. Pump down operation is not started within 3 minutes after compressor is stopped.

LED

2

3

4

5

Message

 

 

 

 

 

 

 

 

 

 

 

Pump down operation in progress

 

 

 

 

 

 

Status

 

 

 

 

3 minutes before operation end

 

 

 

 

 

 

 

 

 

2 minutes before operation end

 

 

 

 

 

 

 

 

 

1 minute before operation end

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pump down operation end

 

 

 

 

 

 

: Flashing

14.1.2Test Run Operation

Test operation can be carried out using OPERATION TEST button (SW2) on the Service PCB inside the outdoor unit.

For Cooling test, press the OPERATION TEST button (SW2) for 5 seconds or more but less than 10 seconds, LED1 and LED 2 will illuminate when shift into cooling test operation.

For Heating test, press the OPERATION TEST button (SW2) for more than 10 seconds, LED 1 and LED 3 will illuminate when shift into heating test operation.

Press the OPERATION TEST button (SW2) again to cancel test operation.

29

Image 29
Contents Destination Canada Air Conditioner Outdoor UnitTable of Contents Safety Precautions Page Outdoor Unit SpecificationsOutdoor Unit ∙ Multi Split Combination Possibility Room Indoor Unit Capacity Total Indoor Dimensions Refrigeration Cycle Diagram Block Diagram Electronic Controller Noise Filter WiringElectronic Circuit Diagram Main Printed Circuit Board Printed Circuit BoardPage Check Points Installation InformationSelect The Best Location Installation InstructionConnect The Piping Install The Outdoor UnitCutting and Flaring the Piping Evacuation Of The EquipmentHeat Insulation Connect The Cable To The Outdoor UnitDisposal Of Outdoor Unit Drain Water Operation Control Cooling Powerful OperationCooling Operation Outdoor fan controlHeating Room Temp Sampling Control Powerful OperationHeating Operation Simultaneous Operation Control Electronic Parts Temperature Rise Protection 2 Cool Electronic Parts Temperature Rise Protection 1 CoolProtection Control Freeze Prevention control CoolHeating overload control Heat Cooling overload control CoolIPM power transistor Protection Control Time Delay Safety Control Restart ControlDeice Control 13.10 30 seconds Force OperationCompressor discharge high pressure protection control Compressor Protection Control Gas leak detection controlValve close detection control Test Run Operation Servicing ModePump down operation SW1 Power Save Mode Wiring Error CheckMode priority function Cooling only functionSelf Diagnosis Function Troubleshooting GuidePage Page Outdoor Unit Removal Procedure Disassembly and Assembly InstructionsRemoving the Cabinet Top Plate Remove the Control Board Cover and Particular PlatesRemoving the Cabinet Front Plate Removing the Propeller Fan and Fan Motor Removing the Control P.C. BoardOne Indoor Unit Operation Technical DataOperation Characteristics Page Page Page Page Page Page Page Two Indoor Unit Operation Page Page Page Page Page Page Page Page Page Page Page Three Indoor Unit Operation Page Page Page Page Page Page Page Four Indoor Unit Operation Page Five Indoor Unit Operation Page Exploded View and Replacement Parts List Safety REF.NO Description & Name QTY CU-5E36QBU Remark Installation Instruction