EDGE Tech Edge 540 specifications Control Horn Installation

Page 18

EDGE 540.

Instruction Manual.

 

 

3)While holding the vertical stabilizer firmly in place, use a pen and draw a line on each side of the vertical stabilizer where it meets the top of the fuselage.

Pen.

4)Remove the stabilizer. Using a mod- eling knife, remove the covering from below the lines you drew. Also remove the covering from the bottom edge of the stabilizer and the bottom and top edges of the filler block. Leave the covering in place on the sides of the filler block.

Remove covering.

When cutting through the covering to remove it, cut with only enough pressure to only cut through the covering itself. Cut- ting into the balsa structure may weaken it.

18

5)Slide the vertical stabilizer back in place. Using a triangle, check to ensure that the vertical stabilizer is aligned 90º to the hori- zontal stabilizer.

 

 

Vertical

Horizontal

90º

Stabilizer.

 

Stabilizer.

 

 

6)When you are sure that everything is aligned correctly, mix up a generous amount of Flash 30 Minute Epoxy. Apply a thin layer to the mounting slot in the top of the fuselage and to the sides and bottom of the vertical stabilizer mounting area. Apply epoxy to the bottom and top edges of the filler block and to the lower hinge also. Set the stabilizer in place and re- align. Double check all of your measurements once more before the epoxy cures. Hold the stabilizer in place with T-pins or masking tape and remove any excess epoxy using a paper towel and rubbing alcohol. Allow the epoxy to fully cure before proceeding.

C/A glue.

CONTROL HORN INSTALLATION.

1)Locate the two nylon control horns, two nylon control horn backplates and four machine screws.

Image 18
Contents Edge Additional Items Required Parts ListingIntroduction Tools & Supplies NeededEdge Hinging the Ailerons Hinging the Elevators Hinging the Rudder Installing the Aileron Servos Aileron Linkage Servo arm Installing the Battery Engine MountFuel Tank Mounting the Engine Wheel and Wheel Pants Follow diagram below for wheel pant installation Installing the Main Landing Gear CowlingInstalling the Spinner Elevator Rudder Servo Installation Horizontal StabilizerVertical Stabilizer Installation Control Horn Installation ELEVATOR-RUDDER Pushrod Installation Installing Tail Strut System Mounting the Tail Wheel BracketMounting the Control Clasp Installing the Switch Installing the Fuselage ServoThrottle Servo Installation Installing the Receiver Attachment WING-FUSELAGE BalancingControl Throws Flight Preparation Preflight CheckEdge Edge