HTC PDA PHONE II, Andes B1. Requirement, B2. Procedure, Criteria on running Run Down Test Program

Page 40

B.Battery Performance on unit with Run Down Program

B1. Requirement:

-PC with Windows 2000. -USB cable -ActiveSync 3.7

-Run Down Test Program from HTC -Criteria

B2. Procedure:

-Establish The connection between your PC and PDA phone. -Copy Run Down software to your PDA phone (My Document)

-It is required to turn off Bluetooth setting manually before executing the Run down.

-Execute Run Down and choose 1 hr , the program will stop automatically after one hour.

-After one hour, find the Power cap.txt file on FILE Explorer >My device> Power cap to check battery capacity after running one hour.

Notes: The result on Power cap will be re-write to new one once you execute the Run down again.

-Criteria :The battery capacity should be above 50 % after running Run down.

Criteria on running Run Down Test Program

Battery capacity after Run down one hour

Capacity 50 %

HTC confidential

© 2001, HTC Corporation. All rights reserved.

TOTAL 77 CONT.ON. 41 PAGE NO. 40

Image 40
Contents For PDA Phone Andes APP´D Table of contents 4END Introduction ContainsSpecification of AC Adapter GSM/GPRS Functional BlockGPRS/GSM 400MHzTotal 77 CONT.ON page no Total 77 CONT.ON page no TTE System Block Diagram Main unit Regulatory label on the rear housing of main unit Labeling01 ~ Label exampleTBD Servicing Tools Assembling and Disassembling PDA PhoneTotal 77 CONT.ON page no Total 77 CONT.ON page no Total 77 CONT.ON page no Use tweezers to remove the Vibrator 72H00401-00 Total 77 CONT.ON page no MB Pre-assembly Gasket on shielding cover72H00411-00 Black poron of Send/End buttonBlack poron for volume button PN of this poron is 76H00483-00Total 77 CONT.ON page no Total 77 CONT.ON page no 72H00339-00 Antenna AssemblyN72H00338-00 FIX Antenna Cover Warranty Seal Security Label77H00083-00 Test Camera Replacement assemby Connector, Back up battery replacement PadProblem Diagnostics List of Test JigsDiagnostic Program Clean Talk TimeHow to select test item Stop on failChecksum Refurbishment Total 77 CONT.ON page no To Main battery To PC Com Port Voltage 2.5 Criteria for Eeprom Block 1 Status B2. Procedure B1. RequirementCriteria on running Run Down Test Program Capacity ≧ 50 %Current consumption measurement Fixture requirementReady for testing Unit is turn off and no display Single dots Bright dotsSingle Dark dotsOr lints Power Off status All allowable defect dotsForeign Scratch Scratch, Object11.RF 11.1RF Test RequirementRF Antenna Spec RF Antenna Test SpecGSM 900 Transmitter Test DCS 1800 Receiver Test OS Upgrade and GSM code Upgrade Execute RUU Next Total 77 CONT.ON page no Done Following is the complete procedure for SD reflash Execute MTTY.exe and set into USB PortSerial V1.02 Following display will be shown on PC display … Then press ENTER, following display will be shown 100% Checksum is OK HTC confidential SD Download Sections=3 Press Power To Flash…… Once it is Done, display will show Classification of Non-Conformity Troubleshooting & Repair -A.Touch Panel Does Not Respond to Screen Tap-B.Buttons Do Not Respond -A.SD Card cannot be used -A.Data Retention related problem -B.Battery discharges quickly even after fully charged -A.No Recorded Sound or Distorted sound Exploded Diagrams & Spare part list Spare part list Spare Part List with Picture 72H00339-00 75H00313-00 Appendix Customer, Retailer MisjudgmentHTC confidential FTP Repair Troubleshooting Guide Flow Total 77 CONT.ON. F page no