OPERATION

B-20

 

 

 

 

 

 

strip may be used and plates may be gapped 1/8”

High-Speed Group (AWS E6013)

 

(3.2mm) or more, as shown in figure (b).

This group includes electrodes which have a moder-

 

 

 

 

 

 

 

 

ately forceful arc and deposit rates between those of

 

 

(b)

Scrap steel back-up strip

the out-of-position and high-deposit electrodes.

 

 

(a)

(c)

 

 

Return

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return

Return to Master TOC

Return to Master TOC

Return to Master TOC

Three ways to prepare plates where complete penetration is necessary.

On sections where only a sealed joint is required and strength is not important, the joint may be welded after slightly veeing out the seam as shown in figure

(d) below.

(d)

(e)

Single and double beads, with and without beveling for tight, partial strength joints.

Selecting Electrodes

Which electrode is best for the particular job . . . how do you use it? These are important questions because the cost, quality, and appearance of your work depends on proper electrode selection and application. MILD STEEL ELECTRODES may be classified into the following groups:

Out-of-Position Group (AWS E6011)

This group includes electrodes which have a snappy, deep penetrating arc and fast freezing deposits.

These electrodes are used for general purpose, all- position fabrication and repair welding. They are also the best choice for pipe welding and sheet metal butt, corner, and edge welds. They can be used for repair work when dirt, grease, plating or paint cannot be completely cleaned from the steel. These electrodes are typically used with motions “A” and “B” (see drawing) for the first pass on vertical-up welds.

They are primarily general purpose production elec- trodes especially for downhill fillets and laps or short and irregular welds that change direction or position. They are also widely used in maintenance and recom- mended for sheet metal fillet and lap welds. Motion “D” (see drawing) is generally used for vertical-up welding, but motions “A” and “B” are also suitable.

Low Hydrogen Group (Stable-Arc E7018)

These electrodes are generally called “low hydrogen”. The name comes from the fact that their coating contains little hydrogen in either moisture or chemical form. Low hydrogen electrodes offer these benefits: outstanding crack resistance, lowest porosity on sulphur bearing steels, and X-ray quality deposit capability. Thus, they are the first choice when weld- ing “problem” steels. E7018 can be used in all posi- tions, with Motion “C” (below) recommended for the first pass on vertical-up welds. NEVER use a whip- ping technique or a long arc with these electrodes. ALWAYS fill craters by drawing electrode away slow- ly. ALWAYS keep these electrodes dry. Electrodes, when not used within a few hours after a container is opened, must be stored in heated cabinets.

 

 

 

Motions

 

E

 

 

 

 

D

 

 

START

F

C

 

 

 

 

 

 

 

 

 

B

 

 

 

G

 

 

 

 

A

SIDE￿

 

VIEW

 

 

 

 

 

 

 

 

POWER-ARC 4000

Image 36
Contents POWER-ARC Safety Depends on YouSafety California Proposition 65 WarningsElectric Shock can kill Welding Sparks can cause fire or explosion Précautions DE Sûreté Master Table of Contents for ALL Sections Table of Contents Installation Section Installation Technical Specifications POWER-ARCSafety Precautions Location and VentilationStoring PRE-OPERATION Engine Service Spark Arrester Cert. Kool BoreElectrical Output Connections Welding Cable ConnectionsCable Size for 125 ampAuxiliary Power Receptacles Machine GroundingPlugs and HAND-HELD Equipment Premises Wiring Circuit BreakersThese Devices Without POWER-ARC Table of Contents Operation Section Safety Instructions OperationOperating Instructions General DescriptionOperational Features and Controls Design Features AdvantagesRecommended Applications Welding CapabilityControls and Settings GENERATOR/WELDER ControlsGasoline Engine Controls 20 AMP, 120 Volt Duplex ReceptacleEngine Operation Before Starting the EngineStarting the Engine For a HOT Engine To USE the Generator AS AN Auxiliary Power Supply Generator OperationGeneral Information Table B.1 Generator Power Applications Suggested Power Applications Running Watts Start-up WattsWelding Operation Welding Guidelines Table B.2 Welding APPLICATIONS/ELECTRODE Selection GuideOperation What Happens in the Arc? Correct Welding Position Correct Arc Length Practice Use the followingDo the following Butt WeldsFillet Welds PenetrationVertical-Up Welding Vertical-Down WeldingOverhead Welding Hardfacing To Reduce WearWelding Sheet Metal Welding Cast Iron Cast Iron Plate PreparationHigh-Speed Group AWS E6013 Out-of-Position Group AWS E6011Low Hydrogen Group Stable-Arc E7018 Table of Contents Accessories Section Accessories OPTIONS/ACCESSORIESLincoln Electric Accessories Table of Contents Maintenance Section Maintenance Routine and Periodic MaintenanceEngine Maintenance Engine AdjustmentsFigure D.2 Clean Rotating SCREEN/FINGER GUARD/DEBRIS Guard Table D.1 Engine Maintenance Schedule GENERATOR/WELDER Maintenance Do not attempt to polish slip rings while engine is runningFigure D.6. Major Component Locations Table of Contents Theory of Operation Section Theory of Operation ENGINE, EXCITATION, Rotor and StatorRotor Field Feedback and Auxiliary Power Figure E.3 Field Excitation and Auxiliary PowerAuxiliary Power Overcurrent Protection Weld Winding and ReactorTable of Contents Troubleshooting & Repair Section Troubleshooting & Repair HOW to USE Troubleshooting GuideTroubleshooting Output ProblemsOr contact your local Lincoln Electric Authorized Field SerVice Facility Field Service Facility Local Lincoln Electric AuthorizedTroubleshooting Rotor Resistance Test Engine Problems Troubleshooting Engine Throttle Adjustment This procedure takes approximately 15 minutes to perform Rotor Voltage TestTest Description Materials NeededTest Procedure Rotor Voltage TestThis procedure takes approximately 25 minutes to perform Rotor Resistance TestRotor Resistance Test Figure F.3 Brushes Retained with Cable TIE Engine Throttle Adjustment Test This procedure takes approximately 20 minutes to performStrobe-tach Method Frequency Counter MethodOscilloscope Method Wing NUT High Speed Stop Screw Scope Settings Normal Open Circuit Weld Voltage WaveformHigh Idle no Load Normal Open Circuit Voltage Waveform 115 VAC Supply Typical Weld Output Waveform Machine LoadedMachine Loaded to 125 Amps AT 23 VAC Brush Removal and Replacement DescriptionBrush Removal and Replacement ProcedureProcedure Rheostat Removal and Replacement Figure F.7 Rheostat Removal Capacitor AND/OR Diode Bridge Removal and Replacement This procedure takes approximately 35 minutes to performProcedure Capacitor Removal and REPLACE- Ment Figure F.8 Location and Discharging the Field CapacitorProcedure Field Diode Bridge Removal and Replacement Figure F.8A Field Diode Bridge LocationSTATOR/ROTOR Removal and Replacement This procedure takes approximately 3 hours to performInstructions STATOR/ROTOR Removal and Replacement Troubleshooting & Repair Rotor Removal Procedure Figure F.12 Checking ROTOR-STATOR AIR GAP Auxiliary Power Receptacle OUTPUT1 Retest After RepairEngine Output WELDER/GENERATOR OUTPUT1Return to Section TOC Table of Contents Diagrams Section Diagrams Wiring Diagram Power ARCDIAGRAMSG-3 DIAGRAMSG-4 Dimension Print Power ARC Return to Section TOC SVM Error Reporting Form