Lincoln Electric SP-250 service manual Spool GUN Connection BOX, Installation

Page 34

C-3

ACCESSORIES

C-3

 

 

TOC

TOC

SPOOL GUN CONNECTION BOX

the machine connected for electrode

positive,

INSTALLATION

(refer to instruction manual), remove the positive

 

 

Section

Master

electrode lead from its connection on

the wire

 

NOTE: Model codes below 9900 require the addition

drive.

Then reconnect with the connection box

 

 

 

 

electrode lead on the bolt under the positive elec-

 

 

of three holes to the front of the machine's base as

to

to

trode lead so the connection box electrode lead is

shown in Fig C.3.

sandwiched between the positive electrode lead

Return

Return

 

 

Tighten snugly, being careful not to

strip the

 

 

 

terminal and the wire drive contact surface.

 

 

 

threads.

 

Return to Section TOC

Return to Master TOC

 

 

 

 

 

 

Figure C.3 - Spool Gun Connection Box Installation

 

 

 

 

 

Mounting Holes

 

 

 

 

 

1. Remove the plug button, if present, from the cen-

Figure C.4 - Spool Gun Connection Box

 

 

ter hole in the front of the machine's base and par-

 

 

Installation.

 

 

tially thread the two #10 thread forming screws,

TOC

TOC

 

provided with kit, into the two small holes on both

 

 

 

 

Section

Master

sides of the center hole.

 

2. Route a user-provided gas supply hose, from the

 

 

 

 

to

to

flow regulator of the spool gun gas cylinder, over

 

the rear axle of the machine, and out to the front

 

Return

Return

 

through the center hole in the front of the base.

 

 

 

 

 

 

3. Connect the gas hose to the 5/8-18 female inert

 

 

 

gas fitting on the back of the connection box.

 

 

 

4. Slip the connection box mounting keyholes over

 

 

 

the screw heads (installed in Step 1 above) and

 

 

 

pivot the box clockwise to engage and level the

 

 

 

box, then tighten the screws.

 

TOC

TOC

5. Route the control cable of the connection box up

 

through the opening in the front louver provided for

 

 

 

 

Sectionto

Masterto

the work lead, then up behind the wire drive, and

 

connect the plug to the kit receptacle installed in

 

 

 

 

 

 

the previous section A. See Figure C.4.

 

Return

Return

6. Route the electrode lead of the connection box up

 

through the same opening in the front louver. With

 

 

 

 

 

 

IDEALARC SP-250

Image 34
Contents Safety Depends on You Idealarc SP-250ARC Welding can be hazardous Idealarc SP-250Cylinder may explode if damaged Electric and MAG- Netic Fields IiiPrécautions DE Sûreté Sûreté Pour Soudage a L’ArcTable of Contents Installation Height Depth Weight GUNStorage Operating Input Connections Safety PrecautionsSelect Proper Location StackingFuse and Wire Sizes Input Power Connections Ground ConnectionsConnect Shielding GAS Figure A.3 Ground Connection For 230/460/575 Volt ModelsReconnect Procedure SideReturn to Section TOC Connect Output Components GUN Liner & Contact TIP InstallationInstall the Work Clamp Output Polarity ConnectionGUN & Cable Installation Figure A.9 European Style ConnectorOperation General Description Safety InstructionsAdditional Safety Precautions Electric Shock can killControls System includes the following featuresOperational Recommended ProcessesWire Feeder Features Design FeaturesUnit Features Power Source FeaturesLimitations Machine CapabilityDuty Amps Volts Cycle Controls and Settings Figure B.1 SP-250 Control Panel KeysArrow KEY Operation When Used with Process WIRE/GAS KEYArrow KEY Operation When Used with Auto KEY Arrow KEY Operation When Used with Manual KEYLeft arrow keys Do not function Arrow KEY Operation When Used with Spot KEYArrow KEY Operation When Used with Stitch KEY Right arrow keys Do not functionFigure B.5 Using the Toggle Function Step Trigger Interlock KeysMaking a Weld in Auto Mode RUN-IN ModeChanging RUN-IN Mode Codes 10001 and Above Operating StepsMaking a Spot Weld in Auto Mode Using the 4-STEP Interlock Function in Auto ModeTo make an arc spot plug weld Making a Stitch Weld in Auto Mode Using the GUN Thumb Switch Magnum SP-250 onlyUsing the Wire Drive Roll Using the GUN Trigger SwitchLoading the Wire Reel To mount 10 to 30 lb. spools 8 and 12 diameterSetting Idle Roll Pressure Feeding ElectrodeAccessories Spool GUN Adapter KIT Installation Options / AccessoriesSpool GUN Module Board Installation Figure C.2 Spool Gun Module Board Installation Installation Spool GUN Connection BOXSpool GUN Connection Figure C.5 Spool Gun ConnectSpool GUN Installation to OLD K531 KIT Figure C.6 Spool Gun ConnectionMaintenance Maintenance Routine and PeriodicControl Board Choke Fan Assembly Main Transformer Theory of Operation Input Line Voltage and Main Trans Power Supply OperationFormer Output Rectification and Feed Back ControlConstant Voltage Output Figure E.4 Constant Voltage OutputWire Drive Motor and Feedback Figure E.5 Wire Drive Motor and FeedbackThermal Protection SCR Operation Figure E.6 SCR OperationTroubleshooting & Repair HOW to USE Troubleshooting Guide Recommended Course of ActionPC Board Troubleshooting Procedures Board can be dam- aged by static electricityOutput Problems Warn Troubleshooting & Repair Function Problems Troubleshooting & Repair Wire Feeding Problems Toxic. Avoid contact with any Liquid elecTrolyte in these capacitors is Portion of your bodyTroubleshooting & Repair Explanation of Prompting and Error Messages On Screen Error Message Message ExplanationOn Screen Error Message Explanation of Prompting and Error Messages CONT’DXxxx Current Overload Reduce Output Press ANY KEY to Stop Message Test Description Main Transformer TestMaterials Needed Main Transformer Test Test Procedure Lead Plug Location From Expected Lead Voltage#206 4J6 #208 16J6 #209 7J6 G1992 Code 9402 only Troubleshooting & Repair Static SCR Rectifier Assembly Test Leads Figure F.4 SCR 1 Test Points Active SCR Rectifier Assembly Test Leads Figure F.7 SCR Tester Circuit and SCR connections SP-250 Keypad Resistance Test 25F-25Figure F.8A Plug J2 Location on G2252 PC Control Board Figure F.9 Plug J2 Test Points27F-27 Test Points KEY Pressed Maximum AllowableTable F.1 SP-250 Keypad Resistance Tests Wire Drive Motor and Tachometer Feedback Test Wire Drive Motor and Tachometer Feedback Test Test Procedure Figure F.10A Plug J5 Location on G2252 PC Control Board#206B 4J6 #515B 1J6 #555 2J6 #541 6J6 #539 3J6 Pull the gun triggerTest for Supply Voltage to Tachometer Test for Feedback Voltage to the Control BoardScope Settings Normal Open Circuit Voltage WaveformMachine Loaded to 250 Amps AT 26 VDC Scope Settings Typical Output Voltage Waveform Machine LoadedMachine Loaded to 220 Amps AT 22 VDC Scope Settings Troubleshooting & Repair Typical SCR Gate Voltage Waveform Control PC Board Removal and Replacement Removal and Replacement Procedure Materials NeededTroubleshooting & Repair Keypad Removal and Replacement Keypad Removal and Replacement Procedure Wire Drive Assembly Removal and Replacement Wire Drive Assembly Removal and Replacement Procedure Figure F.13 Wire Drive Assembly RemovalSCR Output Rectifier Removal 43F-43Figure F.14 Heat Sink lead discon- nection Capacitor Bank Removal and Replacement Capacitor Bank Removal and Replacement Procedure Main Transformer Removal and Replacement Power Switch FAN Motor and FAN Removal and Replacement FAN Motor and FAN Removal and Replacement Procedure Figure F.18 Fan Motor and Fan Removal ComponentsTroubleshooting & Repair Input Volts/Hertz Wire Speed RangeOpen Circuit Voltage 230/60 375Table of Contents Electrical Diagrams G1992 Control PC Board Identification X9 . . . . . .IC-CMOS,UNDERVOLT-SENSING,RESET,MCU Idealarc SP-250 Electrical Diagrams G2252 Control PC Board TOC OCI2,OCI3 Optocoupler Triac Driver Idealarc SP-250 Electrical Diagrams Wiring Diagram for Code 9546 SP-250 230/460/575V Wiring DiagramWiring Diagram for Code 9723 Thumb SwitchImproper Lincoln Electric. This information