b-10

OPERATION

b-10

 

 

 

GAS PURGE PUSHbUTTON

The gas solenoid valve will energize but neither the power source output nor the drive motor will be turned on. The Gas Purge switch is useful for setting the proper flow rate of shielding gas. Flow meters should always be adjusted while the shielding gas is flowing.

FLOW METER

The flowmeter shows the flow rate of shielding gas and has a valve to adjust the flow. The flow meter is scaled for CO2, Ar, and Ar/CO2 blends. The middle of

the ball indicates the flow rate of shielding gas.

Adjust the flow rate while depressing the GAS PURGE switch by turning the valve at the bottom of the meter. Most weld procedures require 25-40 scfh (11.8 - 18.9 lpm) for sufficient shielding gas coverage. Gun angle, nozzle diameter, joint configuration and wind conditions may effect the amount of shielding gas required.

POWER-UP SEQUENCE

On feeders with analog voltmeters, the thermal LED will briefly light during power-up.

If the gun trigger is activated during power up, the feeder will not operate until the gun trigger is released.

When using a wire feeder with a flow meter, adjust the regu- lator at the shield gas bottle or supply to a flow rate that is higher than the flow rate indi- cated on the feeder flow meter. Note that most regula- tors are calibrated based upon having low restrictions on the outlet. The valve on the feeder flow meter creates a high restriction and may cause errors in the readings at the supply regulator. Set the gas flow rate using the feeder flow meter reading and not the supply regulator reading.

SCFH

Liter/Min.

10

4.7

20

9.4

30

14.2

40

18.9

50

23.6

60

28.3

70

33.1

80

37.8

90

 

80

 

70

 

60

 

50

Ball

40

30

 

20

10

Valve

LN-25™ PRO

Image 28
Contents LN-25 Tmpro Safety California Proposition 65 WarningsElectric Shock can kill Welding and Cutting Sparks can Cause fire or explosion IiiPrécautions DE Sûreté Sûreté Pour Soudage a L’ArcElectromagnetic Compatibility EMC Methods of Reducing Emissions Mains Supply Please Examine Carton and Equipment For Damage Immediately ViiOn-Line Product Registration TAbLE of Contents Installation Technical Specifications LN-25 PRO K2613-1, K2613-2Wire SIzES LN-25 PROSafety Precautions LocationHigh Frequency Protection Weld CAbLE SIzE3INSTALLATIONA-3 Power SourceWire Feeder Analog Control CAbLE K1797-xxCAbLE Connections Function Pin WiringShielding GAS Connection Procedure to Install Drive Rolls and Wire Guides Wire Drive ConfigurationChanging the GUN Receiver bUSHING Pressure ARM Adjustment Loading Spools of WireGUN Connection Fe, CrNiAcross the ARC SET-UPS Power Source to LN-25 PRODescription Figure A.7 9INSTALLATIONA-9 Figure A.9Safety Precautions OperationGeneral Description Case Front Controls See Figure b.1 Figure b.1Wire Feed Speed KNOb Wire Feed Speed, CV OperationMinimum Arc Volts Maximum WFS Extra TorquePolarity LED Internal Controls Figure b.2Step Trigger Interlock Switch Internal Controls DescriptionCold Feed PUSHbUTTON Step TriggerConstant Current Wire Welding Figure b-3Itemdescription Rear ControlsPOWER-UP Sequence GAS Purge PUSHbUTTONFlow Meter Liter/MinAccessories Factory Installed EquipmentDrive Roll Kits Electrode SIzEOn at all times Accessories K1500-5 Gun Receiver Bushing compatible Installation of the K590-6 Water Cooling KIT Maintenance Routine MaintenancePeriodic Maintenance CALIbRATION SpecificationWire Feed Speed Validation To change the wire feed speed calibration See Figure D.2Model gearing BOARD LN-25 PROTROUbLESHOOTING Electric Shock can killPRObLEMS SymptomsPOSSIbLE Cause Recommended Course of ActionTROUbLESHOOTING Diagrams Enhanced DiagramDimension Print Precaucion Warnung