Grizzly G0659 Lower Blade Guide Assembly Adjustment, To position the lower blade guide assembly

Page 30

Lower Blade Guide Assembly Adjustment

When it is not possible to accomplish the neces- sary blade guide positioning with the eccentric spindles alone, the entire blade guide assembly must be re-adjusted. First position the lower blade guide assembly, then the upper blade guide assembly.

To position the lower blade guide assembly:

1.DISCONNECT BANDSAW FROM POWER!

2.Move the saw frame forward until it is up to, but not yet entering the slot in the table, as shown in Figure 37, then lock the frame in place using the saw frame stop clamp.

 

Saw Frame Stop Clamp

Blade Guard Cap Screw

 

Blade Guard

Blade

Table

Slot

Figure 37. Blade guide setup.

3.Open the upper wheel door, loosen the blade guard cap screw and remove the blade guard.

4.Loosen set screws A, B, and C on the lower blade guide assembly (Figure 38).

Set Screw B

Set Screws C

Set Screw A

Figure 38. Lower blade guide assembly.

-28-

5.Wearing gloves, hold the blade in-line with the path of the saw and centered over the slot in the table. Rotate the eccentric shaft so the blade guide assembly is centered over the blade, as shown in Figure 39, then tighten set screw A.

Hadi

IVWaZ

 

 

7aVYZ

 

>c"a^cZL^i]EVi]

 

D[HVl

8ZciZgZY

 

7aVYZ<j^YZ

:XXZcig^XH]V[i

6hhZbWan

 

 

HZiHXgZl6

Figure 39. Lower blade guide.

6.Rotate the blade guide assembly and apply just enough pressure to hold the blade flat against both guide rollers. Rotate the eccen- tric spindles so their slots are oriented verti- cally, as shown in Figure 40. This positions the blade guides in the center of their range of motion to facilitate later adjustments.

7.Tighten set screws C.

7aVYZ<j^YZ

;aVc\Z

HZiHXgZl7

:XXZcig^X

He^cYaZh

HZiHXgZlh8

Figure 40. Blade guide positioning.

G06599" x 14" Vertical Metal-Cutting Bandsaw

Image 30
Contents Model G0659 Ss ,EAD from Leadbased PAINTS Table of Contents Introduction Foreword Functional OverviewContact Info Identification Machine Data Sheet Main Specifications Cutting Capacity #4/..3!&%49  !,7!93 53%3 %!2.2 02/4%#4/ %. /0%2!4.! -!#.%293AFETYYNSTRUCTIONSSFORR-ACHINERY Safety Instructions for Metal Cutting Bandsaws 220V Single-Phase Circuit RequirementsUnpacking SetupSetup Safety Inventory Main Components Figure QtySite Considerations Clean UpPlacement Location Floor LoadTools Needed Qty Moving & PlacingLeveling Machine To level the machineBolting to Concrete Floors Mounting to Shop FloorRemoving Shipping Bracket To remove the shipping bracketAssembly To assemble the bandsawTest Run Recommended AdjustmentsFactory adjustments that should be verified To test run the machineOperation Safety Basic Controls OperationsCounterweight controls Upper Wheel Tracking Adjustment Adjusts blade trackingClamp Vise Angle AdjustmentsClamp Vise installation Clamp Vise RemovalCutting Depth To adjust the depth of cutTo adjust the feed rate Feed RateTo adjust the feed pressure Feed Pressure Guide PostTo properly position the guide post Locking Blade Adjusting Saw Frame StopTo adjust the saw frame stop To lock the blade in the forward positionBlade Length Blade SelectionBlade Terminology Blade WidthTooth Set Tooth TypeBlade Pitch TPI To select the correct blade pitch Blade Care Blade Breakage Blade Care Break-In Blade Break-InBlade Tensioning Blade ChangesTo correctly tension the blade Adjusting Blade Guides Upper and Lower Guide Bearing AdjustmentLower Blade Guide Assembly Adjustment To position the lower blade guide assemblyUpper Blade Guide Assembly Adjustment To position the upper blade guide assemblyBlade Tracking Changing Speeds Changes in the blade tension may change the blade trackingTo change the blade speed Workpiece Inspection Cutting TipsTanks, Cylinders, Containers, Valves, Etc Straight Cuts Freehand Cuts To prepare the G0659 for freehand cutsAppearance Chip Inspection ChartAdditional ActionsG7315-Super Heavy-Duty Mobile Base AccessoriesGrizzly Bandsaw Blades G1928-Bandsaw HandbookSchedule MaintenanceCleaning Redressing Rubber TiresLubrication Chip TrayService TroubleshootingMotor & Electrical Cutting Operations MiscellaneousTo align the V-belt pulleys TensioningReplacing V-Belt To check/replace the V-beltWheel Alignment Materials Needed QtyTo check if the wheels are parallel and copla- nar Upper wheel adjustments To adjust the wheel coplanarityTo adjust the blade scraper and brush Blade Scraper Wheel BrushG0659 Wiring Diagram 110 VACMotor junction box wiring G0659 Electrical ComponentsG0659 Hydraulic System Schematic See FigureUpper Saw Frame Breakdown Upper Saw Frame Parts List DescriptionLower Saw Frame Breakdown and Parts List Gearbox Breakdown and Parts List Drive Unit Breakdown and Parts List Table Base Parts Breakdown Table Base Parts List Cabinet Base Breakdown and Parts List Safety Labels Breakdown and Parts List 22!.49 #!2$ 99.$5342!, .# 0//88 %,,.!- 7!  Warranty and Returns #ALL 4ODAYD&ORO! &2%%