Woodstock W1678 instruction manual Table of Contents

Page 3

TABLE OF CONTENTS

 

 

PAGE

INTRODUCTION

2

About Your New 26" Double Drum Sander

2

Woodstock Service and Support

2

Warranty and Returns

3

Specifications

3

SAFETY

4

Standard Safety Instructions

4-5

Additional Safety Instructions for Drum Sanders

6

Avoiding Potential Injuries

7

ELECTRICAL REQUIREMENTS

8

220V Operation

8

Extension Cords

8

Grounding

8

ASSEMBLY

10

Unpacking

10

Box Contents

10

Shop Preparation

11

Initial Cleaning

11

Beginning

12

Dust Port and Handles

13

Control Box

13

Crank and Handle

13

ADJUSTMENTS

14

Drums and Pressure Rollers

14

Dust Scoop Gap

20

V-Belt Tension

21

Conveyor Belt

22

OPERATIONS

23

Overview

23

Control Panel

23

Basic Sanding

24

Troubleshooting

27

MAINTENANCE

29

General

29

Sanding Belts

29

Lubrication

30

Brush Replacement

31

Sandpaper Replacement

21

Bearing Replacement

32

General Cleaning

34

Wiring Diagram

35

CLOSURE

37

Parts Breakdown and Parts List

38-45

USE THE QUICK GUIDE PAGE LABELS TO SEARCH OUT INFORMATION FAST!

-1-

INTRODUCTION SAFETY

ELECTRICAL

ASSEMBLY ADJUSTMENTS OPERATIONS MAINTENANCE

Image 3
Contents Model W1678 Page Table of Contents Woodstock Service and Support IntroductionAbout Your New 26 Double Drum Sander Specifications Warranty and ReturnsStandard Safety Instructions SafetyKeep proper footing and balance at all times SafetyModel W1678 Additional Safety Instructions for Drum SandersNever stand in the path of potential Workpiece kickback Avoiding Potential InjuriesSafety 220V Operation Extension CordsGrounding Assembly Box ContentsUnpacking Shop Preparation Initial Cleaning To install dust ports and handles, do these steps BeginningDust Port Handles Crank and Handle To install the control box, do these stepsTo install the crank and handle, do these steps Control BoxUnplug the Double Drum Sander AdjustmentsTo adjust the drum-to-conveyor squareness, do these steps Drums and Pressure Rollers30 gauge block positioning Step To adjust the drum-to-conveyor parallelism, do these steps25⁄8 gauge block positioning Part 3 Drum-to-Conveyor Height To adjust the drum-to-conveyor height, do these stepsTo adjust pressure-roller spring tension, do these steps Part 4 Pressure Roller AdjustmentDust scoop gap Dust Scoop GapFront panel and mounting screws Belt TensionConveyor belt hanging gap Conveyor BeltOperations Overview Control PanelControl panel offers these controls Operation Basic SandingTo use the double drum sander, do these steps Main power ON/OFF safety switchLoad meter Troubleshooting Long grooves General Sanding Belts MaintenanceLubrication MaintenanceSandpaper Replacement Brush ReplacementSlide the bearing out of the bearing block. See Figure Bearing ReplacementBearing-block grease grove Grease port General Cleaning W1678 26 Double Drum Sander Drive System Wiring DiagramControl System Wiring Diagram Closure Parts Scale 143 146 145 144 142 151 154 110 111 106 105 Pressure Roller 227 Side Panel 337 Magnetic Switch Page Page Page BOX BELLINGHAM, WA Warranty Card