INSTALLATION
Cable connections
Proceed as follows to connect the cables to the Processing unit:
1Remove the bottom cover (terminal cover) to get access to the
2Strip 1 cm (0.4") of the cable's insulation and pull the screen backward to cover the insulation. Position the straps as shown in the figure below and tighten well to make sure the screen has good contact.
3Provide sufficient wire length so that the
4Pull out each terminal before connecting the wires. Remove all stands before putting on the terminal cover.
20221081 / F | 19 |