Bosch Appliances 2400E NG, 2400E LP manual 720 608

Page 18

Installation instructions

3.6.7Exhaust vent configuration examples

Supporting the exhaust vent system

Fig. 18 Horizontal side wall venting installation (combustion air piping not shown)

Note: Pitch venting up 1/4" per foot to termination and add additional condensate drain for vent runs longer than 5 linear feet.

Note: Pitch venting down 1/4" per foot to termination for vent runs less than 5 linear feet.

Note: For horizontal terminations, venting must terminate once it penetrates to the outside of the structure. There should be no sections of vent pipe exposed to the outdoors.

Fig. 20 Vertical venting installation - Interior masonry

Chimney (combustion air piping not shown)

Fig. 19 Vertical venting installation (combustion air piping not shown)

18

6 720 608 263

Image 18 Contents
NG Natural Gas LP Liquefied Petroleum LP Gas Intended for variable flow applicationsWhat to do if you smell gas For your safety IndexIndex FCC Features 2400 E Specifications Technical dataAppliance details Unpacking the 2400 E heater General rules to follow for safe operation VentingDimensions and Minimum installation clearances DimensionsHeater placement and clearances Installation instructionsProper location for installing your heater Mounting installationCombustion air requirements Single pipe methodTwin pipe method Installation instructions Vent lengths Vent material and specificationsVenting Minimum exhaust vent size and lengthVent Safety System Vent connections Exhaust vent connectionCombustion air inlet connection External condensate drain installation not supplied Room sealed installation Twin pipeVent terminations Vertical terminationsHorizontal runs Interior masonry chimneysExterior masonry chimneys Horizontal terminationsInstallation instructions Description Minimum distance 720 608 Gas piping & connections For Natural GAS Static Pressure Test Connecting ManometerMeasuring gas pressure Operating Pressure TestWater connections HotcoldElectrical connections Recirculation applicationOperation instructions For your safety, read before oper- ating your water heaterPower Operation instructionsTemperature selection Operation instructions OffOperation instructions Setting the water temperature Flow/temperature chartOperation Use of optional remote control accessoryReset button Program buttonMaintenance and service Annual maintenanceWinterizing for seasonal use Mineral scale build-up Adjusting CO2Descaling using a pump Once Gas Pressure is adequateMeasuring CO2 Cover Installed Adjusting CO2 cover removedReturning to Service Final ReadingsControl board diagnostics Diagnostic menuWater is too hot TroubleshootingTroubleshooting Water is not hot enoughHot water temperature fluctuates at tap Low water flow/pressureNoisy burner/heater during operation Lack of gas pressure. Inadequate gas pressure will Error code diagnostics Display Cause SolutionMeet desired temperature Troubleshooting Display Cause Solution Check red wire connections at hot waterNo flame ionization detected with water Heat exchanger Flame ionization rod or control unit may be Electrical diagram Electrical diagramFunctional scheme Functional schemeInterior components diagram and parts list Interior components diagram and parts listInterior components Components diagram Components DiagramParts list Description ReferencePacking Protecting the environmentProtecting the environment ComponentsTwelve Year Limited Warranty BBT North America