Southbend SB1038, SB1014, SB1015, SB1037, SB1012, SB1013 owner manual Southbendlathe.com

Page 80

South Bend Lathe Co.

P.O. Box 2027

Bellingham, WA 98227

PHONE: (360) 734-1540 (Administrative Offices)

FAX: (360) 676-1075 (International)

FAX: (360) 734-1639 (USA only)

southbendlathe.com

Printed In Taiwan

#BLTRCR12117

Image 80
Contents 14 & 16 EVS Toolroom Lathes Updates Customer ServiceScope of Manual Manual FeedbackTable of Contents Accessories Features About These MachinesForeword CapabilitiesIdentification Trained/Supervised Operators Only Basic Machine SafetyUnderstanding Risks of Machinery F E T Y Additional Metal Lathe Safety Preparation Overview Things Youll NeedUnpacking Typical preparation process is as followsTool Box Inventory Figure Qty InventoryMain Inventory 1 Figure Qty Basic steps for removing rust preventative Cleaning & ProtectingBefore cleaning, gather the following Location To lift and move your lathe Cross-Section View of Lifting SetupLifting & Moving Leveling & Mounting LevelingBolting to Concrete Floors AssemblyLubricating Lathe Power Connection Adding Cutting FluidTo connect power cord to the lathe Connecting Power Cord to LatheHardwiring Lathe to Power Source Correcting Out-of-Phase Wiring To correct wiring that is out of phaseTest Run To test run your machineControl panel-test run Spindle ON/OFF lever-setup E P a R a T I O N Spindle Break-In To complete the spindle break-inRecommended Adjustments Factory adjustments that should be verifiedOperation Overview Carriage Controls Main Power SwitchHeadstock Controls Control Panel Control panelTailstock Controls Foot Brake Tailstock controlsRemoving Chuck or Faceplate Items Needed QtyMounting Chuck or Faceplate To mount a chuck or faceplateInstalling and Adjusting Camlock Studs Tool Needed QtyJaw Chuck Correct camlock stud alignmentChanging Jaws Mounting WorkpieceItem Needed Qty To change the jawTailstock To mount a workpiece on the 4-jaw chuckUsing Quill Installing ToolingTo install tooling in the tailstock Moving Along BedwayTo align the tailstock offset to the spindle center line OffsettingAligning Looking down from above Move tailstock toward Mounting Workpiece Between Centers FaceplateMounting Workpiece with Clamps Centers Mounting Dead Center in SpindleDead Centers Live CentersRemoving Center from Spindle Mounting Center in TailstockRemoving Center from Tailstock To mount a center in the tailstockFollow Rest To install and use the steady restSteady Rest Compound Slide Four-Way Tool PostTo load the tool post To set the compound slide at a certain angleAligning Cutting Tool with Tailstock Center Tools Needed QtyTo align the cutting tool with the tailstock CenterCarriage Stop Adjustable Apron Stop SystemTo adjust the carriage stop Manual Feed Spindle SpeedPower Feed Setting Spindle SpeedTo use the quick change feed direction knob Power Feed ControlsTo engage the power feed Mod. D.P Understanding Thread & Feed Rate ChartPositioning Gearbox Levers End Gear Setup Normal PositionAlternate Position Configuring End GearsPower Feed Lever Thread Dial & Chart OverviewThreading Controls Half Nut LeverUsing Thread Dial and Chart TPI 4-72 Divisible ByTPI 2-54 Not Divisible By Odd Numbered TPI27⁄8 TPI Chip DrawerOther Fractional TPI Cutting Fluid System To use the cutting fluid system on your latheAccessories High-Precision 3-Jaw Scroll ChucksSBL Gearhead T-Shirt SBL One Good Turn T-Shirt SB1247-MT4 Bull Nose CenterSB1279-10 Pc. Precision 5-C Collet Set Maintenance Schedule CleaningAnnual Service Monitoring Oil Temperature LubricationHeadstock Checking & Adding OilCleaning Pump System & Changing Oil To clean the oil pump systemChanging Oil GearboxApron Lead Screw & Feedrod Bearings Lead ScrewWays & Slides Unpainted & Machined SurfacesBall Oilers Cleaning Electrical Box FilterTo clean the filter Annual Maintenance End GearingHandling & Care LubricatingHazards Adding FluidChanging Cutting Fluid To change the cutting fluidMachine Storage To prepare your machine for short-term storage up to a yearCross Slide Leadscrew Backlash AdjustmentCompound Leadscrew To remove leadscrew end play Leadscrew End Play AdjustmentGib Adjustment Half Nut Adjustment To adjust the half nutFeedrod Clutch Adjustment To adjust the clutch release pointBrake & Switch To adjust the V-beltsTo adjust the brake and brake switch BeltsRe-install the pedal stop, tightening it Leadscrew Shear Pin Replacement To replace the shear pinRe-install the access covers To remove the gap Gap Removal InstallationTo re-install the gap TR O U B L E S H O OTI N G TR O U B L E S H O OTI N G TR O U B L E S H O OTI N G Warranty Southbendlathe.com
Related manuals
Manual 144 pages 14.43 Kb