Grizzly G9249 owner manual Control Panel & Motor Wiring Diagrams, Box

Page 68

control & motor wiring diagrams

Control Panel & Motor Wiring Diagrams

G

To Electrical

Box (Page 65)

'

N\

Control Panel

*

GY

7`

EdlZg

 

 

 

AVbe

(

' C8

&

&

'

 

 

&&

 

 

:bZg\ZcXZHide7jiidc

' C8 &

BdidgHiVgi

7jiidc

Figure 113. Control panel wiring.

Motor 2HP 220V 60Hz

Single-Phase

Run Capacitor 20MFD 400VAC

Start Capacitor

200MFD 250VAC

7`

7`

7`

7`

N\

Figure 114. Motor wiring.

 

7`

 

 

J&

GY

 

 

 

 

GY

 

 

Na

J'

K'

GY

 

 

 

 

GY

 

 

K&

C

 

 

To Electrical

Box (Page 65)

-66-

You MUST read and understand the

G9249  12" x 37" Belt Drive Gap Bed Lathe

Electrical Safety Instructions on Page 63.

 

 

Image 68
Contents Model G9249 Ss ,EAD from Leadbased PAINTS Table of Contents Contact Info IntroductionForeword Functional Overview Identification Machine Data Sheet Tailstock Info Other Specifications  !,7!93 53% !.3 !002/6%$$ 3!&%49 ,!33%33 7%. /0%2!4  !,7!93 53%3 %!2.2 02/4%#4/ %. /0%2!4.! -!#.%29 53%3!!2/5.$%$ %84%.3/..#/2$ 2!4%$4&/2/4%-!#.%!-0%2!%2  53%3 2%#/--%.$%$- !##%33/2%3 -!.9 -!#.%3 #!. %*%#4 7/2+0%#%3 4/7!2$ /0%2!4/2  !,7!93 ,/#+ -/,% !3%3 & 53%$ % %&/2% /0%2!4. -!#.%29#Additional Safety Instructions For Metal Lathes Circuit Requirements 220V OperationSetup Setup SafetyItems Needed for Setup UnpackingInventory Box 1 Inventory Figure QtyClean Up Box 2 Inventory Figure Qty Left Cabinet StandLathe Assembly Placement Placement LocationSite Considerations Floor LoadLoosening the carriage lock bolt Bolting to Concrete Floors Using Machine MountsMounting to Shop Floor Check Gearbox Oil Test RunTo test run the machine Lubrication subsection onMERGENCYG3TOP Utton Spindle Break-In Recommended AdjustmentsFactory adjustments that should be verified Operation Safety OperationsBasic Controls Headstock ControlsCarriage Controls Tailstock ControlsTo remove a chuck or faceplate Chuck & Faceplate Mounting/RemovalTools Needed Qty Mounting a Workpiece Mounting a Chuck or FaceplateTo mount a workpiece in the 3-jaw chuck Using the 3-Jaw ChuckTo remove and install the jaws Using the 4-Jaw Chuck To mount a workpiece on the 4-jaw chuckUsing the Faceplate Installing a Sleeve and Center into the SpindleCenters To mount a workpiece on the faceplateRemoving a Sleeve and Center from the Spindle Installing a Tapered Tool into the QuillTailstock Offsetting Tailstock To set up the tailstock to cut a shallow taperAligning Tailstock To align the tailstock with the headstockStep To remove a tapered drill arbor or drill bit To set up the tailstock for drillingDrilling with Tailstock To install and use the steady rest Steady RestHandwheel Dial Increments Follow RestCross Slide Compound Slide Tool PostsTo set the compound slide angle To load and use the 4-way tool postCalculating the Correct Spindle RPM Configuring the V-Belts and Back GearSpindle Speed To engage the back gears To disengage the back gearsPower Feed To set the feed rate Setting Feed RateRecommended Feed Rates To re-configure the change gears Change GearsSide Front View Change gear. G9249 12 x 37 Belt Drive Gap Bed LatheThreading Operation To cut threadsEdhidc Accessories H3022-Measurement Tool SetPc. Carbide Tipped Tool Bit Sets H2670-HSS Square Tool BitsH2996-Double Ended Boring Bar H5936-2 Pc. Knurling Tool SetH6879-Lathe Operation & Maintenance Book G1070-MT3 Live Center SetSchedule MaintenanceCleaning Protecting Lubrication Spindle Bearing OilLubricant Frequency Qty To add oil to the spindle bearing reservoirsHeadstock Change Gears Headstock Idler Pulley ShaftHeadstock Gears Headstock Spindle Pulley ShaftTo lubricate the feed rate gears Feed Rate GearsApron Gearbox Ball Oilers Back Gear ShaftAdjusting Motor V-Belt To adjust the motor V-belt tensionTensioning Replacing V-Belts Replacing Motor V-BeltPower Twist V-Belt G9249 12 x 37 Belt Drive Gap Bed Lathe Spindle V-BeltMotor & Electrical ServiceTroubleshooting Faceplate Operations To adjust the cross slide and compound slide gibs Adjusting GibsTo adjust the saddle gib To adjust the tailstock lock To adjust the cross slide backlashTailstock Lock Cross Slide BacklashGap Removal Spindle Bearing PreloadDisconnect Lathe from Power To confirm that the bearings are correctly pre- loaded To remove/install the rest fingers To remove/install the brass tipsRest Finger Tips Type of Finger Tip Part NumberAdjusting Half-Nut To adjust the half-nut guide barWiring Electrical Safety InstructionsWiring Overview Diagram onControl Panel MotorElectrical Cabinet Wiring Diagram Control Panel & Motor Wiring Diagrams BoxParts BedHeadstock Headstock Parts List Figured Flat NUT M8-1.25Bushing Feed Rate Gearbox Feed Rate Gearbox Parts List Apron Apron Parts List + + Carriage Parts List #* #+ Spindle Lever Change Gear Cover Complete Steady Rest Complete Follow Rest Electrical Cabinet Electrical Cabinet Parts List Cabinet Stand Accessories Label Placement 22!.49 #!2$ 99.$5342!, .# 0//88 %,,.!- 7!  Warranty and Returns #ALL 4ODAYD&ORO! &2%%