Chicago Pneumatic CPVS 60, CPVS 40, CPVS 50, CPVS 75 instruction manual Contents

Page 4

CONTENTS

 

Space requirement and installation diagram : CPVS Model 40-50-60-75

5

Section 1 - Description

6

A - General Information

6

B - Respect of the environment and prevention of pollution

6

C - Standard equipment

6

D - Definition of the pictograms

7

E - Electronic board

7

Section 2 - Installation

8

A - Handling

8

B - Room

8

C - Assembly

8

D - Air discharge piping

8

E - Condensate drain pipes

8

F - Electric cabling

9

Section 3 - Implementation

10

A - Preparation for start-up

10

B - First start-up

10

C -Discharge pressure adjustment

10

D - Parallel compressor assembly

10

E - Safety

10

Section 4 - Operation

11

A - Air and oil circuits

11

Section 5 - Options

12

A - Level detection bleed valve

12

B - Advanced filtration to the compression air inlet

12

C - Pre-filtration panels

13

D - Automatic restarting

14

E - Remote starting and stopping

14

F - Rotation direction indicator - Phase controller

14

G - Centrifugal separator

15

Section 6 - Specific information for CPVS 40-50-60-75

16

A - Description

16

B - Safety

16

C - Installation

16

D - Commissioning

17

E - Operating incidents

19

Section 7 - Maintenance

20

A - Oil level and change

21

B - Air filter

21

C - Turbine

21

D - Oil and air cooler

22

E - Oil separator

22

F - Oil return pipe

22

G - Draining condensation water

22

H - Temperature safety tests

22

I - Refastening electric connections

22

J - Decommissioning the compressor at the end of its useful life

22

Section 8 - Operating incidents

23

A - Main incidents

23

01/2008

Chicago Pneumatic Compressors

Page 4

62 305 258 65

Image 4
Contents Model Cpvs 40 50 60 CpvsMini + 36 F frost free Maxi + 104 F Cpvs ModelPSI NPTAWG Main Voltage 460 Volt / 3 / 60 HzConnection of the electric plate to an external control box Contents Power Supply AIR DeliveryDescription General InformationRespect of the environment and prevention of pollution Standard equipmentDefinition of the pictograms Electronic boardInstallation Electric cabling Safety RegulationsVoltage Discharge pressure adjustment Parallel compressor assemblySafety Preparation for start-upOperation Air and oil circuitsKey fig Air circuits see FigLevel detection bleed valve Fig OptionsAdvanced filtration to the compression air inlet a and 7b Support grid Pre-filtration panelsFilter Medium Rotation direction indicator Phase controller FeaturesAutomatic restarting Remote starting and stoppingCentrifugal separator See B Section Description of the optionInstallation Safety instructionsSafety Rules Description cf SectionSetting of pressure machine CommissioningPreparation for start-up See Section Control of rotation direction on start upPrinciple of the pressure regulation by variable speed Pressure regulation for low rates of flow Energy savingOperating incidents Main incidentsOperations to be carried out Parts MaintenanceObservations Oil level and change see fig Air filterTurbine OillevelTemperature safety tests Oil and air coolerOil separator see B Section Oil return pipe see figMain incidents See -ESupport@CPcompressor.com