York YR manual Condensers Compact Water Boxes

Page 30

FORM 160.81-EG1

Dimensions (Ft.-In.) – Nozzle Arrangements

CONDENSERS – COMPACT WATER BOXES

FRONT

FRONT

OF UNIT

OF UNIT

1-PASS

NOZZLE

Q

 

 

 

P

ARRANGEMENTS

 

 

 

 

 

 

 

 

 

 

NO. OF

COND.

 

CC

CC

 

 

PASSES

IN

OUT

 

 

 

 

 

1

P

Q

CONDENSER

 

 

 

CONDENSER

Q

P

 

 

 

 

GG

1"

 

1"

GG

 

 

 

 

FLOOR LINE

 

 

 

 

COMPRESSOR END

 

 

MOTOR END

 

 

 

 

 

 

 

 

 

 

FRONT

FRONT

 

 

OF UNIT

OF UNIT

 

U

 

 

 

S

T

 

 

 

R

 

DD

 

DD

 

 

BB

 

BB

 

CONDENSER

 

 

 

CONDENSER

GG

1"

 

1"

GG

 

 

 

COMPRESSOR END

FLOOR LINE

 

MOTOR END

 

 

 

2-PASS

NOZZLE

ARRANGEMENTS

NO. OF

COND.

PASSES

IN

OUT

2

R

S

T

U

 

NOTE: Water must enter through bottom connection to achieve rated performance

FRONT

FRONT

3-PASS

OF UNIT

OF UNIT

 

 

 

 

 

 

NOZZLE

Y

 

 

W

X

 

 

V

 

DD

DD

 

 

BB

BB

 

CONDENSER

 

 

CONDENSER

GG

1"

1"

GG

 

 

COMPRESSOR END

 

FLOOR LINE

 

 

 

MOTOR END

ARRANGEMENTS

NO. OF

COND.

PASSES

IN

OUT

3

V

Y

X

W

 

NOTE: Water must enter through bottom connection to achieve rated performance

LD07982

CONDENSER

NOZZLE PIPE SIZE

 

 

 

 

CONDENSER

 

 

 

 

 

 

NOZZLE DIMENSIONS

 

 

 

SHELL

 

 

 

 

 

 

 

 

 

NO. OF PASSES

 

1-PASS

 

2-PASS

 

 

3-PASS

 

CODE

 

 

 

 

 

1

2

 

3

CC2

G G

BB2

DD2

G G

BB2

D D2

G G

 

 

T, V

10"

6"

 

6"

2'–4-3/4"

1'–3"

1'–9-3/4"

2'–11-3/4"

1'–3"

1'–9-3/4"

2'–11-3/4"

1'–3"

W, X

12"

8"

 

6"

2'–6-3/4"

1'–3-1/2"

1'–11"

3'–2-1/2"

1'–3-1/2"

1'–11"

3'–2-1/2"

1'–3-1/2"

NOTES:

1.Standard water nozzles are furnished as welding stub-outs with Victaulic grooves, allowing the option of welding, flanges, or use of Victaulic couplings. Factory installed, class 150 (ANSI B16.5, round slip-on, forged carbon steel with 1/16" raised face), water flanged nozzles are optional (add 1/2" to nozzle length). Companion flanges, nuts, bolts, and gaskets are not furnished.

2.Add 1" for isolators as shown.

3.One-, two- and three-pass nozzle arrangements are available only in pairs shown and for all shell codes. Any pair of condenser nozzles may be used in combination with any pair of evaporator nozzles.

4.Connected piping should allow for removal of compact water boxes for tube access and cleaning.

5.Front of unit is defined as side of chiller where control center is mounted.

30

YORK INTERNATIONAL

 

Image 30
Contents Ashrae 90.1Compliant Table of Contents Introduction Computerized Performance Ratings RatingsARI Certification Program OFF-DESIGN PerformanceOptiView Control Center Optiview Control CenterDisplay Only Programmable On Setpoint Off Setpoint Set Date Set Time Clock Enabled/Disabled 12/24 Hour Time Remaining Until Next Print Display Messages Solid State Starter Only Lcsss Mechanical Specifications General Mechanical Specifications Form 160.81-EG1Refrigerant System Control PanelYork International Isolation Mounting Startup and Operator TrainingCodes and Standards Refrigerant ContainmentAccessories and Modifications KNOCK-DOWN Shipment SI Metric ConversionMarine Water Boxes Refrigerant STORAGE/RECYCLING SystemApplication Data LocationWater Circuits Multiple Units Parallel Evaporators Parallel CondensersRefrigerant Relief Piping Sound and Vibration ConsiderationsBrine Applications Thermal InsulationElectrical Considerations Ampacity on Line Side of StarterMotor Electrical Data FLA = 50 HZ Electrical Data Motor END Compressor Dimensions TOP View Water BOX Dimensions FT. DIM Evaporators T Condenser T Pass Dimensions Ft.-In. Nozzle Arrangements Evaporators Compact Water BoxesDimensions mm Nozzle Arrangements Evaporators Compact Water BoxesCondensers Compact Water Boxes Passes Dimensions In. Floor Layout Neoprene IsolatorsDimensions mm Floor Layout Dimensions Floor Layout Spring IsolatorsWeights Unit WeightsSolid State Starter Weight Guide Specifications CompressorLubrication System Condenser MotorEvaporator Refrigerant SystemOptiview Control Center Compressor Motor Starter OPTION, 200 Portable Refrigerant STORAGE/RECY- Cling System START-UP and Operator Training