York YR manual Dimensions mm Nozzle Arrangements, Evaporators Compact Water Boxes

Page 29

FORM 160.81-EG1

Dimensions (mm) – Nozzle Arrangements

 

EVAPORATORS – COMPACT WATER BOXES

 

REAR

 

REAR

1-PASS

OF UNIT

 

OF UNIT

 

 

A

H

NOZZLE

 

ARRANGEMENTS

 

 

 

 

CCCC

 

EVAPORATOR

 

 

EVAPORATOR

 

 

1"

 

 

 

GG

 

 

 

GG

 

 

 

1"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR END

 

FLOOR LINE COMPRESSOR END

 

 

 

 

 

NO. OF

EVAP.

PASSES

IN

OUT

1

A

H

H

A

 

REAR

 

 

REAR

OF UNIT

 

 

OF UNIT

 

B

J

 

 

C

K

 

DD

 

 

DD

BB

 

 

BB

 

EVAPORATOR

EVAPORATOR

 

1"

GG

GG

1"

 

FLOOR LINE

 

MOTOR END

 

 

COMPRESSOR END

 

2-PASS

NOZZLE

ARRANGEMENTS

NO. OF

EVAP.

PASSES

IN

OUT

2

C

B

K

J

 

NOTE: Water must enter through bottom connection to achieve rated performance.

REAR

 

 

REAR

OF UNIT

 

 

OF UNIT

 

F

N

 

 

G

P

 

DD

 

 

DD

BB

 

 

BB

 

EVAPORATOR

EVAPORATOR

 

1"

GG

GG

1"

 

FLOOR LINE

 

MOTOR END

 

 

COMPRESSOR END

 

NOZZLE

ARRANGEMENTS

NO. OF

EVAP.

PASSES

IN

OUT

3

G

N

P

F

 

NOTE: Water must enter through bottom connection to achieve rated performance.

3-PASS

LD07615

EVAPORATOR

NOZZLE PIPE SIZE

 

 

 

 

EVAPORATOR

 

 

 

 

 

 

 

 

NOZZLE DIMENSIONS

 

 

 

 

SHELL

 

 

 

 

 

 

 

 

 

 

 

 

 

NO. OF PASSES

 

1-PASS

 

 

2-PASS

 

 

3-PASS

 

CODE

 

 

 

 

 

 

 

1

 

2

 

3

CC2

G G

BB2

 

DD2

G G

BB2

D D

 

G G

 

 

 

 

 

T, V

8"

 

6"

 

4"

578

343

330

 

775

343

330

775

 

394

W, X

10"

 

8"

 

6"

629

445

425

 

832

445

425

832

 

445

NOTES:

1.Standard water nozzles are furnished as welding stub-outs with Victaulic grooves, allowing the option of welding, flanges, or use of Victaulic couplings. Factory installed, class 150 (ANSI B16.5, round slip-on, forged carbon steel with 1/16" raised face), water flanged nozzles are optional (add 1/2" to nozzle length). Companion flanges, nuts, bolts, and gaskets are not furnished.

2.Add 1" for isolators as shown.

3.One-, two- and three-pass nozzle arrangements are available only in pairs shown and for all shell codes. Any pair of evaporator nozzles may be used in combination with any pair of condenser nozzles.

4.Connected piping should allow for removal of compact water boxes for tube access and cleaning.

5.Rear of unit is defined as side of chiller opposite control center.

YORK INTERNATIONAL

29

Image 29
Contents Compliant Ashrae90.1 Table of Contents Introduction ARI Certification Program RatingsComputerized Performance Ratings OFF-DESIGN PerformanceOptiview Control Center OptiView Control CenterDisplay Only Programmable On Setpoint Off Setpoint Set Date Set Time Clock Enabled/Disabled 12/24 Hour Time Remaining Until Next Print Display Messages Solid State Starter Only Lcsss Mechanical Specifications Refrigerant System Mechanical Specifications Form 160.81-EG1General Control PanelYork International Codes and Standards Startup and Operator TrainingIsolation Mounting Refrigerant ContainmentAccessories and Modifications Marine Water Boxes SI Metric ConversionKNOCK-DOWN Shipment Refrigerant STORAGE/RECYCLING SystemWater Circuits Application DataLocation Parallel Evaporators Parallel Condensers Multiple UnitsBrine Applications Sound and Vibration ConsiderationsRefrigerant Relief Piping Thermal InsulationMotor Electrical Data Electrical ConsiderationsAmpacity on Line Side of Starter FLA = 50 HZ Electrical Data Motor END Compressor TOP View DimensionsWater BOX Dimensions FT. DIM Evaporators T Condenser T Pass Evaporators Compact Water Boxes Dimensions Ft.-In. Nozzle ArrangementsEvaporators Compact Water Boxes Dimensions mm Nozzle ArrangementsCondensers Compact Water Boxes Passes Neoprene Isolators Dimensions In. Floor LayoutDimensions mm Floor Layout Spring Isolators Dimensions Floor LayoutSolid State Starter Weight WeightsUnit Weights Lubrication System Guide SpecificationsCompressor Evaporator MotorCondenser Refrigerant SystemOptiview Control Center Compressor Motor Starter OPTION, 200 START-UP and Operator Training Portable Refrigerant STORAGE/RECY- Cling System