Mechanical Specifications (continued)FORM 160.81-EG1
11.A numbered terminal strip for all required field in- terlock wiring.
12.An
13.The capability to interface with a building automa- tion system to provide:
a.remote chiller start and stop
b.remote leaving chiller liquid temperature adjust
c.remote current limit setpoint adjust
d.remote ready to start contacts
e.safety shutdown contacts
f.cycling shutdown contacts
g.run contacts
STARTUP AND OPERATOR TRAINING
The services of a
CODES AND STANDARDS
•ASME Boiler and Pressure Vessel Code – Section Vlll Division 1.
•ARI Standard 550/590
•c/U.L. – Underwriters Laboratory
•ASHRAE 15 – Safety Code for Mechanical Refrig- eration
•ASHRAE Guideline 3 – Reducing Emission of Ha- logenated Refrigerants in Refrigeration and
•NEC – National Electrical Code
•OSHA – Occupational Safety and Health Act
ISOLATION MOUNTING
The unit is provided with four vibration isolation mounts consisting of 1" (25.4 mm) thick neoprene isolation pads for field mounting under the steel mounting pads lo- cated on the tube sheets.
REFRIGERANT CONTAINMENT
The standard unit has been designed as a complete and compact factory packaged chiller. As such, it has minimum joints from which refrigerant can leak. The entire assembly has been thoroughly leak tested at the factory prior to shipment. The YORK chiller in- cludes service valves conveniently located to facili- tate transfer of refrigerant to a remote refrigerant stor- age/recycling system. Optional condenser isolation valves permit storage of the charge in the condenser.
PAINT
Exterior surfaces are protected with one coat of Carib- bean blue, durable
SHIPMENT
The unit shall be completely assembled, with all main, auxiliary, and control piping installed, controls wired, leak tests completed, functional run tests completed, and refrigerant charge in place. The oil charge, relief device and other miscellaneous materials shall be packed separately.