Conair UGH016/0500 Preparing for Installation, Grounded power source, Available water source

Page 24

PREPARING FOR INSTALLATION

Plan the location for the chiller and prepare the area properly.

Position the Chiller as close to the process machine as possi- ble. Place the chiller in position near the process machine so that fluid lines can be connected from the process machine to the chiller and back.

Chiller

Process machine

Alternate

locations

Make sure the area where the chiller is installed has:

A grounded power source.

Check the chiller’s serial tag for the correct amps, volt- age, phase, and cycle. All wiring should be completed by qualified personnel and comply with your region’s elec- trical codes.

Clearance for safe operation and maintenance. Make sure there is two feet clearance around the chiller for proper operation, maintenance, and servicing. After positioning, lock casters to prevent chiller from moving.

 

24 inches

24 inches

(610 mm)

(610 mm)

 

 

24 inches

 

(610 mm)

 

24 inches

 

(610 mm)

Available water source.

If installing a water-cooled unit, makes sure water source is plumbed to chiller installation location. High points in plumbing require vent valves; low points require drain valves.

3-4

INSTALLATION

Series 1 Portable Chillers, TIC Control

UGH016/0500

Image 24
Contents Portable Chillers Conair GROUP, INC Table of Contents IntroductionParts and Diagrams . . . . . . . . . . . .P/D-1 Introduction Purpose User Guide HOW Guide is OrganizedYour Responsibility AS a User Read this SO no ONE Gets Hurt Page Description What is Portable CHILLER? Temperature Typical ApplicationsCooling load LocationHOW IT Works WATER-COOLED Portable Chiller Process circulationHOW IT Works HOW IT Works AIR-COOLED Portable Chiller HOW IT Works AIR-COOLED Portable ChillerChiller Features Water-cooled ModelsPortable Chiller Features Air-cooled ModelsSpecifications ModelSpecifications Pump Curves Installation Unpacking the Boxes UGH016/0500 Series 1 Portable Chillers, TIC Control Preparing for Installation Grounded power sourceAvailable water source Making Process Plumbing Connections Wrap threads with Mylar or Teflon tapeConnect the To Process valve and tubing on Filling the Chiller Attach water hose to Fill/Drain valveOpen the Fill/Drain valve and fill chiller Close the Fill/Drain valveChange the minimum operating temperature Check the coolant levelChecking Refrigerant Charge Connecting Main Power Source Connect the ground wire to grounding lugClose the electrical enclosure Turn on main power source Checking Electrical ConnectionsOpen electrical enclosure Initially Starting Chiller Press the Start Chiller buttonCheck the rotation of the pump Check the compressorStopping the Chiller Operation TIC Control Features DisplayBefore Starting Check that the casters are lockedStarting Stopping Chiller Changing Settings Changing Setpoint TemperaturePress Menu button once Press the Up/Down arrowsChanging Temperature Scale Changing to Auto Tune ModeChanging Auto Tune Mode Use the Up/Down arrows to changePress Enter button Apply a load to the ChillerSetting the to Process LOW Limit Maintenance Maintenance Features UGH016/0500 Series 1 Portable Chillers, TIC Control Preventative Maintenance Schedule Checking electrical connectionsInspecting the condenser coil for debris Checking refrigerant site glassCleaning Cleaning process fluid strainerInspecting cooling water treatment system Inspecting condenserCheck the refrigerant charge through the sight glass Cleaning Evaporator or WATER-COOLED Condenser Cleaning AIR-COOLED Condenser Coil cleanerInspect the coils Use a flashlight to check between coil surfacesBe sure the main power is disconnected Disconnect and lockout power to the chiller Checking Reservoir LevelLocate the fill port on the back of the chiller Refill the reservoirTroubleshooting Before Beginning FEW Words of CautionIdentifying Cause Problem DAY TimeAnswering AN Alarm Pump Compressor Alarm Condition Description StatusControl Problems Power is not reaching the chillerThere is a problem with the control panel Symptom Possible cause Solution Input voltage is incorrect There is a phase lossFailed Level switch Mechanical ConditionsWater level in tank is low Low Faulty contactor Faulty overload modulePump Overload Overload set incorrectly. pump and compres Low supply voltageAlarm Possible cause Overload set incorrectlyClogged/dirty air-cooled Compressor discharge Valve closedFailed flow switch Pressure switch isFaulty No or low flow with aCompressor failed Contact Conair Service Leads are backwardsChecking Replacing Switches Check the switchReplace the switches as needed Slide the top of the switch housing over untilDisconnect the wiring from the contactor Reconnect the wiring and reconnect powerReplacing the Contactor Remove the contactor by snapping offChecking and Replacing Replacing Temperature Controller Contact Conair Service for the temperatureSlide the new controller in until Reconnect wires and leads Restore power to the chillerReplacing Overload Modules Rating of compressor, fan or pumpReplacing Fuses Remove and replace fusesRemove the pump assembly Inspect, clean, and replace pump partsRemoving Pump Components Open the drain/fill valveChecking Pressure Switches Locate the pressure switchDAY Time Check the connectionsCheck the continuity within the switch Make sure it corresponds to the following conditionsPage WE’RE Here to Help From outside the United States, call2SERVICE Information Warranty Information Maintenance LOG Date Maintenance ItemPage Pressure Tables Appendix C-2Control Settings Display Parameter Description Setting UnitsPage Parts & Diagrams Recommended Spare Parts Part Number DescriptionSpare Parts P/D-3 4SPARE Parts Spare Parts P/D-5 6SPARE Parts