Glycol, % by Volume
| Temperature of Process Fluid °F |
|
|
2 | Close the To Process and From Process valves. |
|
|
3 | Open the Fill/Drain valve and fill chiller |
| to the fill mark on the Water Level gauge. If the chiller is |
| overfilled, the excess fluid spills out the vent tube. DO |
| NOT OVERFILL. |
|
|
4 | Close the Fill/Drain valve. |
|
|
5 | Check the coolant level. |
| Once the chiller is turned on, the coolant level may drop |
| as the coolant begins to circulate, filling the connected |
| plumbing. Check the coolant level on the back of the |
| chiller. The water level shows on the water level gauge. |
| Make sure water level is filled to the mark on the gauge. |
|
|
6 | Change the minimum operating temperature |
| range to the correct setting for the percent glycol used. |
| See Setting the To Process Low Limit, in the Operations |
| section. |
FILLING THE CHILLER
CONT’D
UGH016/0500 | Series 1 Portable Chillers, TIC Control | INSTALLATION |