
Before you start daily operation of the chiller, you need to perform scheduled preventative maintenance. Necessary main- tenance is describe in the Maintenance section of this Users Guide.
WARNING: Electrical hazard
Be sure that power to the chiller is OFF when doing any maintenance on the chiller. Follow all safety rules when performing any maintenance on this equipment.
Daily maintenance includes:
●Checking electrical connections
●Checking process fluid level in the pump tank
●Checking the condenser coil for debris
●Verifying pump discharge pressure
●Inspecting piping for leaks
NOTE: The daily, weekly, monthly, and
Before starting the Chiller be sure to:
●Open the To Process valve to the full open position.
●Open the From Process valve
to the 3/4 open position. You will need to adjust this valve when the chiller is running to obtain the desired pump discharge pressure. To find the approximate water flow, refer to the Pump Curves in Description section.
BEFORE STARTING
From Process valve
To Process valve
●Check that the casters are locked.
UGH016/0500 | Series 1 Portable Chillers, TIC Control | OPERATION |