Lincoln Electric DC-655 service manual SCR Rectifier Bridge Removal, Replacement Procedure

Page 94

Return to Section TOC

Return to Section TOC

TOC

Return to Master TOC

Return to Master TOC

TOC

F-52

F-52

TROUBLESHOOTING & REPAIR

SCR RECTIFIER BRIDGE REMOVAL AND

REPLACEMENT PROCEDURE (continued)

FIGURE F.19 - THERMAL FAN/SNUBBER BOARD PLUG LOCATIONS

THERMAL FAN / SNUBBER L10124-[ ]

LED2

LED6

LED5LED4

LED1

LED3

PLUG J20

 

 

 

PLUG J9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROCEDURE

Return to Section

Return to Master

1.Remove the input power to the DC-655 machine.

2.Using the 3/8” wrench, remove the case top and sides.

3.Locate and remove plugs J9 and J20 from the Thermal Fan/Snubber Board. See Figure F.19.

4.Disconnect lead #222 from the negative high inductance output terminal. This lead runs from plug J9 to the negative high inductance output terminal. Cut any necessary cable ties. See the Wiring Diagram.

Return to Section TOC

Return to Master TOC

IDEALARC DC-655

Image 94
Contents Idealarc DC-655 Safety California Proposition 65 WarningsElectric Shock can kill Cylinder may explode if damaged Précautions DE Sûreté Master Table of Contents for ALL Sections Table of Contents Installation Section Installation Technical Specifications DC-655Input Power Three Phase Select Suitable Location Safety PrecautionsElectrical Input Connections Input Power Supply Connections Input Supply Connection DiagramOutput Connections Electrode and Work CablesAuxiliary Power Control Connections Auxiliary Power TableTerminal Strip 1 T.S.1 Terminal Strip 2 T.S.2Table of Contents Operation Section OPERATIONB-2 Operating InstructionsGeneral Description Design Features AdvantagesOperation Recommended Processes and EquipmentDC-655 Figure B.2 Lower Case Front Controls & Connections Machine Protection Auxiliary PowerCase Back Connections Thermal Shutdown Remote Control Leads Fault Protection SHUTDOWN1Over Current Protection Shutdown CC Mode ARC Force CC Mode ARC Gouging CV Mode CURRENT-LIMITINGCC Mode HOT Start Welding PerformanceTable of Contents Accessories Field Installed Options Remote Output ControlAutomatic Wire Feeders SEMI-AUTOMATIC Wire FeedersSet the Idealarc DC-655 Power toggle Accessories Semiautomatic Wire Feeders Connecting the LN-7 to the Idealarc DC-655 Terminal Strip GND Negative Positive Figure C.4 Idealarc DC-655 Table of Contents Maintenance General Maintenance Electric Shock can killFigure D.1 General Component Locations Idealarc DC-655 Table of Contents Theory of Operation Section Theory of Operation Down Circuits Protective Devices and Shutdown Circuits SCR Operation Figure E.4 SCR OperationIdealarc DC-655 Table of Contents Troubleshooting & Repair Section Troubleshooting & Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Troubleshooting Guide Board LED Chart ControlBridge Test LED ChartOutput Perform the SCR Bridge TestMain See the Idle Shut Down TimerTransformer Test Function Problems Thermal Fan/Snubber PC Troubleshooting & Repair Welding Problems Mode Current Limiting See the Control BoardTest Description Internal Trigger Circuit TestMaterials Needed Trigger Diagram Test ProcedureInternal Trigger Circuit Test Simplified Trigger Diagram. If a resistance SectionFigure F.3 Simplified Trigger Diagram Firing Board Test Firing Board Test Figure F.4 Firing Board Trigger Circuit Test Points and LEDsMain Transformer Test Figure F.5 14-PIN Receptacle Figure F.4 Main Transformer T1 Voltage Test Main Transformer T1 Voltage Test Figure F.6 Input Contactor and Primary LeadsTroubleshooting & Repair Figure F.8 Terminal Strip Figure F.9 Firing Board Plug J5 Pins Control Transformer T2 Test Control Transformer T2 Test Figure F.10 Control TransformerHigh Voltage is present at Control Board Transformer T3 Test Control Board Transformer T3 Test Perform the Control Transformer T2 TestInput Contactor Test Input Contactor Test Transformer T2 TestTest for Contact Continuity Figure F.13 Input Contactor Test ConnectionsStatic SCR Test Static SCR Test Figure F.15 Heat Sink Test Points Active SCR Test Active SCR Test Figure F.17 Heat Sink Test Points Anode Cathode Thermal FAN/SNUBBER Board LED Chart LED Functions and IndicationsControl Board LED Chart LED # LED Functions and IndicationsScope Settings Maximum Output Setting no Load Normal Open Circuit Voltage Waveform Constant Voltage MIGMinimum Output Setting no Load Troubleshooting & Repair Typical SCR Gate Voltage Waveform Constant Voltage MIG Installation Input Contactor CR1 CLEANING/REPLACEMENT DescriptionInput Contactor CR1 CLEANING/REPLACEMENT Cleaning ProcedureSCR Rectifier Bridge Removal Replacement Procedure Procedure Replacement ProcedureSCR Rectifier Bridge Removal Reassembly SCR Rectifier Bridge LEG Assembly Mounting BracketsMain Transformer and Choke Removal Replacement Procedure Main Transformer and Choke Removal Output Choke RemovalMain Transformer Removal Retest After Repair Input Idle Amps and WattsSVM Error Reporting Form Section G Electrical Diagrams Control Board Schematic G3384 Firing Board Schematic G2792 Thermal Fan/Snubber Board Schematic L10123 Control Board Layout G3385-1 Firing Board Layout G2699-2 Thermal Fan/Snubber Board Layout L10124-1 Return to Section TOC