Envision Peripherals IM1609 10 Dimensional Data Slope Top Cabinet, NCS09-18, Configuration

Page 7

ENVISION CONSOLE INSTALLATION MANUAL

Dimensional Data - Slope Top Cabinet

NCS09-18

@756B@3BC@<

:34B@3BC@<

B=>

4

2

3

/

47:B3@0@/193B

23B/7:/

BE7AB3FB3<232B/0 0/19/<24=@B6C<B7: B/00@3/9A=44 =<:G0@3/9=44 B/0A/;3A723/A 5@7::3:72/AA6=E<

@3;=D3>:/AB71AB@7> 4@=;0@=93<B/0/<2 @3>:/13=<0@=93< 3253=4:35/AA6=E<

/

6

4@=<B

0

5

7

0

47:B3@0@/193B

1

8 23B/7:0

BE7AB3FB3<232B/0 0/19/<24=@B6C<B7: B/00@3/9A=44 =<:G0@3/9=44 B/0A/;3A723/A 5@7::3:72/AA6=E<

@3;=D3>:/AB71AB@7> 4@=;0@=93<B/0/<2 @3>:/13=<0@=93< 3253=4:35/AA6=E<

Slope Top

Overall Cabinet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

B

C

D

E

F

G

H

I

J

Configuration

Width

Depth

Height

Grille Lid

Grille

Grille

 

 

 

 

 

 

Length

Width

 

 

 

 

 

 

 

 

 

 

 

 

 

 

09-12

in.

45.0

11.1

28.6

9.2

35.0

6.1

2.8

44.1

10.3

4.3

cm.

114.3

28.2

72.6

23.4

88.9

15.6

7.2

112.0

26.0

10.9

 

 

 

 

 

 

 

 

 

 

 

 

 

15-18

in.

50.0

12.6

29.1

9.2

35.0

6.1

2.5

49.1

11.8

4.3

cm.

127.0

32.0

73.9

23.4

88.9

15.6

6.4

124.7

29.8

10.9

 

6

Image 7
Contents Envision Console Installation Manual Page Table of Contents NC C Model NomenclatureMoving and Storage General Installation InformationSafety Considerations Refrigerant SystemsNCW09-18 Dimensional Data Flat Top CabinetSlope Top Dimensional Data Slope Top CabinetConfiguration NCS09-18NCE09-18 Dimensional Data Extended Slope Top CabinetExt. Slope Top Dimensional Data Right Return Controls Detail  Dimensional Data Right Return ChassisDimensional Data Left Return Controls Detail # Dimensional Data Left Return ChassisMark Unit Position Installation StepsPipe Locations Provide Water and Condensate Drain ConnectionsFinal Water Connection Provide Line Voltage WiringChassis Installation Final Electrical ConnectionTop view Side view Field Converting ConsoleCleaning and Flushing System Cleaning and FlushingGround Source Loop System Checkout Water Quality Open Loop Ground Water SystemsGeneral Microprocessor Remote Thermostat WiringElectrical Connections Auxiliary Heat RatingsFan Performance Data Unit Electrical Data208-230-265/60/1 Wiring SchematicControl Module CCM w/EH Electronic Thermostat 208-230-265/60/1LED Display Mode Table Versatec Control EH & Remote Wall Thermostat 208-230-265/60/1 Schematic aPSC FX10 EH 208-230-265/60/1Envision Console Controls Standard CCM Control FeaturesOptional Versatec Microprocessor Control Features Control Tables for Optional Versatec Microprocessor Logic Board DIP Switch SettingsOptional FX10 Control Zone Sensors Control Timing & Fault Recognition DelaysStandard Features Optional FX10 Microprocessor and BAS InterfaceSequence of Operation Control and Safety Feature DetailsCompressor Short Cycle Delay Time Random Start DelayCompressor Fixed On Delay Time Compressor Minimum On DelayControl Accessories Inputs & Outputs ConfigurationFX10 User Interface MUI Physical Layout  Info Status Temps Outputs SettingsLogin Required N2 Open LonWorks Point Description LonWorksBACnet Point Description BACNetAnalog Value Type BACnet VariablesAnalog Input Type Analog Output TypeMultistate Output Type Multistate Input TypeElectrical Disconnect Hydronic Loop Controller for Boiler/Tower InstallationsUnit Startup Notes Emergency Electric Resistance HeatBefore Powering Unit, Check The Following Unit Startup Checklist / Unit Startup StepsStartup Steps Unit Operating Limits Unit Operating ParametersSingle Speed Models Startup/Troubleshooting Form Pressure Drop Other Maintenance Preventive MaintenanceReplacement Procedures Water Coil MaintenancePage Envision Series Console