Chapter 2: Installation
Chapter 2
Installation
2.1. Installation Overview
CAUTION:
Please note that the installation instructions described in this manual should be carefully followed. Failure do to so may result in damage to the system.
2.2.Installation Prerequisites
1.Static- free installation environment: The SR controller must be installed in a static free environment to minimize the possibility of electrostatic discharge (ESD) damage. (See Section 2.3.2).
2.Component check: Before the SR controller is installed, you should confirm that you have received all the components on the Unpacking List during the unpacking process. (See Section 2.5 )
3.Memory modules: Modules must be separately purchased and installed. (See Section 2.7)
4.Hard drives:
5.Cabling: All the SCSI cables that are used to connect the SR controller to the host and drives must be purchased separately. (See Section 4.2.1)
2.3.Safety Precautions
2.3.1General Considerations
♦Power source: Make sure the power source is within the correct power range prior to powering on.
♦Earth: Always make sure the controller has a safe electrical earth connection via the power cords or chassis ground on the rack/cabinet.
♦Ventilation: Be sure that the rack cabinet provides sufficient ventilation channels and airflow circulation throughout the enclosure in which the SR controller is installed.
Installation Overview |