SentinelRAID 170 Installation and Hardware Reference Manual
Figure 2-7: Install the Daughter Board
Step 3. Insert the retention screws. Once the daughter board has been mounted on the
Figure 2-8: Install the Daughter Board Retention Screws
Step 4. Replace the chassis top cover. Once the daughter board has been installed on the controller board, reinstall the chassis top cover. For further instructions on how to reinstall the chassis top cover, please refer to Section 2.6.2.
Daughter Board Installation |