York BP 090, BP120 installation manual Superheat Charging, Cooling Superheat 7-1/2 TON

Page 38

66307-YIM-B-0606

TABLE 35: SUPERHEAT CHARGING

SUCTION PRESSURE

 

 

 

 

 

 

SUCTION TUBE TEMPERATURE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PSIG (Service Port)

0*

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

 

61.5

35

37

39

41

43

45

47

49

51

53

55

57

59

61

63

65

67

69

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

64.2

37

39

41

43

45

47

49

51

53

55

57

59

61

63

65

67

69

71

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

67.1

39

41

43

45

47

49

51

53

55

57

59

61

63

65

67

69

71

73

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

70

41

43

45

47

49

51

53

55

57

59

61

63

65

67

69

71

73

75

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

73

43

45

47

49

51

53

55

57

59

61

63

63

67

69

71

73

75

77

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

76

45

47

49

51

53

55

57

59

61

63

65

67

69

71

73

75

77

79

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

79.2

47

49

51

53

55

57

59

61

63

65

67

69

71

73

75

77

79

81

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

82.4

49

51

53

55

57

59

61

63

65

67

69

71

73

75

77

79

81

83

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

84.1

50

52

54

56

58

60

62

64

66

68

70

72

74

76

78

80

82

84

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

92.6

55

57

59

71

73

65

67

69

71

73

75

77

79

81

83

85

87

89

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*. From TMP chart.

TABLE 36: COOLING SUPERHEAT 7-1/2 TON

 

 

 

 

 

SUCTION SUPERHEAT °F

 

 

 

 

OUTDOOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDOOR WB TEMP °F

 

 

 

 

TEMP °F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

55

57

59

61

63

65

67

69

71

73

75

 

 

 

 

 

 

 

 

 

 

 

 

65

34.5

34.8

35.1

35.4

35.6

35.9

36.2

37.0

37.7

38.5

39.2

 

 

 

 

 

 

 

 

 

 

 

 

70

32.5

32.9

33.3

33.7

34.1

34.5

34.9

35.8

36.7

37.5

38.4

 

 

 

 

 

 

 

 

 

 

 

 

75

30.4

31.0

31.5

32.0

32.5

33.0

33.6

34.6

35.6

36.6

37.6

 

 

 

 

 

 

 

 

 

 

 

 

80

28.4

29.0

29.7

30.3

30.9

31.6

32.2

33.4

34.5

35.7

36.8

 

 

 

 

 

 

 

 

 

 

 

 

85

26.3

27.1

27.9

28.6

29.4

30.1

30.9

32.2

33.5

34.7

36.0

 

 

 

 

 

 

 

 

 

 

 

 

90

22.0

23.0

23.9

24.9

25.8

26.8

27.8

29.5

31.2

33.0

34.7

 

 

 

 

 

 

 

 

 

 

 

 

95

17.7

18.9

20.0

21.2

22.3

23.5

24.6

26.8

29.0

31.2

33.4

 

 

 

 

 

 

 

 

 

 

 

 

100

13.9

14.9

15.9

17.0

18.0

19.0

20.1

22.5

24.9

27.3

29.8

 

 

 

 

 

 

 

 

 

 

 

 

105

10.0

10.9

11.8

12.8

13.7

14.6

15.5

18.2

20.8

23.5

26.1

 

 

 

 

 

 

 

 

 

 

 

 

110

6.2

7.0

7.8

8.6

9.4

10.2

11.0

13.8

16.7

19.6

22.5

 

 

 

 

 

 

 

 

 

 

 

 

115

-

-

-

-

5.0

5.7

6.4

9.5

12.6

15.8

18.9

 

 

 

 

 

 

 

 

 

 

 

 

38

Unitary Products Group

Image 38
Contents Installation Manual 50 Hz Single Package Heat Pump High EfficiencyTable of Contents List of Figures List of Tables Inspection Safety ConsiderationsGeneral Approvals ReferenceRenewal Parts Ton York Model Number Nomenclature NomenclaturePreceding Installation InstallationInstallation Safety Information Unit Voltage Limitations LocationRigging and Handling Unit WeightsPoint Load Weight Detail B ClearancesUnit Clearances BttomPower Rear Duct Dimensions Ductwork Duct Covers Predator Roof Curb Dimensions Compressors Thermostat WiringControl Wire Sizes FiltersPower Wiring Detail Electronic Thermostat Field WiringGroundlug Electrical Data 7-1/2 TON HP Electrical Data 10 TON HPPhysical Data Factory Installed Options Field Installed AccessoriesElectric Heat Accessory Electric Heat OptionElectric Heat Minimum Supply AIR Enthalpy SET Point Chart Indoor AIR Quality AQBelt Tension Blower RotationSupply AIR Limitations Belt Adjustment Blower Performance 7-1/2 TON Standard Motor Side Duct Metric Blower Performance 10 TON Standard Motor Side Duct Imperial Blower Performance 10 TON Standard Motor Side Duct MetricBlower Performance 10 TON Optional Motor Side Duct Imperial Blower Performance 10 TON Optional Motor Side Duct MetricBlower Performance 7-1/2 TON Standard Motor Downshot Metric Blower Performance 10 TON Standard Motor Downshot Metric Blower Performance 7-1/2 TON Optional Motor Downshot MetricBlower Performance 10 TON Standard Motor Downshot Imperial Blower Performance 10 TON Optional Motor Downshot Metric Indoor Blower SpecificationsBlower Performance 10 TON Optional Motor Downshot Imperial Method ONE AIR BalanceChecking AIR Quantity Method TWOSupply AIR Drive Adjustment DRY Coil Delta PCFM Additional Static Resistance ImperialAdditional Static Resistance Metric M3SSequence of Operations Overview OperationMotor Sheave Datum Cooling Sequence of OperationCooling Operation Errors Compressor Protection Safety ControlsReset Heating Sequence of OperationSTART-UP Superheat Charging Method Operating InstructionsPost Start Check List Superheat Charging Cooling Superheat 7-1/2 TONPredator Flash Codes TroubleshootingCooling Superheat 10 TON Unit Control Board Flash Codes Unit Control BoardCooling Troubleshooting Guide Page Page Unitary 5005 Norman Products York Group Drive 73069