A
A
C*
* NEVER LOOSEN
A
B
SPAN LENGTH
DEFL. FORCE
FIGURE 22 - BELT ADJUSTMENT
Procedure for adjusting belt tension:
1.Loosen six nuts (top and bottom) A.
2.Adjust by turning (B).
3.Never loosen nuts (C).
4.Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span as shown. Deflection distance of 4mm (5/32”) is obtained.
To determine the deflection distance from normal position, use a straight edge from sheave to sheave as reference line. The recommended deflection force is as follows:
Tension new belts at the max. deflection force rec- ommended for the belt section. Check the belt ten- sion at least two times during the first 24 hours of operation. Any retensioning should fall between the min. and max. deflection force values.
5. After adjusting retighten nuts (A).