Lochinvar 399, 999 - 750, CF-CH(E)-i&s-08 service manual Venting Guidelines

Page 20

Hydronic Heating Boilers and Domestic Water Heaters

INSTALLATION Continued

The following is a detailed explanation of Sidewall Venting Without an External Power Vent Fan installation requirements.

Flue Outlet Piping

Venting Guidelines

If using this venting option, a sealed AL29-4C venting system for flue products is required on all models of this appliance. This venting system operates with a positive pressure in the vent. The internal combustion air blowers generate this positive pressure which operates the combustion process and also exhausts the flue products from the building.

This vent system has specific vent material and installation requirements. Only use listed sealed AL29-4C vent system materials. Follow all installation requirements. See TABLE–B, page 13 for proper pipe size for your unit. A list of sealed AL29-4C flue pipe manufacturers is located on page 24.

Seal all vent joints and seams gas-tight.

Drain Tee Installation

A drain tee must be installed in the vent pipe to collect and dispose of any condensate that may occur in the vent system. The drain tee must be installed as the first fitting after the horizontal ell on the top of the unit. Plastic drain tubing, sized per the vent manufacturer’s instructions, shall be provided as a drain line from the tee. The drain tubing must have a trap provided by a 3" (7.6cm) diameter circular trap loop in the drain tubing. Prime the trap loop by pouring a small quantity of water into the drain hose before assembly to the vent. Secure the trap loop in position with nylon wire ties. Use caution not to collapse or restrict the condensate drain line with the nylon wire ties. The condensate drain must be routed to a suitable drain for disposal of condensate that may occur in the direct vent system. Refer to the condensate drain installation instructions as supplied by the manufacturer of the vent material.

FIG. 22 Sidewall Vent

WARNING: Do not combine the flue from this unit with the vent from any other appliance. Do not combine flues from multiple appliances into a common vent. The flue from this unit must be a dedicated stack.

Connect the flue vent directly to the flue outlet opening on the top of unit. Make the connections from the unit vent to the outside stack as direct as possible with no reduction in diameter. Provide adequate clearance to combustibles for the vent connector and firestop. Follow the vent manufacturer’s instructions when installing sealed AL29-4C vents and accessories, such as firestop spacers, vent connectors, thimbles, caps, etc.

Provide adequate clearance to combustibles for the vent connector and firestop.

When planning the venting system, avoid possible contact with plumbing or electrical wiring inside walls, ceilings, and floors.

Locate the unit as close as possible to chimney or gas vent. When a vent system is disconnected for any reason, the flue must be reassembled and resealed according to the vent manufacturer’s instructions.

The installed length of flue from the unit to the outside point of termination must not exceed 50 equivalent feet (15.2m). Subtract 5 feet (1.5m) of equivalent length for each 90° elbow. Subtract 2.5 feet (0.7m) of equivalent length for each 45° elbow.

20

Image 20
Contents Domestic Water Heaters Hydronic Heating Boilers and Domestic Water Heaters General Product Information UnpackingSafety Information Installation Installation Clearances from Combustible ConstructionOutdoor Boiler Installation LocationFreeze Protection Pump OperationShut-Down and Draining Freeze Protection for a Heating Boiler System if requiredCombustion and Ventilation AIR Combustion Air FilterCombustion Air Options Outside Combustion Air, No DuctsCombustion Air from Interior Space Venting Exhaust FansGeneral Information Vertical Vent Termination Clearances and LocationSidewall Vent Termination Clearances and Location ChimneySidewall Air Inlet Combustion Air Inlet PipingLength of Air Inlet Pipe Vertical Rooftop Air Inlet ClearancesBarometric Damper Location Vent System OptionsCombined Air Inlet Points Flue Outlet Piping Conventional Negative Draft VentingNegative Draft Vertical DirectAire Venting Vertical Vent Termination Clearances and LocationInstallation Vent Kits Venting of Flue ProductsSidewall Venting Sidewall FanSidewall Venting Termination Sidewall Venting Without FanVenting Guidelines Masonry Chimney Installation Horizontal DirectAire VentingVent Kits Direct VentingVertical DV Venting Termination Connecting the Air Inlet Pipe to the Unit Horizontal DV Venting TerminationFlue Pipe Materials Combustion Air Inlet PipingAir Inlet Piping Materials Sealing PVC, CPVC, ABS, Dryer Vent, and Flex Duct Vent PipeOutdoor Installation Venting MaximumOutdoor Vent/Air Inlet Location Outdoor Vent Cap KitConnecting to GAS Supply Connecting Gas Piping to UnitGas Piping Gas Pressure TestGas Train and Controls TABLE-JBtu/hr Distance From Meter in feet Input 51-100 101-200 201-300 301-500Venting of Combination Gas Valves Combination Gas ValvesChecking Gas Supply Pressure Table L Gas Manifold Pressure AdjustmentMultiple Unit Installations Gas Supply Pipe Sizing Connecting to Water Supply Low Water Cutoff Water Flow SwitchRelief Valve Circulator Pump Requirements General Plumbing RulesWater Connections Heating Boilers Only Heat Exchanger Pressure Drop Chart Circulator Pump SpecificationsPump Installation and Maintenance Primary/Secondary Boiler PipingInput LTV Valve Kit Btu/hr Low Temperature Return Water SystemsTable O LTV Valve Kits Radiant Floor and Snow Melt Heating Systems 10ºF 20ºF 30ºF 40ºFTemperature/Pressure Gauge Boiler Flow RatePlacing the Boiler in Operation Boiler Bypass RequirementsInstallation with a Chilled Water System Boiler Operating Temperature ControlWater Treatment Terminal Strip Connection OptionsFor Your Safety Read Before Operating Remote ON/OFF Boiler or Water HeaterOperation Power Up Quick Programming OverviewTo Turn Off Gas To Appliance Standard Btu/hr ModelsAdjust Menu Setting Descriptions Adjust Menu Settings for Operating ModesTABLE-Q TABLE-RProgramming Buttons Ignition Systems and StagesOperating Modes Placement of Sensors Access LevelsTemperature Control Staging Logic Graphic SymbolsProgramming For Mode 1, Boiler Operation Programming For Mode 2, Water Heating Operation Programming For Mode 3, Sequenced OperationRemote Mounting of Sensors TABLE-SError and Warning Messages HOT Surface Ignition SystemHot Surface Igniter and Ignition Control Module Hot Surface Ignition Control ModuleDiagnostic Status Indication Access to Internal Control PanelIgnition Control Diagnostic Codes Removing the Control PanelOperation and Diagnostic Lights Status LED Diagnostic CodesIgnition and Control Timings Hot Surface Ignition Module Timings NominalRequired Temperature Rise Temperature Rise ChartWater Velocity Control Water ChemistryPipe Size Requirements Circulating PumpTABLE-X 399,999 750,000 Btu/hr ModelsPotable Hot Water Temperature Control Settings Minimum Pump PerformanceHeat Exchanger TABLE-YHigh Water Temperature Limit Control Optional Relief ValveThermal Expansion Location of Cold Water Supply Piping ConnectionsFlue Gas Passageways Cleaning Procedures Burner Removal and CleaningAppliance Area Water Circulating PumpCombustion and Ventilation Air Heat Exchanger CleaningElectrical Adjustment Procedure Adjusting Differential Air PressureSet Up Procedure Servicing Hot Surface Igniter and Ignition Module Ignition System CheckoutSequence of Operation Ignition Troubleshooting Guide 990,000 2,070,000 Btu/hr Models Domestic Water Heaters Hydronic Heating Boilers Ladder Diagram 399,999 750,000 BTU/HR Models Hydronic Heating Boilers and Domestic Water Heaters Installation Ladder Diagram 990,000 2,070,000 BTU/HR Models Models Wiring Diagram Hydronic Heating Boilers and Domestic Water Heaters BTU/HR Models
Related manuals
Manual 76 pages 58.86 Kb

399, CF-CH(E)-i&s-08, 999 - 750 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.