Lochinvar CF-CH(E)-i&s-08, 999 - 750, 399 Adjusting Differential Air Pressure, Set Up Procedure

Page 58

Hydronic Heating Boilers and Domestic Water Heaters

CLEANING AND MAINTENANCE Continued

Adjusting Differential Air Pressure

The following is a recommended method for setting the differential air pressure (ΔP) for each fan.

LESS

AIR

 

MORE

AIR

 

AIR SHUTTER

FIG. 56 Adjusting Air Shutter 399,999 - 750,000 Btu/hr Models

FIG. 57 Loosening Fan Transition Box Screws

FIG. 58 Adjusting Air Shutter 990,000 - 2,070,000 Btu/hr Models

Set Up Procedure

Beside each fan duct is an air pressure switch with a large and a small tube delivering pressure from points inside the unit (see FIG. 59). The pressure in the large tube is the chamber pressure. The pressure in the small tube is the burner pressure. They act together to make the pressure switch. By disconnecting the caps from the tees in the pressure switch hoses and connecting them to either side of a manometer, you can read the differential pressure to the switch.

The “ (+)” connection on the manometer connects to the tee in the tubing from the units front chamber and the “ (-) ” connection on the manometer connects to the tee in the small tubing from the burner.

If the air pressure switch does not make within 60 seconds from the time the fans turn ON, the ignition module will go into a soft lockout period (approximately five minutes in duration) during which time the fans are turned OFF and the module shows the Low Air flash code. If necessary, soft lockout can be circumvented by cycling power to the ON/OFF switch to cycle power to the unit.

Note: If the unit has been firing recently, allow the unit to cool for five minutes with the fans running before beginning the adjustment procedure.

Retain the plastic caps removed from the tees for reinstallation when complete.

Adjustment Procedure

1.Remove the upper front jacket panels from the unit to access the upper chamber.

2.Slightly loosen screws that attach fan transition box to metal base (see FIG. 57).

3.Depending on model, the air shutter(s) may be located either on the side or the rear of the fan duct. Locate the air shutter at the side/rear of the fan duct (see FIG. 56 and 58). Move the air shutter towards the rear or left side of the unit to increase air pressure. Move the air shutter towards the front or right side of the unit to decrease air pressure.

4a. On the 990,000 - 2,070,000 Btu/hr models adjust the air shutter on the left fan until the differential pressure is nominally 1.1 - 1.3 inches water column. Note: The air chamber pressure is 1.2 inches water column for liquefied petroleum (L.P.) and 1.4 inches water column for natural.

4b. The 399,999 - 750,000 Btu/hr models have one fan with a side mounted air shutter. The differential for these models is nominally 1.5 - 1.65 inches water column.

5.Reattach the hoses to the pressure switch and locate the air switch adjacent to the right fan and connect the tubes to either side of your manometer.

58

Image 58
Contents Domestic Water Heaters Hydronic Heating Boilers and Domestic Water Heaters General Product Information UnpackingSafety Information Installation Installation Clearances from Combustible ConstructionFreeze Protection Outdoor Boiler InstallationLocation Pump OperationCombustion and Ventilation AIR Shut-Down and DrainingFreeze Protection for a Heating Boiler System if required Combustion Air FilterCombustion Air Options Outside Combustion Air, No DuctsCombustion Air from Interior Space General Information VentingExhaust Fans Vertical Vent Termination Clearances and LocationSidewall Vent Termination Clearances and Location ChimneyLength of Air Inlet Pipe Combustion Air Inlet PipingSidewall Air Inlet Vertical Rooftop Air Inlet ClearancesCombined Air Inlet Points Vent System OptionsBarometric Damper Location Negative Draft Conventional Negative Draft VentingFlue Outlet Piping Vertical DirectAire Venting Vertical Vent Termination Clearances and LocationInstallation Vent Kits Venting of Flue ProductsSidewall Venting Termination Sidewall VentingSidewall Fan Sidewall Venting Without FanVenting Guidelines Masonry Chimney Installation Horizontal DirectAire VentingVent Kits Direct VentingVertical DV Venting Termination Flue Pipe Materials Connecting the Air Inlet Pipe to the UnitHorizontal DV Venting Termination Combustion Air Inlet PipingAir Inlet Piping Materials Sealing PVC, CPVC, ABS, Dryer Vent, and Flex Duct Vent PipeOutdoor Installation Venting MaximumOutdoor Vent/Air Inlet Location Outdoor Vent Cap KitGas Piping Connecting to GAS SupplyConnecting Gas Piping to Unit Gas Pressure TestBtu/hr Distance From Meter in feet Gas Train and ControlsTABLE-J Input 51-100 101-200 201-300 301-500Checking Gas Supply Pressure Combination Gas ValvesVenting of Combination Gas Valves Multiple Unit Installations Gas Supply Pipe Sizing Gas Manifold Pressure AdjustmentTable L Connecting to Water Supply Relief Valve Water Flow SwitchLow Water Cutoff Water Connections Heating Boilers Only General Plumbing RulesCirculator Pump Requirements Pump Installation and Maintenance Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Primary/Secondary Boiler PipingTable O LTV Valve Kits Low Temperature Return Water SystemsInput LTV Valve Kit Btu/hr Radiant Floor and Snow Melt Heating Systems 10ºF 20ºF 30ºF 40ºFPlacing the Boiler in Operation Temperature/Pressure GaugeBoiler Flow Rate Boiler Bypass RequirementsInstallation with a Chilled Water System Boiler Operating Temperature ControlWater Treatment Terminal Strip Connection OptionsFor Your Safety Read Before Operating Remote ON/OFF Boiler or Water HeaterOperation To Turn Off Gas To Appliance Power UpQuick Programming Overview Standard Btu/hr ModelsTABLE-Q Adjust Menu Setting DescriptionsAdjust Menu Settings for Operating Modes TABLE-ROperating Modes Ignition Systems and StagesProgramming Buttons Temperature Control Access LevelsPlacement of Sensors Programming For Mode 1, Boiler Operation Graphic SymbolsStaging Logic Remote Mounting of Sensors Programming For Mode 2, Water Heating OperationProgramming For Mode 3, Sequenced Operation TABLE-SHot Surface Igniter and Ignition Control Module Error and Warning MessagesHOT Surface Ignition System Hot Surface Ignition Control ModuleIgnition Control Diagnostic Codes Diagnostic Status IndicationAccess to Internal Control Panel Removing the Control PanelIgnition and Control Timings Operation and Diagnostic LightsStatus LED Diagnostic Codes Hot Surface Ignition Module Timings NominalWater Velocity Control Required Temperature RiseTemperature Rise Chart Water ChemistryTABLE-X Pipe Size RequirementsCirculating Pump 399,999 750,000 Btu/hr ModelsHeat Exchanger Potable Hot Water Temperature Control SettingsMinimum Pump Performance TABLE-YThermal Expansion High Water Temperature Limit ControlOptional Relief Valve Location of Cold Water Supply Piping ConnectionsAppliance Area Flue Gas Passageways Cleaning ProceduresBurner Removal and Cleaning Water Circulating PumpElectrical Heat Exchanger CleaningCombustion and Ventilation Air Set Up Procedure Adjusting Differential Air PressureAdjustment Procedure Servicing Hot Surface Igniter and Ignition Module Ignition System CheckoutSequence of Operation Ignition Troubleshooting Guide 990,000 2,070,000 Btu/hr Models Domestic Water Heaters Hydronic Heating Boilers Ladder Diagram 399,999 750,000 BTU/HR Models Hydronic Heating Boilers and Domestic Water Heaters Installation Ladder Diagram 990,000 2,070,000 BTU/HR Models Models Wiring Diagram Hydronic Heating Boilers and Domestic Water Heaters BTU/HR Models
Related manuals
Manual 76 pages 58.86 Kb

399, CF-CH(E)-i&s-08, 999 - 750 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.