Lochinvar 399, 999 - 750 Staging Logic, Graphic Symbols, Programming For Mode 1, Boiler Operation

Page 47

Installation and Service Manual

System Sensor: This is used for boiler applications. This sensor will control the water temperature within the building loop.

Staging Logic

There are two different types of staging logic used in the temperature control; Proportional (step) Staging Logic and PID Staging Logic. The staging logic used depends upon what mode the control is running under.

Proportional (Step) Staging Logic

The proportional method of staging is based on manually adjusted settings which determine when the next stage is required to fire. This method is used on Mode 1 for set point operation (with no outdoor sensor) and Mode 2 for water heating. The adjustable settings are:

Set Point TARGET 1, 2, 3, or 4: Staging set point target for each stage. Typically, users set the four different stages a few degrees apart to allow segments of the heater to come on as the temperature drops.

DIFF 1, 2, 3, or 4: Staging differential for each stage.

STG DLY: Interstage delay to turn on between stage 1 and 2 and between stage 3 and 4.

How It Works

A stage will turn on once the temperature drops to its Set point TARGET minus DIFF. The stage will turn off once the temperature rises to its Set point TARGET.

EXAMPLE:

Using stage one of the control as an example, the corresponding load would be energized and de-energized at the following temperatures based on the programmed settings.

Settings

Set Point: 160°F (71°C)

Differential: 8°F (5°C)

Output Energized

Stage One: Energized at 152°F (67°C)

Output De-energized

Stage One: De-energized at 160°F (71°C)

There is a time delay (STG DLY) that applies in the staging on sequence between stage 1 and 2 and between stage 3 and 4. For example, in order for stage 2 to turn on, the temperature must drop to Set point TARGET 2 minus DIFF 2, and the STG DLY must elapse. The STG DLY begins once stage 1 turns on. This operation applies between stage 3 and 4 as well.

Stage 1 and 2 are independent of stage 3 and 4. Stage 2 cannot fire before stage 1 and stage 4 cannot fire before stage 3.

PID Staging Logic

(Outdoor Air Mode 1 Only)

This method is used on Mode 1 for outdoor reset with reset override operation (using the outside air temperature sensor). The PID method of staging allows the control to decide the most effective way to operate the stages to maintain an accurate temperature and minimize short cycling.

The control continuously monitors the actual supply temperature and compares it to the target temperature. The amount of error (proportional), the time the error has been present (integral), and the rate of change (derivative), determine if an additional stage is required to turn on or off.

The control automatically calculates the inter-stage differential as well as the delays between stages turning on or off.

OUTDR START, OUTDR DSGN, BOIL START and BOIL DSGN need to be field set based on installation design criteria to establish the reset curve. Verify that the WWSD is set to the desired value. Adjust BOIL MAX and BOIL MIN to appropriate values for the application.

Note: BOIL MIN should not be less than a setting which will ensure the return water temperature to the unit being 140°F minimum.

BOIL MASS should only need adjustment if changes in the interstage delay are necessary.

Graphic Symbols

The screen will display two graphic symbols. One is a circle with a triangle inside and the other is a graphic representation of a blower (see FIG. 50). The circle with a triangle inside represents the pump. When this symbol is present, the pump is operating. When the blower symbol is present, the controller is calling for heat.

FIG. 50 Graphic Symbols

Programming For Mode 1, Boiler Operation

Mode 1 is for boiler operation. Under Mode 1, there are two sublevels of operation.

1.Operate off of set point.

2.Operate off of outdoor air reset curve.

47

Image 47
Contents Domestic Water Heaters Hydronic Heating Boilers and Domestic Water Heaters Unpacking General Product InformationSafety Information Installation Clearances from Combustible Construction InstallationPump Operation Outdoor Boiler InstallationLocation Freeze ProtectionCombustion Air Filter Shut-Down and DrainingFreeze Protection for a Heating Boiler System if required Combustion and Ventilation AIROutside Combustion Air, No Ducts Combustion Air OptionsCombustion Air from Interior Space Vertical Vent Termination Clearances and Location VentingExhaust Fans General InformationChimney Sidewall Vent Termination Clearances and LocationSidewall Air Inlet Combustion Air Inlet PipingLength of Air Inlet Pipe Clearances Vertical Rooftop Air InletBarometric Damper Location Vent System OptionsCombined Air Inlet Points Flue Outlet Piping Conventional Negative Draft VentingNegative Draft Vertical Vent Termination Clearances and Location Vertical DirectAire VentingVenting of Flue Products Installation Vent KitsSidewall Venting Without Fan Sidewall VentingSidewall Fan Sidewall Venting TerminationVenting Guidelines Horizontal DirectAire Venting Masonry Chimney InstallationDirect Venting Vent KitsVertical DV Venting Termination Combustion Air Inlet Piping Connecting the Air Inlet Pipe to the UnitHorizontal DV Venting Termination Flue Pipe MaterialsSealing PVC, CPVC, ABS, Dryer Vent, and Flex Duct Vent Pipe Air Inlet Piping MaterialsMaximum Outdoor Installation VentingOutdoor Vent Cap Kit Outdoor Vent/Air Inlet LocationGas Pressure Test Connecting to GAS SupplyConnecting Gas Piping to Unit Gas PipingInput 51-100 101-200 201-300 301-500 Gas Train and ControlsTABLE-J Btu/hr Distance From Meter in feetVenting of Combination Gas Valves Combination Gas ValvesChecking Gas Supply Pressure Table L Gas Manifold Pressure AdjustmentMultiple Unit Installations Gas Supply Pipe Sizing Connecting to Water Supply Low Water Cutoff Water Flow SwitchRelief Valve Circulator Pump Requirements General Plumbing RulesWater Connections Heating Boilers Only Primary/Secondary Boiler Piping Heat Exchanger Pressure Drop ChartCirculator Pump Specifications Pump Installation and MaintenanceInput LTV Valve Kit Btu/hr Low Temperature Return Water SystemsTable O LTV Valve Kits 10ºF 20ºF 30ºF 40ºF Radiant Floor and Snow Melt Heating SystemsBoiler Bypass Requirements Temperature/Pressure GaugeBoiler Flow Rate Placing the Boiler in OperationBoiler Operating Temperature Control Installation with a Chilled Water SystemTerminal Strip Connection Options Water TreatmentRemote ON/OFF Boiler or Water Heater For Your Safety Read Before OperatingOperation Standard Btu/hr Models Power UpQuick Programming Overview To Turn Off Gas To ApplianceTABLE-R Adjust Menu Setting DescriptionsAdjust Menu Settings for Operating Modes TABLE-QProgramming Buttons Ignition Systems and StagesOperating Modes Placement of Sensors Access LevelsTemperature Control Staging Logic Graphic SymbolsProgramming For Mode 1, Boiler Operation TABLE-S Programming For Mode 2, Water Heating OperationProgramming For Mode 3, Sequenced Operation Remote Mounting of SensorsHot Surface Ignition Control Module Error and Warning MessagesHOT Surface Ignition System Hot Surface Igniter and Ignition Control ModuleRemoving the Control Panel Diagnostic Status IndicationAccess to Internal Control Panel Ignition Control Diagnostic CodesHot Surface Ignition Module Timings Nominal Operation and Diagnostic LightsStatus LED Diagnostic Codes Ignition and Control TimingsWater Chemistry Required Temperature RiseTemperature Rise Chart Water Velocity Control399,999 750,000 Btu/hr Models Pipe Size RequirementsCirculating Pump TABLE-XTABLE-Y Potable Hot Water Temperature Control SettingsMinimum Pump Performance Heat ExchangerLocation of Cold Water Supply Piping Connections High Water Temperature Limit ControlOptional Relief Valve Thermal ExpansionWater Circulating Pump Flue Gas Passageways Cleaning ProceduresBurner Removal and Cleaning Appliance AreaCombustion and Ventilation Air Heat Exchanger CleaningElectrical Adjustment Procedure Adjusting Differential Air PressureSet Up Procedure Ignition System Checkout Servicing Hot Surface Igniter and Ignition ModuleSequence of Operation Ignition Troubleshooting Guide 990,000 2,070,000 Btu/hr Models Domestic Water Heaters Hydronic Heating Boilers Ladder Diagram 399,999 750,000 BTU/HR Models Hydronic Heating Boilers and Domestic Water Heaters Installation Ladder Diagram 990,000 2,070,000 BTU/HR Models Models Wiring Diagram Hydronic Heating Boilers and Domestic Water Heaters BTU/HR Models
Related manuals
Manual 76 pages 58.86 Kb

399, CF-CH(E)-i&s-08, 999 - 750 specifications

Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 is a cutting-edge boiler designed for commercial heating applications. With its robust construction and high efficiency, this model stands out in the crowded market of heating solutions.

One of the main features of the Lochinvar 999 - 750 is its exceptional thermal efficiency rating. The unit incorporates advanced condensing technology that allows it to recover heat from flue gases, which helps in achieving efficiency levels of up to 99%. This efficiency not only reduces energy consumption but also lowers operational costs, making it an excellent investment for businesses looking to minimize their carbon footprint.

The boiler is designed to provide a powerful output of 750 kW, ensuring it meets the heating demands of larger buildings or commercial spaces. Its capacity makes it suitable for a range of applications including schools, hospitals, and industrial facilities. Moreover, the unit features a built-in cascading system that enables multiple boilers to be connected, enhancing system reliability and flexibility.

In terms of technology, the Lochinvar 999 - 750 is equipped with a user-friendly touchscreen interface. This innovative control system allows operators to monitor and adjust settings with ease, providing real-time performance data and alerts for maintenance needs. The intelligent controls optimize operation to match the heating load, further enhancing energy efficiency.

Safety is a top priority with this model. It is built with multiple safety features such as automatic shut-off valves, pressure relief valves, and flame monitoring systems, ensuring safe operation under various conditions. The unit also adheres to stringent industry standards and regulations, making it a reliable choice for commercial applications.

Furthermore, the Lochinvar 999 - 750 is designed with serviceability in mind. Its compact footprint and accessible components simplify maintenance, reducing downtime and associated costs. The unit also supports a variety of fuel sources, including natural gas, propane, and biodiesel, providing flexibility to meet different facility requirements.

In summary, the Lochinvar 999 - 750, CF-CH(E)-i&s-08,399 represents a blend of efficiency, reliability, and safety in commercial heating. Its advanced technologies and thoughtful design make it a powerful solution for various heating needs, making it an ideal choice for businesses aiming for excellence in energy management and operational efficiency.