GE AEH24, AEV24, AEQ24, AEW24 Through-the-Wall Installation Instructions-Optional, IMPORTANT cont

Page 15
Through-the-Wall Installation Instructions—Optional

Through-the-Wall Installation Instructions—Optional

The case may be installed through-the-wall in both existing and new construction.

Read completely, then follow step-by-step.

NOTE: Except for the V-support assemblies (included), obtain all materials locally for mounting the air conditioner through-the-wall.

1IMPORTANT

Through-the-wall installation is not appropriate if any of the side or top louvers in the case will be obstructed by the wall.

All side and top louvers in the case must project on the outdoor side of the wall.

The room side of the case must project into the room far enough to maximize the balance of the unit.

The case must be installed level from side- to-side and with a slight tilt from front to rear. Use a level; no more than a 1/2 bubble will be the correct case slant to the outside.

Lintel angle is required to support bricks or blocks above opening.

Flashing is required and should extend the length of the opening to ensure no inside cavity leakage occurs.

ARemove the air conditioner from the case. For specific instruction, refer to the Window Installation Instructions.

BMake certain that a wall receptacle is available close to the hole location or make arrangements to install a receptacle.

CPlace the case in the wall opening and place wood support strips between the case bottom and the flashing on both sides of the bottom rail. They should be the same height as the bottom rail and the same length as the wall opening.

1IMPORTANT (cont.)

DSecure with 14 wood screws anchored at least an inch into the wall support structure.

NOTE: Drill pilot holes, if necessary, for proper installation. If the frame is oversized, use shims to prevent case distortion.

EInstall the V-supports. See the INSTALL THE CASE IN THE WINDOW section in the Window Installation Instructions.

2FINISH THE WALL OPENING

ACaulk all four sides on the outdoor side of the case to prevent moisture from getting through to the interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down the outside of the building.

 

Plaster line

Lintel angle

 

Caulking

Trim molding

 

(if desired)

OUTSIDE

INSIDE

 

Air louvers

 

(top and

Bottom rail

sides must

 

project on the

 

outdoor side

 

of the wall)

 

Wood filler and caulking (above and below the flashing)

V-supports

Case Bottom

Flashingbottom rail (Drip rail)

Flashing (Drip rail)

Wood support strips

BPlace the air conditioner into the case.

For specific instruction, refer to the Window Installation Instructions.

15

Image 15
Contents Troubleshooting Tips Consumer Support Safety Instructions . . . . . . . .2 Operating InstructionsCare and Cleaning Installation InstructionsSafety Instructions IMPORTANT SAFETY INFORMATION READ ALL INSTRUCTIONS BEFORE USINGSAFETY PRECAUTIONS HOW TO CONNECT ELECTRICITYREAD AND FOLLOW THIS SAFETY INFORMATION CAREFULLY EXTENSION CORDSSAVE THESE INSTRUCTIONS DO NOT use an extension cord with any of the 230/208 volt modelsDelay Timer Increase + /Decrease Pads Instructions SafetyTroubleshooting Tips Installation Instructions Power PadPower Outage Recovery Feature Safety InstructionsTroubleshooting Tips Installation InstructionsAbout the controls on the air conditioner-models with control knobs Operating Instructions SafetyFeatures and appearance will vary TEMPERATURE CONTROLNormal operating sounds Safety Instructions Operating Instructions Installation InstructionsTroubleshooting Tips Consumer Support Additional controlsOutdoor Coils Care and cleaning of the air conditionerHow to Insert the Batteries in the Remote Control Grille and CaseBEFORE YOU BEGIN Installation InstructionsAir Conditioner IMPORTANT - Save theseWindow Installation Instructions PARTS INCLUDEDAppearance may vary 4 PREPARE THE WINDOW 1 WINDOW REQUIREMENTS2 STORM WINDOW REQUIREMENTS 3 REMOVE THE AIR CONDITIONER FROM THE CASE5 PREPARE THE CASE 6 INSTALL THE CASE IN THE WINDOW7 INSTALL SUPPORT BRACKETS AND THE FOAM TOP WINDOW GASKET 6 INSTALL THE CASE IN THE WINDOW cont8 INSTALL THE AIR CONDITIONER IN THE CASE cont 8 INSTALL THE AIR CONDITIONER IN THE CASEThrough-the-Wall Installation Instructions-Optional 1 IMPORTANT cont2 FINISH THE WALL OPENING What To Do Troubleshooting TipsProblem Possible CausesGeneral Electric Company GE Service Protection PlusWarranty Registration Department P.O. Box Louisville, KY We’ll Cover Any Appliance. Anywhere. AnytimeConsumer Product Ownership Registration Follow these three steps to protect your new appliance investmentModel Number Serial NumberWhat Is Not Covered GE Air Conditioner WarrantyTroubleshooting Tips Consumer Support Safety Instructions OperatingGE Appliances Website Schedule ServiceParts and Accessories Consumer SupportInstrucciones de instalación Solucionar problemas Apoyo al consumidorInstrucciones de seguridad . . . . .2 Instrucciones de operación Cuidado y limpiezaOperación Instalación Apoyo al consumidor Solucionar problemas Seguridad¡ADVERTENCIA GUARDE ESTAS INSTRUCCIONES Solucionar problemas Apoyo al consumidorCABLES DE EXTENSIÓN PRECAUCIÓNApoyo al Instalación consumidor Solucionar problemasSeguridad OperaciónApoyo al Solucionar problemasInstalación consumidorSeguridad Instalación Apoyo al consumidor Solucionar problemasControles CONTROL DE MODOPuerta del panel de control Controles adicionalesSonidos de operación normales Control de la ventilaciónBobinas para exteriores Cuidado y limpieza del acondicionador de airePRECAUCIÓN NO OPERE el Rejilla y cajaREQUISITOS ELÉCTRICOS Instrucciones de instalaciónPRECAUCIÓN ANTES DE INICIARapariencia puede variar Instrucciones de instalación en una ventanaHERRAMIENTAS QUE NECESITARÁ PARTES INCLUIDAS3 RETIRE EL ACONDICIONADOR DE AIRE DE LA CAJA 1 REQUISITOS PARA LA VENTANA2 REQUISITOS DE UNA VENTANA DE TORMENTAS 4 PREPARE LA VENTANA5 PREPARE LA CAJA 6 INSTALE LA CAJA EN LA VENTANAPARTE 6 INSTALE LA CAJA EN LA VENTANA cont 7 INSTALE SOPORTES DECIERRE Y LA JUNTA DE ESPUMA SUPERIOR DE LA VENTANA 8 INSTALE EL ACONDICIONADOR DE AIRE EN LA CAJA cont 8 INSTALE EL ACONDICIONADOR DE AIRE EN LA CAJAInstrucciones de instalación a través de la pared-opcional 1 IMPORTANTE1 IMPORTANTE cont TERMINE LA ABERTURA EN LA PARED Seguridad Operación Instalación Solucionar problemasSolucionar problemas Apoyo al consumidor ProblemaRetardo 1-24h no está Apoyo al consumidor Solucionar problemasSe acumula agua en la bandejade Reparación de Fábrica o nuestros técnicos Customer Care Garantía de su acondicionador de aire de GEGE reemplazará Lo que no está cubiertoGarantías ampliadas Apoyo al consumidorPágina Web de GE Appliances Solicite una reparación