Stovax PR0741 manual Logic E-BOX arrangEMENT of fuel bed components

Page 20

INSTALLATION INSTRUCTIONS

INSTALLATION

9.LOGIC E-BOX arrangEMENT OF fuel bed components

ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS

The fuel effect and side panels in this fire are made from Refractory Ceramic Fibre (RCF), a material which is commonly used for this application.

Preventive clothing is not required when handling these articles, but we recommend you follow normal hygiene rules of not smoking, eating or drinking in the work area, and always wash your hands before eating or drinking.

To ensure that the release of RCF fibres is kept to a minimum during installation and servicing, a HEPA filtered vacuum is recommended to remove any dust accumulated in and around the fire before and after working on it. When servicing the fire it is recommended that the replaced items are not broken up, but are sealed within heavy duty polythene bags and labelled as RCF waste.

RCF waste is classed as stable, nonreactive hazardous waste, and may be disposed of at a licensed landfill site.

Excessive exposure to these materials may cause temporary irritation to eyes, skin and respiratory tract; wash hands thoroughly after handling the material.

NOTE:CERAMICPARTSAREFRAGILE.THESIDEANDREARPANELS ARE REVERSIBLE. ONE SIDE IS PLAIN, THE OTHER SIDE IS REEDED

ONLY USE THE CORRECT TYPE AND QUANTITY OF CERAMIC COMPONENTS. Always follow the fuel bed layout as stated in these instructions. NEVER change the layout from that shown here.

9.1Position the burner cover gasket on the burner skin ensuring the holes align with the ports. Take care as the front left-hand hole is offset compared to the others, Diagram 19, arrow A.

19

A

AR1372

9.2Place the rear panel against the rear of the box resting on the shelf. Then slide one of the side panels into the box

ensuring it touches the rear panel. Then gently ease the front edge of the side panel behind the flange so it lies flat against the wall of the box. Repeat with the second side panel., Diagram 20.

20

AR1359

 

AR1360

 

 

 

9.3Locate the top panel on top of the sides and rear by lifting it up and forward inside the box. Then sliding it backwards and down behind the side panels and resting on the rear panel, Diagram 21.

21

AR1361

Coal Layout

9.4Position the flame baffle centrally on the tray and ensure the stepped lower edge engages against the rear edge of the burner skin, Diagram 22.

22

AR1362

9.5Place the front coal centrally in the channel at the front of the tray. See diagram 7. The relationship between the front coal and the flame baffle is shown in diagram 23.

20

Image 20
Contents Studio& Logic E-box Contents APPLIANCE COMMISSIONING CHECKLIST FLUE CHECKPass Fail GAS CHECKUser Instructions GeneralLighting the Fire Turning the Fire OFFStudio Arrangement of Fuel BED Components Cleaning the E-studioCleaning the logic-e box AR1769 ArrangEMENT of fuel bed Components ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICSLogic E-BOX Large Medium Small Pebble Layout Installation details Oxygen depletion sensorFlame failure device RunningInstallation Instructions Technical SpecificationStudiomodels 8691CFCHUC P8691CFCHUCFinish Arts Frame Holyrood SpanishOverall External Dimensions Plan View Fire Location Site RequirementsFlue and Chimney Requirements AIR Vents Must not be Restricted GAS SupplyVentilation Installation Control UpgradeSafety Precautions Installation of the GAS SupplyInstallation of the Fire Cable Retention MethodFitting the Decorative Inner panel Screw Fixing MethodAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Commissioning Installation / CommissioningLighting the fire Servicing Requirements Servicing InstructionsServicing Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Replacing Parts GeneralIgnition Lead PiezoOds pilot unit Pilot injector Ignition electrode ThermocoupleMain injector Gas valveMag unit Changing between gas types Spare parts list-E-STUDIOSpare parts list Logic E-BOX Service Records