Stovax PR0741 manual Gas valve, Mag unit, Main injector

Page 30

SERVICING INSTRUCTIONS

REPLACING PARTS

4.8Replace with a new pilot assembly and check the spark gap, Diagram 10.

10

AR0097

4.9After reassembly, check for gas soundness and carry out a flame failure functional check as detailed in the flow chart, especially the mag drop out time.

5.gas valve

5.1Disconnect the 2x8mm and 1x4mm gas pipe fittings at the back of the gas valve and also disconnect the thermocouple, Diagram 11 arrows B and E.

11

B

E

AR1371

5.2Disconnect the injector nut, Diagram 12 arrow D.

12

D

AR1371

5.3Undo the two bolts securing the gas valve to the fire and remove the valve.

5.4Replace in reverse order.

5.5Check all joints for gas leaks, check operation of the thermocouple and ignition lead.

6.mag unit

6.1Remove the fire, refer to section 1.

6.2Undo the thermocouple nut. Diagram 13 arrow B.

13

B

AR1371

6.3Undo the mag unit retaining nut at the back of the control valve behind the thermocouple nut.

6.4After removing the retaining nut, the mag unit can be tapped out and a replacement fitted.

6.5Replace the mag unit retaining nut and tighten. Note - this is a gas-tight seal.

6.6Replace the thermocouple and check for gas leaks.

6.7After reassembly, carry out the flame failure functional check as detailed in the flow chart, especially the mag unit drop out time.

7.main injector

7.1Undo the injector compression nut and valve nut , Diagram 14 arrows D and E, pull the pipe clear of the injector body.

14

D

E

AR1371

 

30

Image 30
Contents Studio& Logic E-box Contents Pass Fail APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK GAS CHECKLighting the Fire User InstructionsGeneral Turning the Fire OFFCleaning the E-studio Cleaning the logic-e boxStudio Arrangement of Fuel BED Components AR1769 ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS Logic E-BOXArrangEMENT of fuel bed Components Large Medium Small Pebble Layout Flame failure device Installation detailsOxygen depletion sensor RunningStudiomodels 8691CFCHUC Installation InstructionsTechnical Specification P8691CFCHUCFinish Arts Frame Holyrood SpanishOverall External Dimensions Plan View Site Requirements Flue and Chimney RequirementsFire Location GAS Supply VentilationAIR Vents Must not be Restricted Safety Precautions InstallationControl Upgrade Installation of the GAS SupplyInstallation of the Fire Cable Retention MethodFitting the Decorative Inner panel Screw Fixing MethodAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Installation / Commissioning Lighting the fireCommissioning Servicing Instructions ServicingServicing Requirements Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Ignition Lead Replacing PartsGeneral PiezoOds pilot unit Pilot injector Ignition electrode ThermocoupleGas valve Mag unitMain injector Spare parts list-E-STUDIO Spare parts list Logic E-BOXChanging between gas types Service Records