Stovax PR0741 manual Installation / Commissioning, Lighting the fire

Page 23

INSTALLATION INSTRUCTIONS

INSTALLATION / COMMISSIONING

10.lighting the fire

10.1Locate the control valve on the fire. There are two

control knobs on the valve, the right-hand knob controls the pilot ignition and the left hand knob controls the main burner.

10.2If your fire has already been upgraded to battery remote control, please refer to the instructions provided with the upgrade to operate the remote control. The

following instructions will work for either situation.

1

AR0914

10.3Ensure that the left-hand control knob is pointing to off ().

10.4Ensure that the right-hand control knob is pointing to off ().

10.5Press in the right-hand control knob and rotate it anti- clockwise until a click is heard (keep pressing in) and the

knob is pointing to pilot ( ). The pilot should now light.

If the pilot has not lit, repeat the procedure until it does.

10.6Keep the control knob pressed for 10 seconds and then release it, the pilot should stay alight. If the pilot goes out, repeat the procedures until it does.

10.7If the pilot will not light after repeated attempts, contact the retailer or installer from whom the fire was purchased.

10.8Turn the right-hand control to point to main burner (). The fire can now be controlled using the left hand control knob.

10.9Turn the left hand control knob to point to low fire (), the main burner will light on low. The burner can

now be controlled between low and high settings. Turn the control

knob anti clockwise increase the flame height and clockwise to decrease the flame height.

THE YELLOW FLAMES WILL APPEAR WHEN THE FIRE HAS GAINED SUFFICIENT HEAT - TYPICALLY 10 TO 20 MINUTES.

If the pilot flame is extinguished, intentionally or unintentionally, do not relight the appliance for at least 3 minutes.

1.COMMISSIONING

1.1Close all windows and doors to the room, check all controls, and allow fire to burn on maximum for 5 minutes. Test for spillage of flue products using a smoke match. Pass the lighted smoke match along the top front of the draught diverter, just inside. See diagram 1.

1

AR1378

1.2If the fire spills, run for a further 10 minutes and re-check.

1.3If there are extractor fans in the room or adjacent rooms, the spillage test must be repeated with the extractors running on maximum.

IF SPILLAGE PERSISTS, DISCONNECT THE FIRE AND SEEK EXPERT ADVICE.

For future reference record the installation details on the commissioning sheet on page 3 of these instructions.

23

Image 23
Contents Studio& Logic E-box Contents GAS CHECK APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK Pass FailTurning the Fire OFF User InstructionsGeneral Lighting the FireStudio Arrangement of Fuel BED Components Cleaning the E-studioCleaning the logic-e box AR1769 ArrangEMENT of fuel bed Components ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICSLogic E-BOX Large Medium Small Pebble Layout Running Installation detailsOxygen depletion sensor Flame failure deviceP8691CFCHUC Installation InstructionsTechnical Specification Studiomodels 8691CFCHUCHolyrood Spanish Finish Arts FrameOverall External Dimensions Plan View Fire Location Site RequirementsFlue and Chimney Requirements AIR Vents Must not be Restricted GAS SupplyVentilation Installation of the GAS Supply InstallationControl Upgrade Safety PrecautionsCable Retention Method Installation of the FireScrew Fixing Method Fitting the Decorative Inner panelAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Commissioning Installation / CommissioningLighting the fire Servicing Requirements Servicing InstructionsServicing Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Piezo Replacing PartsGeneral Ignition LeadPilot injector Ignition electrode Thermocouple Ods pilot unitMain injector Gas valveMag unit Changing between gas types Spare parts list-E-STUDIOSpare parts list Logic E-BOX Service Records