Stovax PR0741 manual Servicing Instructions, Servicing Requirements

Page 24

SERVICING INSTRUCTIONS

SERVICING

1. SERVICING REQUIREMENTS

This fire must be serviced at least once a year by a competent person.

All tests must be serviced by best practice as described by the current CORGI recommendations.

1.1Before any tests are undertaken on the fire, conduct a gas soundness test for the property to ensure that there are no gas leaks prior to starting work.

1.2Before any tests are undertaken on the fire it is also recommended to fully check the operation of the fire.

1.3Special checks

1.3.1Clean any lint or fluff from the pilot - pay particular attention to the aeration hole in the side of the pilot.

1.3.2Clean away any fluff or lint from under the burner

1.3.3Check that the spark gap on the pilot is correct.

1.4Correct any faults found during the initial tests and then recommission the fire conducting the usual safety checks.

1.5Advise the customer of any remedial action taken.

1.6As part of the annual service, the space behind the firebox must be inspected for any debris, which may have fallen down the chimney.

1.7To remove the fire from the firebox first remove the decorative frame. There are two screws securing the frame to the fire. Refer to separate frame instructions.

1.8Turn off the gas supply at the isolation device located under the fire.

1.9Disconnect the gas supply pipe leaving the isolation device on the supply pipe and not the fire.

1.10Remove the glass window by removing the four screws in the retaining bracket, Diagram 1.

1

E-STUDIO

 

 

LOGIC E-BOX

 

AR1377

 

AR1767

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOGIC E-BOX

1.11Remove the loose coals, and place on a dry, clean surface.

1.12Remove the front coal, flame baffle and all the ceramic liners. All these items are very fragile so store them carefully.

1.13Remove the five screws securing the burner unit to the fire and lift clear. See diagram 2

2

Logic E-Box

 

AR1372

E-STUDIO

1.14Remove the five screws securing the burner unit. Gently slide the whole burner assembly forward. Gently empty the granite chippings onto a dry clean surface. Clean any debris from the burner skin.

3

AR1775

1.15Remove the two decorative panel securing clamps, Diagram 4

4

AR1931

24

Image 24
Contents Studio& Logic E-box Contents APPLIANCE COMMISSIONING CHECKLIST FLUE CHECKPass Fail GAS CHECKUser Instructions GeneralLighting the Fire Turning the Fire OFFCleaning the E-studio Cleaning the logic-e boxStudio Arrangement of Fuel BED Components AR1769 ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS Logic E-BOXArrangEMENT of fuel bed Components Large Medium Small Pebble Layout Installation details Oxygen depletion sensorFlame failure device RunningInstallation Instructions Technical SpecificationStudiomodels 8691CFCHUC P8691CFCHUCFinish Arts Frame Holyrood SpanishOverall External Dimensions Plan View Site Requirements Flue and Chimney RequirementsFire Location GAS Supply VentilationAIR Vents Must not be Restricted Installation Control UpgradeSafety Precautions Installation of the GAS SupplyInstallation of the Fire Cable Retention MethodFitting the Decorative Inner panel Screw Fixing MethodAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Installation / Commissioning Lighting the fireCommissioning Servicing Instructions ServicingServicing Requirements Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Replacing Parts GeneralIgnition Lead PiezoOds pilot unit Pilot injector Ignition electrode ThermocoupleGas valve Mag unitMain injector Spare parts list-E-STUDIO Spare parts list Logic E-BOXChanging between gas types Service Records