Stovax PR0741 manual Appliance Commissioning Checklist, Flue Check, Pass Fail, Gas Check

Page 3

APPLIANCE COMMISSIONING CHECKLIST

IMPORTaNT NOTICE

Explain the operation of the fire to the end user, hand the completed instructions to them for safe keeping,

as the information will be required when making any guaranteed claims.

FLUE CHECK

 

 

Pass

Fail

 

 

 

 

 

 

1.

Flue is correct for fire

 

 

 

 

 

 

 

 

 

 

2.

Flue flow test

 

 

 

 

 

 

 

 

 

 

3.

Spillage test

 

 

 

 

 

 

 

 

 

GAS CHECK

 

 

 

 

 

 

 

 

 

 

1.

Gas soundness & let by test

 

 

 

 

 

 

 

 

 

 

2.

Standing pressure test

 

 

mb

 

 

 

 

 

 

 

3.

Fire working pressure (on High Setting)

 

 

mb

 

 

NB All other gas fires must be operating on full

 

 

 

 

 

 

 

 

 

 

4.

Gas rate

 

 

m3/h

 

5.

Does ventilation meet fire requirements

 

 

 

 

 

 

 

 

 

 

6.

Have controls been upgraded (Upgradable models only)

8455 Standard

YES

NO

 

 

 

 

 

 

8456 Programmable Thermostatic and Timer

YES

NO

 

 

 

 

 

 

 

 

 

 

 

 

DEALER AND INSTALLER INFORMATION

Dealer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contact No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date of Purchase. . . . . . . . . . . . . . . . . . . . . . . . . . . .

Model No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Serial No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Gas Type. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Installation Company . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Engineer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Contact No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Corgi Reg No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Date of Installation . . . . . . . . . . . . . . . . . . . . . . . . . . .

This product is guaranteed for 2 years from the date of installation, as set out in the terms and conditions of sale between Gazco and your local Gazco dealer. This guarantee will be invalid, to the extent permitted by law, if the above Fire Commissioning Checklist is not fully completed by the installer and available for inspection by a Gazco engineer. The guarantee will only be valid during the

second year, to the extent permitted by law, if the annual service recommended in the Instructions for Use has been completed by a Corgi registered engineer, and a copy of the service visit report is available for inspection by a Gazco engineer.

3

Image 3
Contents Studio& Logic E-box Contents GAS CHECK APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK Pass FailTurning the Fire OFF User InstructionsGeneral Lighting the FireCleaning the E-studio Cleaning the logic-e boxStudio Arrangement of Fuel BED Components AR1769 ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS Logic E-BOXArrangEMENT of fuel bed Components Large Medium Small Pebble Layout Running Installation detailsOxygen depletion sensor Flame failure deviceP8691CFCHUC Installation InstructionsTechnical Specification Studiomodels 8691CFCHUCHolyrood Spanish Finish Arts FrameOverall External Dimensions Plan View Site Requirements Flue and Chimney RequirementsFire Location GAS Supply VentilationAIR Vents Must not be Restricted Installation of the GAS Supply InstallationControl Upgrade Safety PrecautionsCable Retention Method Installation of the FireScrew Fixing Method Fitting the Decorative Inner panelAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Installation / Commissioning Lighting the fireCommissioning Servicing Instructions ServicingServicing Requirements Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Piezo Replacing PartsGeneral Ignition LeadPilot injector Ignition electrode Thermocouple Ods pilot unitGas valve Mag unitMain injector Spare parts list-E-STUDIO Spare parts list Logic E-BOXChanging between gas types Service Records