Stovax PR0741 manual Pebble Layout

Page 22

INSTALLATION INSTRUCTIONS

INSTALLATION

Pebble Layout

9.12Position the pebble flame baffle centrally on the tray and ensure the stepped lower edge engages against the rear edge of the burner skin, Diagram 30

30

AR1406

9.13Place the front pebble piece centrally in the channel at the front of the tray, Diagram 31.

31

AR1407

9.14Place the four pebbles as identified resting between the front ceramic and the flame baffle as shown in diagram 32.

32

A4

A5

A3

A6

AR1408

9.15Place the next four pebbles as identified resting between the flame baffle and the first row of pebbles as shown in diagram 33.

33

A1

 

A2

 

A1

 

 

AR1409

 

 

 

 

 

 

 

9.16Place the remaining two pebbles identified as shown in diagram 34.

34

A3

A3

 

AR1410

9.17The coals/pebbles should evenly cover the whole bed with the gaps between them kept equal. This will maximise the performance of the product

9.18ENSURE THAT THE COALS/PEBBLES ARE POSITIONED AS ABOVE. ONLY USE THE CORRECT AMOUNT OF COALS/PEBBLES AS SPECIFIED IN THE DIAGRAMS.

9.19Ensure that the fibre glass window seal on the box is intact, then lower the glass window into the hooks on the box. Secure the window using four screws in the retaining bracket. See diagram 35.

35

 

 

AR1380

AR1377

 

 

 

 

 

NEVER OPERATE THE FIRE WHEN THE GLASS

PANEL IS REMOVED OR BROKEN

22

Image 22
Contents Studio& Logic E-box Contents Pass Fail APPLIANCE COMMISSIONING CHECKLISTFLUE CHECK GAS CHECKLighting the Fire User InstructionsGeneral Turning the Fire OFFCleaning the logic-e box Cleaning the E-studioStudio Arrangement of Fuel BED Components AR1769 Logic E-BOX ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICSArrangEMENT of fuel bed Components Large Medium Small Pebble Layout Flame failure device Installation detailsOxygen depletion sensor RunningStudiomodels 8691CFCHUC Installation InstructionsTechnical Specification P8691CFCHUCFinish Arts Frame Holyrood SpanishOverall External Dimensions Plan View Flue and Chimney Requirements Site RequirementsFire Location Ventilation GAS SupplyAIR Vents Must not be Restricted Safety Precautions InstallationControl Upgrade Installation of the GAS SupplyInstallation of the Fire Cable Retention MethodFitting the Decorative Inner panel Screw Fixing MethodAR1931 Logic E-BOX arrangEMENT of fuel bed components AR1364 Pebble Layout Lighting the fire Installation / CommissioningCommissioning Servicing Servicing InstructionsServicing Requirements Studio & Logic E-BOX Servicing Instructions Fault Finding Charts Fault Finding Charts Ignition Lead Replacing PartsGeneral PiezoOds pilot unit Pilot injector Ignition electrode ThermocoupleMag unit Gas valveMain injector Spare parts list Logic E-BOX Spare parts list-E-STUDIOChanging between gas types Service Records