Therma-Tru Fiber-Classic, Smooth-Star manual Attach Sill to Jambs, Attach Head to Jambs

Page 5

4

ATTACH SILL TO JAMBS

NOTE: Be sure that foam pads are in place before assembling frame.

Sealant

Jamb

Pads

Apply sealant here

INACTIVE side ONLY

Apply sealant to sill and side jambs as shown.

Fasten side jambs to sill through pre-drilled holes using (3) #10 x 3" flat head screws. (Starting with center screw is recommended.)

Repeat of opposite side.

Sill

Sealant

Jamb

Sill

Sealant

#10 x 3” flat head screw

5

ATTACH HEAD TO JAMBS

 

Apply sealant to end of head

Head Jamb

jamb.

 

Side Jamb

Fasten side jambs to head jamb

 

through pre-drilled holes using

 

(3) #10 x 3" flat head screws.

 

(Starting with center screw is

 

recommended.)

 

Repeat for opposite side.

Sealant

#10 x 3” flat head screw

4

Image 5
Contents Double Unit Assembly & Installation Screen sold separately Active Panel Inactive Panel Screw Chart LAY Frame Components Onto Work Area If APPLICABLE, Install TOP-HUNG Screen TrackInstall Sill CAP Base Attach Head to Jambs Attach Sill to JambsApply Corner Pads to Sealing FIN Drip CAP InstallationFrame Installation SET Unit Into Rough Opening Apply Silicone Sealant to Sill and FinsPlumb Side Jambs Level SillApply Sealant to Inactive Door Riser Secure Frame in Rough OpeningInstall Anchor Blocks Install Stationary PanelAdjust Rollers Install Active PanelAttach Inactive Interlock Install Active InterlockAttach Strike Plate Handle InstallationInsert Panel Bumper Attach Foot Bolt Install Sill CAP TOPPrep Door for Foot Bolt Insert Plugs Install Foot Bolt KeeperAttach Jamb Cover Sliding Screen DoorActive panel edge Dia holes 1 deep Towards Page Finishing Instructions Jamb Extension Information WEATHERPROOF, Finish and MaintainInterior Casing Attachment Sizing Information Door Handing Guide Patiodoorsystems