Therma-Tru Fiber-Classic, Smooth-Star manual Level Sill, Plumb Side Jambs

Page 9

10

LEVEL SILL

Sill MUST be flat and level.

Check and make any necessary adjustments.

If necessary, add temporary blocking under projecting exterior edge of sill to serve as support during construction.

11

PLUMB SIDE JAMBS

Interior

Jambs must be plumb and straight.

Shim as necessary at screw locations to remove any bow.

Fasten system to rough opening using staples, nails, or screws through sealing fin at the corners.

Fasten through every third opening in the sealing fin.

If needed, jambs can be back filled with insulation.

Shims

8

Image 9
Contents Double Unit Assembly & Installation Screen sold separately Active Panel Inactive Panel Screw Chart If APPLICABLE, Install TOP-HUNG Screen Track Install Sill CAP BaseLAY Frame Components Onto Work Area Attach Head to Jambs Attach Sill to JambsApply Corner Pads to Sealing FIN Drip CAP InstallationFrame Installation SET Unit Into Rough Opening Apply Silicone Sealant to Sill and FinsPlumb Side Jambs Level SillApply Sealant to Inactive Door Riser Secure Frame in Rough OpeningInstall Anchor Blocks Install Stationary PanelAdjust Rollers Install Active PanelAttach Inactive Interlock Install Active InterlockHandle Installation Insert Panel BumperAttach Strike Plate Install Sill CAP TOP Prep Door for Foot BoltAttach Foot Bolt Insert Plugs Install Foot Bolt KeeperAttach Jamb Cover Sliding Screen DoorActive panel edge Dia holes 1 deep Towards Page Finishing Instructions Jamb Extension Information WEATHERPROOF, Finish and MaintainInterior Casing Attachment Sizing Information Door Handing Guide Patiodoorsystems