Samsung AR18HPFNBGMNMG, AR18HCFNBWK/MG, AR12HCFNBWKNMD Performing the gas leak tests, English-47

Page 47

Performing the gas leak tests

Make sure to check for gas leaks before completing the installation process (connecting the assembly pipe and hose between indoor unit and outdoor unit, insulating the cables, hose and pipe, and fixing the indoor unit to the installation plate).

A C D

B

t05s In llan atio

Test part for outdoor unit

Tightening torque for body cap (Refer to the table)

Spindle

Charging core

R-22: Diameter of the screw - 7/16-20UNF

R-410A: Diameter of the screw - 1/2-20UNF

Tightening torque for charging port cap (Refer to the table)

Test part for indoor unit

Before inspecting the leakage, use a torque wrench to close the cap for the service valve. (Comply with a tightening torque for each size of the diameter,and tighten the cap firmly to prevent any leakage.).

To check for any possible leakage, insert inert gas into the pipes connected to indoor/outdoor units and check the connection part of the indoor/outdoor units with soap lather or liquid for leakage test.

Outer

Tightening torque

Diameter

Body cap (N•m)

Charging port cap

(mm)

(N•m)

 

ø 6.35

20 ~ 25

 

ø 9.52

20 ~ 25

 

ø12.70

25 ~ 30

10 ~ 12

ø15.88

30 ~ 35

 

ø19.05

35 ~ 40

 

To check for gas leaks on the outdoor unit,

( 1 N•m = 10 kgf•cm )

Check the valve A and B using a leak detector.

 

To check for gas leaks on the indoor unit,

 

Check the flare nut C and D using a leak detector.

 

Leak test with nitrogen (before opening valves)

In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R-22.

Leak test (after opening valves)

Before opening valves, discharge all the nitrogen from the system and create vacuum according to page 45~46. After opening valves, check leaks using a leak detector for refrigerant.

Pump down (before disconnecting the refrigerant connections for unit repair, removal or disposal) Pump-down is an operation intended to collect all the system refrigerant in the outdoor unit.

This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the atmosphere.

Shut off the liquid valve with the Allen wrench.

Turn the system on in cooling with fan operating at high velocity.

(Compressor will immediately start, provided 3 minutes have elapsed since the last stop).

After 2 minutes of operation, shut the suction valve with the same wrench.

Turn the system off and switch mains supply off.

Disconnect tubing. After disconnection, protect valves and tubing ends from dust.

Compressor damage may occur if run at a negative suction pressure.

English-47

MG_GOOD_A3050_IB&IM_EN_DB68-04069A-00.indd 47

11/09/2013 21:11:20

Image 47
Contents Air Conditioner Features of your new air conditioner Contents English-4 Safety precautions01epaPr n atio English-5English-6 For UsingEnglish-7 English-8 Do not place objects or devices under the indoor unitEnglish-9 For CleaningEnglish-10 Checking before useOperation ranges T05s In llan atio Technical SpecificationsEnglish-11 English-12 Checking the name of the partsMain parts DisplayEnglish-13 Checking the remote controllerRemote controller buttons Inserting the batteries Remote controller displayBattery changing time Storing the remote controllerBasic function English-16 Press the button to adjust the temperaturePress the button to set the desired fan speed English-17 Adjusting the air flow directionVertical air flow Horizontal air flowEnglish-18 Using the Fast functionUsing the Comfort function English-19 When the air conditioner is on and in cool/heat modeMode English-20 Setting the On/Off timerPress the On Timer/Off Timer button Turn off automatically From the moment you have set the timerIf the air conditioner is on If the air conditioner is off English-22 Using the Auto Clean functionWhen the air conditioner is turned on Sre04 Oth Cleaning the air conditionerCleaning the outdoor unit heat exchanger English-23Remove the air filter from the main body Cleaning the air filterRemoving the Air filter English-24Top of the Air filter into the main body.. ➀ Reassembling the Air filterEnglish-25 English-26 Maintaining the air conditionerEnglish-27 TroubleshootingAir conditioner Heard when refrigerant flow movement changes. It is normal Button or disconnect the power plug/switchCheck the Drains have been cleared Regular Maintenance Error is indicatedEnglish-29 General informationIndoor unit Choosing the installation locationInstalling the unit Power supply line, fuse or circuit breakerEnglish-31 Where sulfide gas existsOutdoor Unit  Figure Description When installing more than 1 outdoor unitWhen the air outlet is towards the wall English-32Llan AccessoriesAccessories in the indoor unit case English-33Tools for test operations Accessories in the outdoor unit caseOptional accessories Tools required for installation General ToolsEnglish-35 Fixing the installation plateAssembling the hanger screw English-36 This QR code for detail video of indoor unit installationRemoving the screws Removing the Cover panel Before mounting the indoor unitEnglish-37 Assembling the Cover panel After mounting the indoor unitEnglish-38 Connecting the assembly cableCable specification Connecting the cableEnglish-39 Extend the assembly cable if necessaryEach wire is labeled with the corresponding terminal number Torque English-40Smooth the cut edges Cut off the remaining foam insulationUnscrew the caps at the end of each pipe Evacuating the indoor unitCutting or extending the pipe English-41Depth a English-42Put a flare nut slightly into the pipe and modify the flare English-43 Drain hose installationDownwards as seen in the picture Change the direction only when it is necessaryEnglish-44 ShieldDrain hole Drain plug Evacuating the connected pipesEnglish-45 Connect a drain hose to the drain plugIf you use a pipe longer than 5 m Adding RefrigerantEnglish-46 Outer TorqueEnglish-47 Performing the gas leak tests12HC 507 12HP 543 18HC 602 Outdoor unit installed on the wall by rackFixing the outdoor unit in place English-48English-49 Smart Install modeOff Blinking English-50English-51 Final check and trial operationAfter tube contraction work is completed, wrap it with How to connect your extended power cablesEnglish-52 Apply heat to the contraction tube to contract itMGGOODA3050IB&IMENDB68-04069A-00.indd 11/09/2013 0211 Questions or COMMENTS?