START-UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II.
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK GAS PIPING FOR LEAKS (WHERE APPLICABLE)
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
III.START-UP ELECTRICAL SUPPLY VOLTAGE COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE | DB | |||||||||||||||||
|
|
|
|
|
|
|
| DB |
|
|
| WB | ||||||
COOLING SUPPLY AIR |
|
|
| DB |
|
| WB | |||||||||||
HEAT PUMP SUPPLY AIR__________________ |
|
|
| |||||||||||||||
GAS HEAT SUPPLY AIR |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
PRESSURES |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
GAS INLET PRESSURE |
|
| IN. W.C. |
|
|
| ||||||||||||
GAS MANIFOLD PRESSURE |
|
|
|
|
|
| IN. W.C. |
|
|
| ||||||||
REFRIGERANT SUCTION |
|
|
|
| PSIG, SUCTION LINE TEMP* |
| ||||||||||||
REFRIGERANT DISCHARGE |
|
|
|
|
|
|
| PSIG, LIQUID TEMP{ | ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS GAS HEAT TEMPERATURE RISE
TEMPERATURE RISE (See Literature) RANGE MEASURED TEMPERATURE RISE
* Measured at suction inlet to compressor
{Measured at liquid line leaving condenser.
48EZ -- A
Copyright 2010 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231 | Edition Date: 09/10 | Catalog No: |
|
| |
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations. | Replaces: |
41