Quadra-Fire CASTILE-CLG, CASTILE-MBK Straight Out, Degree, Castile Pellet Stove Through The Wall

Page 13

Castile Pellet Stove

R

B. Through The Wall

Horizontal termination cap must be a minimum of 12 inches. (305mm) from the wall. Approved for mobile home instal- lations. Must use 3 or 4 inch (76-102mm) “L” or “PL” listed pellet venting or listed double wall pipe and a Quadra-Fire Outside Air Kit in mobile homes.

NOTE:

In Canada, where passage through a wall or partition of combustible construction is desired, the installation shall conform to CAN/CSA-B365

Straight Out

2 in.

 

(51mm)

 

 

Minimum

 

6 in.

 

Horizontal

Wall

Termination

(152mm)

Thimble

Cap

Minimum

 

 

From Glass

 

 

 

12 in.

 

 

(305mm)

 

 

Minimum

 

 

Noncombustible Hearth Pad

 

Figure 13.1

 

 

45 Degree

Illustration shows venting going in both directions.

Choose which one is best for your installation.

Wall

Thimble

2 in. (51mm) Minimum

2 in. (51mm) Minimum

Figure 13.2

October 11,, 2005

250-6422D

Page 13

Image 13
Contents Castile Pellet Stove Location Back side of left side panel Castile Pellet StoveTable of Contents Listing and Code Approvals Getting Started Design, Installation & Location Fire Safety ConsiderationsAppliance Location Thermostat LocationMeasuring Standards Castile Pellet Stove Tools And Supplies NeededInspect Appliance & Components and Pre-Use Check List Fire RiskAppliance Dimensions 3Dimensions and ClearancesCastile Pellet Stove Clearances to Combustibles UL and ULC Castile Pellet Stove Hearth Pad Requirements UL and ULC Exception for Horizontal InstallationsHearth Pad Requirements Chimney and Exhaust Connection Vent InformationVenting Termination Requirements Castile Pellet Stove Equivalent Feet of Pipe Pipe Selection ChartExample of 3 Elbow-Rear Vent Termination Calculaton See FigureAlcove Venting SystemsDegree Straight OutCastile Pellet Stove Through The Wall Through The Wall & Vertical Castile Pellet Stove VerticalAlternate Masonry Castile Pellet Stove MasonryMobile Home Outside Air Kit Instructions 7Appliance Set-UpRear Vent and Rear Vent to Top Vent Adapter Installation Top Vent Adapter InstallationInstalling the Top Vent Adapter Castile Pellet Stove Leg Leveling SystemOptional TOP LOG Castile Pellet Stove Thermostat Installation Fuel Size And Material General Operating Information Operating InstructionsFeed Rate Adjustment Instructions Fire CharacteristicsCastile Pellet Stove Before Your First Fire Starting Your First FireCastile Pellet Stove Iginition Cycles Frequently Asked QuestionsSymption TroubleshootingPossible Cause Corrective Action Page Page 10Maintaining & Servicing Your Appliance Cleaning Ash Pan Frequency As neededTypes of Fuel TaskHeat Exchanger Tubes Cleaning RodsCleaning the Hopper Cleaning the Exhaust Path Frequency As neededCleaning Convection Blower Requires No Lubrication Cleaning Exhaust Blower Requires No LubricationSection Castile Pellet Stove High Ash Fuel Content MaintenanceExhaust Blower Replacement Convection Blower ReplacementThumb Screw Igniter ReplacementGlass Replacement Component Function Reference MaterialsWiring Harness See .1 below Vacuum SwitchSnap Disc #1 Convection Blower 125F Snap Disc #2 Thermostat Override 175tFCastile Pellet Stove Component Locations Description Part Number Castile Pellet Stove Exploded ViewsPart Description Beg. Manufacture Date SeptemberService Parts Castile Pellet Stove Service Parts and AccessoriesAppliances AccessoriesDate of Service Performed By Description of Service Service and Maintenance LOGCastile Pellet Stove Service and Maintenance LOG Cont’d Castile Pellet Stove Warranty Policy Lifetime WarrantyTelephone Contact Information