Quadra-Fire CASTILE-CCR, CASTILE-MBK Castile Pellet Stove Vertical, Through The Wall & Vertical

Page 14

R

Castile Pellet Stove

C. Vertical

We recommend a minimum of 60 in. (1524mm) vertical, however above the eave is preferred.

Both installations are approved for mobile home installations. Must use 3 or 4 inch (76 to 102mm) “L” or “PL” listed pellet venting or listed double wall pipe and Quadra-Fire Outside Air Kit in mobile homes. Single wall pipe is approved for residential installations only.

Figure 14.1

D. Through The Wall & Vertical

Rain Cap

Flashing

24 in. (610mm) minimum

 

 

Support Bracket

2 in. (51mm) minimum

every 60 in. (1524mm)

6 in. (152mm)

Wall Thimble

 

minimum

 

 

Tee

 

Cleanout Cover

Non-combustible Hearth Pad

Figure 14.2

Page 14

250-6422D

October 11, 2005

Image 14
Contents Castile Pellet Stove Castile Pellet Stove Location Back side of left side panelTable of Contents Listing and Code Approvals Appliance Location Design, Installation & Location Fire Safety ConsiderationsGetting Started Thermostat LocationInspect Appliance & Components and Pre-Use Check List Castile Pellet Stove Tools And Supplies NeededMeasuring Standards Fire Risk3Dimensions and Clearances Appliance DimensionsCastile Pellet Stove Clearances to Combustibles UL and ULC Hearth Pad Requirements Exception for Horizontal InstallationsCastile Pellet Stove Hearth Pad Requirements UL and ULC Venting Termination Requirements Vent InformationChimney and Exhaust Connection Example of 3 Elbow-Rear Vent Termination Calculaton Pipe Selection ChartCastile Pellet Stove Equivalent Feet of Pipe See FigureVenting Systems AlcoveCastile Pellet Stove Through The Wall Straight OutDegree Castile Pellet Stove Vertical Through The Wall & VerticalCastile Pellet Stove Masonry Alternate MasonryMobile Home 7Appliance Set-Up Outside Air Kit InstructionsInstalling the Top Vent Adapter Top Vent Adapter InstallationRear Vent and Rear Vent to Top Vent Adapter Installation Castile Pellet Stove Leg Leveling SystemOptional TOP LOG Castile Pellet Stove Thermostat Installation Operating Instructions Fuel Size And Material General Operating InformationCastile Pellet Stove Before Your First Fire Fire CharacteristicsFeed Rate Adjustment Instructions Starting Your First FireFrequently Asked Questions Castile Pellet Stove Iginition CyclesPossible Cause Corrective Action TroubleshootingSymption Page Page Types of Fuel Cleaning Ash Pan Frequency As needed10Maintaining & Servicing Your Appliance TaskCleaning Rods Heat Exchanger TubesCleaning Convection Blower Requires No Lubrication Cleaning the Exhaust Path Frequency As neededCleaning the Hopper Cleaning Exhaust Blower Requires No LubricationCastile Pellet Stove High Ash Fuel Content Maintenance SectionConvection Blower Replacement Exhaust Blower ReplacementIgniter Replacement Thumb ScrewGlass Replacement Reference Materials Component FunctionSnap Disc #1 Convection Blower 125F Vacuum SwitchWiring Harness See .1 below Snap Disc #2 Thermostat Override 175tFCastile Pellet Stove Component Locations Castile Pellet Stove Exploded Views Description Part NumberBeg. Manufacture Date September Part DescriptionCastile Pellet Stove Service Parts and Accessories Service PartsAccessories AppliancesService and Maintenance LOG Date of Service Performed By Description of ServiceCastile Pellet Stove Service and Maintenance LOG Cont’d Lifetime Warranty Castile Pellet Stove Warranty PolicyContact Information Telephone