Quadra-Fire CB1200-B owner manual Appliance Set-Up, Outside Air Kit Instructions

Page 17

 

R

CB 1200 Pellet Stove

 

 

 

 

 

 

 

 

7

Appliance Set-Up

 

 

 

 

 

 

 

 

A. Outside Air Kit Instructions

Included in Kit: 1 piece of 2 inch x 3 foot flex hose, 2 hose clamps, 1 collar assembly, termination cap assembly, 1 trim ring, 12 screws.

Tools Needed: Phillips head screw driver; wire cutters; hole saw or jig saw.

1.Rear Installation

2.Floor Installation

a.Remove rear screen and set aside.

b.Install cover plate over hole in right rear floor.

c.Cut a 2 inch minimum hole in the floor to accommodate flex hose.

d.Attach hose to termination cap.

e.Place rope under pedestal to close off air leaks.

a.Measure distance from floor to air vent opening in appli- ance and mark location on wall.

Use saw to cut opening in wall. Cut a 2-1/2 to 3 inch (64-76mm) opening on inside wall and a 3 to 3-1/2 inch

(76-89mm) opening on outside of house.

b.Use hose clamp to secure flex pipe to collar assembly.

c.Slide trim ring over flex pipe and run pipe through wall.

d.Attach hose to outside termination cap with second hose clamp.

e.Secure termination cap to outside surface.

f.Secure trim ring to interior wall.

g.Snip corners and remove plate. Figure 17.1.

h.Align and secure collar assembly with 2 of the 4 holes as shown. Figure 17.2.

Snip Corners and remove plate

Figure 17.1

Secure Collar

NO

NO

Screen

Install Cover Plate

Seal Pedestal with 26 in. Rope

Figure 17.3

Termination

Cap Assembly

Hose Clamp

Trim Ring

Flex Hose

Figure 17.2

CAUTION

Never draw outside combustion air from:

Wall, floor or ceiling cavity

Enclosed space such as an attic or garage

Hose Clamp

Collar Assembly

Figure 17.4

September 1, 2008

7014-082D

Page 17

Image 17
Contents Hot glass will cause burns Classic BAY 1200 Pellet StoveCB 1200 Pellet Stove Testing Lab & Report NumberBehind left side curtain on outside of hopper wall Serial Number ModelTable of Contents Listing and Code Approvals Fire Safety Design, Installation & Location ConsiderationsGetting Started Appliance LocationInspect Appliance & Components and Pre-Use Check List CB 1200 Pellet Stove Tools And Supplies NeededAppliance Dimensions Dimensions and ClearancesCB 1200 Pellet Stove Clearances to Combustibles UL and ULC Hearth Pad Requirements Exception for Horizontal InstallationsCB 1200 Pellet Stove Hearth Pad Requirements UL and ULC Vent Information Example of 3 Elbow-Rear Vent Termination Calculaton Pipe Selection ChartCB 1200 Pellet Stove Equivalent Feet of Pipe Alcove 5Venting SystemsCB 1200 Pellet Stove Through The Wall Straight OutDegree Through The Wall & Vertical CB 1200 Pellet Stove VerticalAlternate Masonry MasonryMobile Home Outside Air Kit Instructions Rear Installation Floor InstallationAppliance Set-Up Rear Vent and Rear Vent to Top Vent Adapter Installation CB 1200 Pellet Stove Top Vent Adapter InstallationInstalling the Top Vent Adapter See FigureBrick Clip Installation CB 1200 Pellet Stove Optional Brick Set InstallationCharred Areas in the Back Installing Logo Nickel OnlyTop Log, Left RightCB 1200 Pellet Stove Thermostat Installation Door InstallationTo install door To adjust latchesFuel Size And Material General Operating Information Operating InstructionsStarting Your First Fire Feed Rate Adjustment InstructionsCB 1200 Pellet Stove Ignition Cycles Frequently Asked QuestionsPossible Cause Corrective Action TroubleshootingSymptom Page Page 10Maintaining & Servicing Your Appliance Quick Reference Maintenance ChartFrequency Daily Weekly Monthly Yearly Types of FuelCleaning Ash Pan Cleaning Firepot with Cleaning Rod & Firepot ScraperCleaning Heat Exchanger Chambers & Drop Tube Ash Removal from FireboxCleaning Exhaust Path Cleaning Beneath Heat ExchangerCleaning the Glass Cleaning the HopperPreparing Firebox for Non-Burn Season Frequency Yearly Cleaning the Top Vent AdapterConvection Blower Replacement CB 1200 Pellet Stove High Ash Fuel Content MaintenanceRe-install blower to blower housing Exhaust Blower Replacement Remove existing blowerInstall new blower Replacing Side Glass Glass ReplacementComponent Function & Location Reference MaterialsWiring Harness See .1 below Vacuum SwitchSnap Disc #1 Convection Blower 145F Snap Disc #2 Thermostat Override 200FCB 1200 Pellet Stove Component Locations Cleaning Rods Heat Exchanger TubesGlass Size Sides 8 wide x 11 high CB 1200 Pellet Stove Exploded ViewsGlass Size Center 13-7/8 wide x 11 high Nbr Description CB 1200 Pellet Stove Item # Parts Alphabetical Order CB 1200 Pellet Stove Service Parts and AccessoriesItem # Service Parts Alphabetical Order Appliance AccessoriesDate of Service Performed By Description of Service CB 1200 Pellet Stove Service And Maintenance LogCB 1200 Pellet Stove Homeowner’s Notes CONDITIONS, Exclusions & Limitation of Liability CB 1200 Pellet Stove Warranty PolicyHearth & Home Technologies Limited Warranty Cont’d Contact Information