Quadra-Fire CB1200-B owner manual CB 1200 Pellet Stove Service Parts and Accessories

Page 41

R

CB 1200 Pellet Stove

D. Service Parts and Accessories

IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on the Quadra- Fire web site at www.quadrafire.com. When ordering, supply serial and model numbers to ensure correct service parts.

Item #

Parts (Alphabetical Order)

Part No.

24

Ash Pan

812-4050

36

Baffle Assembly, Left

510-5350

35

Baffle Assembly, Right

510-5360

 

Baffle Center

812-3440

53

Blower, Convection

812-3370

40

Blower, Exhaust

812-3381

 

Bolt, Firepot, 1-1/4” long

225-0120

 

Bracket, Door Hinge

812-4030

 

Bracket, Door Latch

410-4912

 

Collar Assembly, Outside Air Kit

7001-045

 

Component Pack (Includes firepot clean-out tool, touch-up paint, power cord & wiring harness

 

 

to the thermostat and manual, owner’s manual, warranty card, consumer’s view card and

812-3630

 

“How-To-Operate” DVD)

 

65

Control Box

SRV7000-205

66

Cover, Control Box

410-6321

68

Cover, Feed Motor

410-5311

37

Curtain Mount, Side, Left

410-5251

56

Curtain Mount, Side, Right

410-5261

70

Curtain, Air Deflector, Left

410-4992

61

Curtain, Air Deflector, Right

410-5105

39,58

Curtain, Pedestal, Sides (interchangeable)

410-5391

38

Curtain, Side, Left

812-3840

59

Curtain, Side Right

812-3800

6

Door Latch Bracket

410-4912

51

Exhaust Plenum Clean-Out Plate

410-4871

46

Exhaust Plenum Trap Door

812-4100

67

Feed Adjustment Plate with Rod

812-4170

 

Feed Motor

812-4421

69

Feed Motor & Spring Assembly

812-3690

 

Feed Motor Capacitor Jumper

230-2150

 

Feed Motor Mount

410-7172

 

Feed Spring Only

SRV7037-024

43

Firepot, EZ Clean

812-3351

 

Firepot Floor (Slide Plate)

414-0290

42

Firepot Pull Rod Assembly (Linkage)

812-3850

 

Firepot Rod/Linkage

812-3850

 

Fuse .7 amp, Junction Box

812-0380

 

Gasket, Ash Pan, 10 ft

834-1460

 

Gasket, (Rope) Door, cut to size, 7-1/2 ft

842-2350

41

Gasket, Exhaust Blower

240-0812

 

Gasket, Firepot

510-0530

2

Glass Assembly, Center

510-5400

3

Glass Assembly, Left or Right, 1 pc

510-5410

September 1, 2008

7014-082D

Page 41

Image 41
Contents Hot glass will cause burns Classic BAY 1200 Pellet StoveCB 1200 Pellet Stove Testing Lab & Report NumberBehind left side curtain on outside of hopper wall Serial Number ModelTable of Contents Listing and Code Approvals Fire Safety Design, Installation & Location ConsiderationsGetting Started Appliance LocationInspect Appliance & Components and Pre-Use Check List CB 1200 Pellet Stove Tools And Supplies NeededAppliance Dimensions Dimensions and ClearancesCB 1200 Pellet Stove Clearances to Combustibles UL and ULC Hearth Pad Requirements Exception for Horizontal InstallationsCB 1200 Pellet Stove Hearth Pad Requirements UL and ULC Vent Information Example of 3 Elbow-Rear Vent Termination Calculaton Pipe Selection ChartCB 1200 Pellet Stove Equivalent Feet of Pipe Alcove 5Venting SystemsCB 1200 Pellet Stove Through The Wall Straight OutDegree Through The Wall & Vertical CB 1200 Pellet Stove VerticalAlternate Masonry MasonryMobile Home Outside Air Kit Instructions Rear Installation Floor InstallationAppliance Set-Up Rear Vent and Rear Vent to Top Vent Adapter Installation CB 1200 Pellet Stove Top Vent Adapter InstallationInstalling the Top Vent Adapter See FigureBrick Clip Installation CB 1200 Pellet Stove Optional Brick Set InstallationCharred Areas in the Back Installing Logo Nickel OnlyTop Log, Left RightCB 1200 Pellet Stove Thermostat Installation Door InstallationTo install door To adjust latchesFuel Size And Material General Operating Information Operating InstructionsStarting Your First Fire Feed Rate Adjustment InstructionsCB 1200 Pellet Stove Ignition Cycles Frequently Asked QuestionsPossible Cause Corrective Action TroubleshootingSymptom Page Page 10Maintaining & Servicing Your Appliance Quick Reference Maintenance ChartFrequency Daily Weekly Monthly Yearly Types of FuelCleaning Ash Pan Cleaning Firepot with Cleaning Rod & Firepot ScraperCleaning Heat Exchanger Chambers & Drop Tube Ash Removal from FireboxCleaning Exhaust Path Cleaning Beneath Heat ExchangerCleaning the Glass Cleaning the HopperPreparing Firebox for Non-Burn Season Frequency Yearly Cleaning the Top Vent AdapterConvection Blower Replacement CB 1200 Pellet Stove High Ash Fuel Content MaintenanceRe-install blower to blower housing Exhaust Blower Replacement Remove existing blowerInstall new blower Replacing Side Glass Glass ReplacementComponent Function & Location Reference MaterialsWiring Harness See .1 below Vacuum SwitchSnap Disc #1 Convection Blower 145F Snap Disc #2 Thermostat Override 200FCB 1200 Pellet Stove Component Locations Cleaning Rods Heat Exchanger TubesGlass Size Sides 8 wide x 11 high CB 1200 Pellet Stove Exploded ViewsGlass Size Center 13-7/8 wide x 11 high Nbr Description CB 1200 Pellet Stove Item # Parts Alphabetical Order CB 1200 Pellet Stove Service Parts and AccessoriesItem # Service Parts Alphabetical Order Appliance AccessoriesDate of Service Performed By Description of Service CB 1200 Pellet Stove Service And Maintenance LogCB 1200 Pellet Stove Homeowner’s Notes CONDITIONS, Exclusions & Limitation of Liability CB 1200 Pellet Stove Warranty PolicyHearth & Home Technologies Limited Warranty Cont’d Contact Information