Quadra-Fire 21M-ACC owner manual Backwall / Sidewall Corner Installation

Page 10

2100 Millennium Wood Stove (ACC)

R

B. Clearances to Combustibles (UL and ULC)

BACKWALL / SIDEWALL

A

B

 

C

 

D

CORNER INSTALLATION

E

F

E

F

NOTE: Clearances may only be reduced by means approved by the regulatory authority having jurisdiction

STOVE TO CEILING

CLEARANCE

ALCOVE SIDE VIEW

G

A

 

 

B

ALCOVE TOP VIEW

C

D

WARNING

Fire Risk.

Comply with all minimum clearances to combustibles as specified.

Failure to comply may cause house fire.

NOTE: Service Space

In order to replace the tube channel assembly a clearance of 17 inches (432mm) is required on the right side of stove in order to remove the tubes with the stove in place.

If space is not available, the stove will have to be discon- nected from the chimney to proceed with the tube replace- ment.

Page 10

7039-131H

May 5, 2011

Image 10
Contents Hot glass will cause burns 7039-131H May 5Serial No Model Name Test Lab & Report No Millennium Wood Stove ACCMfg. Date 7039-131H May 5 Table of Contents Listing and Code Approvals Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Mobile Home ApprovedFire Safety Getting StartedAppliance needs to draft properly for safety Millennium Wood Stove ACC Negative PressureTools And Supplies Needed Millennium Wood Stove ACC Flue Draft ConsiderationsVenting Systems Inspect Appliance & Components Pre-Burn Check ListMillennium Wood Stove ACC Typical Stove Systems Masonry ChimneyDimensions and Clearances Appliance DimensionsBackwall / Sidewall Corner Installation See Figure InstallationRHearth Protection Requirements USA required Canada recommendedItems Needed for Installation not supplied Millennium Wood Stove ACC Outside Air Kit InstallationFloor Installation Alternative In some instances you Blower Optional 13-15/16 in mmVenting Components Chimney Systems Chimney ConnectorChimney Requirements ThimbleInstructions ComponentsAir Clearances Solid Pack Chimney with Metal Supports as a ThimbleSolid Pack Chimney with Metal Supports as a Thimble Cont’d Installing Chimney ComponentsSingle wall connector or stove pipe Chimney Height / Rise and RunPitched Roof Millennium Wood Stove ACC Chimney Termination RequirementsRule Flat RoofMobile Home Installation Door Handle Assembly Adjusting The Blower Speed Control Appliance Set-UpBurning Process Operating InstructionsOver-Firing Your Appliance Wood Selection & Storage Cont’d Wood Selection & StorageAutomatic Combustion Control ACC Air ControlsBurn Rates and Operating Efficiency Millennium Wood Stove ACC Building a Fire Incorrect Positions Opacity Smoke Initial cold start-up and all Burn SettingsMillennium Wood Stove ACC Blower Operating Instructions Snap Disc LocationOdor from appliance Millennium Wood Stove ACC Frequently Asked QuestionsAppliance Quick Reference Maintenance Guide Maintaining & Servicing Your ApplianceGlass Cleaning Frequency As desired Millennium Wood Stove ACC General MaintenanceCreosote Chimney Cleaning Disposal of AshesGlass Replacement When cleaning glassMillennium Wood Stove ACC Firebrick Replacement To your authorized dealerCorrect Blanket & Baffle Position on BaffleRemoving Tube Channel Assembly Millennium Wood Stove ACC Tube Channel Assembly ReplacementReplacing Tube Channel Assembly Troubleshooting Start Fire Problems Possible Cause Solution21M-ACC Millennium Wood Stove21M-ACC Stocked 21M-ACC Millennium Wood Stove ACC Service And Maintenance Log Date of Service Performed By Description of ServiceMillennium Wood Stove ACC Service And Maintenance Log Cont’d Millennium Wood Stove ACC Homeowner’s Notes Millennium Wood Stove ACC Homeowner’s Notes Millennium Wood Stove ACC Warranty Policy Millennium Wood Stove ACC Contact Information