Quadra-Fire 21M-ACC Millennium Wood Stove ACC Flue Draft Considerations, Venting Systems

Page 7

R

2100 Millennium Wood Stove (ACC)

D. Flue Draft Considerations

Location of the appliance and chimney will affect perfor- mance. As shown in Figure 6.1 on page 6 the chimney should:

Be installed through the warm space enclosed by the building envelope. This helps to produce more draft, especially during lighting and die down of the fire.

Penetrate the highest part of the roof. This minimizes the affects of wind turbulence and down drafts.

Consider the appliance location in order to avoid floor and ceiling attic joists and rafters.

Exterior conditions such as roof line, surrounding trees, prevailing winds and nearby hills can influence stove performance. Your local dealer is the expert in your geographic area and can usually make suggestions or discover solutions that will easily correct your flue problem.

To be sure that your appliance burns properly, the chimney draft (static pressure) should be approximately -.04 inch water column (W.C.) during a low burn and -.10 inch W.C. during a high burn, measured 6 inches (152mm) above the top of the appliance after one hour of operation at each burn setting.

NOTE: These are guidelines only, and may vary somewhat for individual installations.

E. Venting Systems

The venting system consists of a chimney connector (also known as stove pipe) and a chimney. These get extremely hot during use. Temperatures inside the chimney may exceed 2000°F (1100°C) in the event of a creosote fire. To protect against the possibility of a house fire, the chimney connector and chimney must be properly installed and maintained. An approved thimble must be used when a connection is made through a combustible wall to a chimney. A chimney support package must be used when a connection is made through the ceiling to a prefabricated chimney. These accessories are absolutely necessary to provide safe clearances to combustible wall and ceiling material. Follow venting manufacturer’s clearances when installing venting system.

F. Tools And Supplies Needed

Before beginning the installation be sure that the following tools and building supplies are available.

Reciprocating saw

Framing Material

Pliers

Hi-Temp Caulking Material

Hammer

Gloves

Phillips Head Screwdriver

Framing Square

Flat Blade Screwdriver

Electric Drill & Bits (1/4”)

Plumb Line

Safety Glasses

Level

1/2 in. - 3/4 in. length, #6 or

Tape Measure

#8 self drilling screws (need 3

 

per pipe section connection)

 

 

G. Inspect Appliance & Components and

Pre-Burn Check List

1.Place the appliance in a location near the final installation area and follow the procedures below:

2.Open the appliance and remove all the parts and articles packed inside the Component Pack. Inspect all the parts and glass for shipping damage. Contact your dealer if any irregularities are noticed.

3.All safety warnings have been read and followed.

4.This Owner’s Manual has been read.

5.Floor protection requirements have been met.

6.Venting is properly installed.

7.The proper clearances from the appliance and chim- ney to combustible materials have been met.

8.The masonry chimney is inspected by a professional and is clean, or the factory built metal chimney is installed according to the manufacturer’s instruc- tions and clearances.

9.The chimney meets the required minimum height.

10.All labels have been removed from the glass door.

11.A power outlet is available nearby if installing optional blower assembly.

WARNING

Asphyxiation Risk.

DO NOT CONNECT THIS UNIT TO A CHIM- NEY FLUE SERVICING ANOTHER APPLI- ANCE.

DO NOT CONNECT TO ANY AIR DISTRIB- UTON DUCT OR SYSTEM.

May allow flue gases to enter the house.

WARNING

Fire Risk.

Inspect appliance and components for damage. Damaged parts may impair safe operation.

Do NOT install damaged components.

Do NOT install incomplete components.

Do NOT install substitute components.

Report damaged parts to dealer.

May 5, 2011

7039-131H

Page 7

Image 7
Contents 7039-131H May 5 Hot glass will cause burnsSerial No Model Name Test Lab & Report No Millennium Wood Stove ACCMfg. Date 7039-131H May 5 Table of Contents Mobile Home Approved Appliance Certification BTU & Efficiency SpecificationsGlass Specifications Listing and Code ApprovalsGetting Started Fire SafetyMillennium Wood Stove ACC Negative Pressure Appliance needs to draft properly for safetyInspect Appliance & Components Pre-Burn Check List Millennium Wood Stove ACC Flue Draft ConsiderationsVenting Systems Tools And Supplies NeededMasonry Chimney Millennium Wood Stove ACC Typical Stove SystemsAppliance Dimensions Dimensions and ClearancesBackwall / Sidewall Corner Installation USA required Canada recommended InstallationRHearth Protection Requirements See FigureItems Needed for Installation not supplied Millennium Wood Stove ACC Outside Air Kit InstallationFloor Installation Alternative In some instances you 13-15/16 in mm Blower OptionalThimble Chimney ConnectorChimney Requirements Venting Components Chimney SystemsSolid Pack Chimney with Metal Supports as a Thimble ComponentsAir Clearances InstructionsChimney Height / Rise and Run Installing Chimney ComponentsSingle wall connector or stove pipe Solid Pack Chimney with Metal Supports as a Thimble Cont’dFlat Roof Millennium Wood Stove ACC Chimney Termination RequirementsRule Pitched RoofMobile Home Installation Appliance Set-Up Door Handle Assembly Adjusting The Blower Speed ControlWood Selection & Storage Operating InstructionsOver-Firing Your Appliance Wood Selection & Storage Cont’d Burning ProcessAir Controls Automatic Combustion Control ACCBurn Rates and Operating Efficiency Millennium Wood Stove ACC Building a Fire Incorrect Positions Snap Disc Location Initial cold start-up and all Burn SettingsMillennium Wood Stove ACC Blower Operating Instructions Opacity SmokeOdor from appliance Millennium Wood Stove ACC Frequently Asked QuestionsAppliance Maintaining & Servicing Your Appliance Quick Reference Maintenance GuideDisposal of Ashes Millennium Wood Stove ACC General MaintenanceCreosote Chimney Cleaning Glass Cleaning Frequency As desiredWhen cleaning glass Glass ReplacementTo your authorized dealer Millennium Wood Stove ACC Firebrick ReplacementBaffle Correct Blanket & Baffle Position onRemoving Tube Channel Assembly Millennium Wood Stove ACC Tube Channel Assembly ReplacementReplacing Tube Channel Assembly Start Fire Problems Possible Cause Solution TroubleshootingMillennium Wood Stove 21M-ACC21M-ACC Stocked 21M-ACC Date of Service Performed By Description of Service Millennium Wood Stove ACC Service And Maintenance LogMillennium Wood Stove ACC Service And Maintenance Log Cont’d Millennium Wood Stove ACC Homeowner’s Notes Millennium Wood Stove ACC Homeowner’s Notes Millennium Wood Stove ACC Warranty Policy Millennium Wood Stove ACC Contact Information