Vermont Casting RDVOD manual Install the Vent Pipe, Install Log Set

Page 19

Radiance Direct Vent/Natural Vent Gas Heater

The Radiance stove, when installed as a Natural vent heater, includes a vent safety switch. (Page 34, Figure

67)Operating the stove when it is not connected to a properly installed and maintained venting system, or tampering with or disconnecting the vent safety switch, can result in carbon monoxide (CO) poisoning and possible death.

For U.S. installations: The venting system must conform with local codes and/or the current National Fuel Gas Code, ANSI Z22.1.

For Canadian installations: The venting system must conform to the current CSA B149.1 installation code.

Install the Vent Pipe

Apply a bead of sealant around bottom end of inner starter pipe (found in bag with logset) and attach to stove. Apply a bead of sealant around top of inner starter pipe and install the Z31D00 FSDHAG Draft Hood according to Draft Hood instructions. (Fig. 35)

Attach the first section of venting to the draft hood. Depending on the length of the individual venting sections and the lengths of the decorative pipe (if installed), you may need to slip the decorative pipe over the venting sections before attaching upper sections to lower ones. The sections of decorative pipe should be oriented with their seams (if any) toward the wall; sections usually do not need to be fastened at each joint, other than slip sections. If the layout includes

a slip section, this should be the last section of pipe visible in the room, at the ceiling. Complete the venting according to the vent maker’s instructions.

* Refer to FSDHAG instructions for wiring on Page 34

CEMENT��� ���

ST655

Fig. 35 Install draft hood adpater (FSDHAG).

Install Log Set

Before beginning log installation, remove stove front and glass frame. Refer to Figures 36 and 37.

ST139

Fig. 36 Remove the stove front.

ST141

Fig. 37 Release the latches to remvoe the glass frame.

1.Remove the logs from their packaging, and inspect each piece for damage. DO NOT INSTALL DAM- AGED LOGS. The rear log bracket is shipped pack- aged with the logs.

2.Install the rear left log by placing it on the sheet metal shelf at the back of the firebox. (Fig. 39) The log should touch the back wall of the firebox. Slide the log to the left until the left side lines up with the left bracket. (Fig. 39) When the log is in place the left front corner of the log should rest on the decora- tive grate.

3.Install the rear right log by placing it on the sheet metal shelf at the back toward the right. Make sure the right side of the log lines up with the right bracket. (Fig. 39) NOTE: When the right and left rear logs are in place, they should touch the back of the firebox and each other.

2020

20004188

Image 19
Contents Radiance Direct Vent/Natural Vent Gas Heater Installation & Operating Instructions Radiance dimensions Radiance Direct Vent/Natural Vent Stove DimensionsLocating The Stove Installation RequirementsClearance Requirements Wall and Ceiling Clearances Wall Centerline from FloorHearth Requirements Horizontal Termination Direct Vent only Gas SpecificationsGas Inlet and Manifold Pressures High ElevationsVertical Termination Direct Vent only Restictor Plate is used on Direct Vent installations onlyVent Termination Clearances Location of Vent Termination General Venting Information Termination Location Canadian Installations US InstallationsPlate supplied with the stove is not used Venting Requirements Natural Vent OnlyApproved Vent System Components Venting Requirements and Options Direct Vent onlyUnpack and Assemble Legs Assembly ProceduresParts Bag Contents Tools RequiredRemove rear shroud Install the Optional FanAttach the Inner Vent Assembly to the stove Venting System Assembly Direct Vent General InformationInstall the Vent Adapter Pipe For Canadian installations The venting system mustInstall the Outer Adapter Pipe. Orient the verti Side Wall Termination AssemblyDiscard the inner starter pipe shipped with the log Measure the horizontal length Vent Termination Below Grade Vertical Through the Roof Vent AssemblyInstall firestops and attic insulation shield Venting System Assembly Natural Vent General InformationInstall Log Set Install the Vent PipeConnect the Gas Supply Line Install the left and right rear logs and the right logThermostat Connection optional Install ON/OFF SwitchInstall the Mesh and Grille Burner InformationYour First Fire Flame & Temperature AdjustmentFlame Characteristics OperationTo Turn Off Gas To Heater Lighting and Operating InstructionsSymptom Possible Causes Corrective Action Troubleshooting / Honeywell #8420 Gas Control SystemDelay Timer Mode Shut Off ProcedureTransmitter Operation Off Mode On Manual ModeLocal Path On Path Auto Path Disable Thermostat Function Auto ModeFan Override During Auto Mode Change Between F/C Temperature UnitsConversion to Natural Gas Input BTU/h Air Shutter AdjustmentInjector Orifice Size Matrix All ModelsMaintenance Inspect the Vent System Annually Gasket ReplacementCheck the Gas Flame Regularly BLK Wiring DiagramsDescription Radiance Direct Vent/Natural Vent Gas Heater RdvodRadiance Direct Vent/Natural Vent Gas Heater Rdvod Shell Enamel Parts Radiance Direct Vent / Natural Vent Fuel Conversion KitsOptional Accessories Limited Lifetime Warranty Model EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings