Vermont Casting RDVOD manual Maintenance

Page 30

Radiance Direct Vent /Natural Vent Gas Heater

Maintenance

Your Radiance Gas Heater will provide years of service with minimal upkeep. The following procedures will help ensure that your stove continues to function properly.

Annual System Inspection

Have the entire heater and venting system inspected annually by a qualified gas technician. Replace any worn or broken parts.

Logset and Burner /

Cleaning and Inspection

Cleanliness is critical to the proper function of the heater. The logset and burner must all be kept free of dust and unobstructed by debris. Inspect these areas before each use and clean as necessary.

1.Turn the burner OFF and let the heater cool com- pletely before cleaning.

2.Lift the Stove Front up and then swing the bottom out to disengage it from the heater shell. (Fig. 62)

3.Carefully remove the glass and frame assembly and place it out of the way on a flat, padded surface such as a counter protected by a towel.

4.Carefully inspect the Logs for damage. Contact your local dealer if any damage is evident.

5.Use a soft bristled brush to sweep dust or debris from the Logs, Pilot and Burner. Use care as the logs are fragile and susceptible to damage.

6.Replace the glass panel and frame assembly.

7.Replace the Stove Front.

CAUTION

TURN THE PILOT OFF BEFORE PAINTING. ALLOW THE HEATER TO COOL COMPLETELY BEFORE PAINTING.

Cleaning the Glass

WARNING: Allow the glass cool completely before attempting to clean.

It will be necessary to clean the glass periodically. Dur- ing start-up, condensation, which is normal, forms on the inside of the glass and causes lint, dust and other airborne particles to cling to the glass surface. Also initial paint curing may deposit a slight film on the glass. It is therefore recommended that the glass be cleaned two or three times with a non-ammonia household cleaner and warm water (we recommend gas fireplace glass cleaner). After that the glass should be cleaned two or three times during each heating season depend- ing on the circumstances present.

Clean glass after first two weeks of opera- tion.

Glass Replacement

Replace glass only with CFM Corporation approved parts. Refer to Page 35 for Replacement Parts. Refer to Figure 63 and previous instructions for removal of the damaged glass frame.

Care of Cast Iron

An occasional dusting with a dry rag will help keep the painted surfaces looking new. Use high-temperature stove paints, available through your local dealer, to touch-up areas as needed. Clean areas to be painted with a wire brush and be sure to cover the logs, burner and valve assembly, glass and frame assembly. Apply the paint sparingly; two light coats of paint will give bet- ter results than a single heavy coat.

Clean porcelain enamel surfaces with a soft, damp cloth. Do not use abrasive cleaning agents. If neces- sary, use only a cleaning agent formulated especially for use on porcelain enamel surfaces.

ST139

Fig. 62 Remove the Stove Front.

20004188

33

Image 30
Contents Radiance Direct Vent/Natural Vent Gas Heater Installation & Operating Instructions Radiance Direct Vent/Natural Vent Stove Dimensions Radiance dimensionsInstallation Requirements Locating The StoveClearance Requirements Wall Centerline from Floor Wall and Ceiling ClearancesHearth Requirements High Elevations Gas SpecificationsGas Inlet and Manifold Pressures Horizontal Termination Direct Vent onlyRestictor Plate is used on Direct Vent installations only Vertical Termination Direct Vent onlyVent Termination Clearances Location of Vent Termination Canadian Installations US Installations General Venting Information Termination LocationVenting Requirements Natural Vent Only Plate supplied with the stove is not usedVenting Requirements and Options Direct Vent only Approved Vent System ComponentsTools Required Assembly ProceduresParts Bag Contents Unpack and Assemble LegsInstall the Optional Fan Remove rear shroudFor Canadian installations The venting system must Venting System Assembly Direct Vent General InformationInstall the Vent Adapter Pipe Attach the Inner Vent Assembly to the stoveSide Wall Termination Assembly Install the Outer Adapter Pipe. Orient the vertiDiscard the inner starter pipe shipped with the log Measure the horizontal length Vertical Through the Roof Vent Assembly Vent Termination Below GradeVenting System Assembly Natural Vent General Information Install firestops and attic insulation shieldInstall the Vent Pipe Install Log SetInstall the left and right rear logs and the right log Connect the Gas Supply LineBurner Information Install ON/OFF SwitchInstall the Mesh and Grille Thermostat Connection optionalOperation Flame & Temperature AdjustmentFlame Characteristics Your First FireLighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting / Honeywell #8420 Gas Control System Symptom Possible Causes Corrective ActionOn Manual Mode Shut Off ProcedureTransmitter Operation Off Mode Delay Timer ModeLocal Path On Path Auto Path Change Between F/C Temperature Units Auto ModeFan Override During Auto Mode Disable Thermostat FunctionAll Models Air Shutter AdjustmentInjector Orifice Size Matrix Conversion to Natural Gas Input BTU/hMaintenance Gasket Replacement Inspect the Vent System AnnuallyCheck the Gas Flame Regularly Wiring Diagrams BLKRadiance Direct Vent/Natural Vent Gas Heater Rdvod DescriptionRadiance Direct Vent/Natural Vent Gas Heater Rdvod Fuel Conversion Kits Shell Enamel Parts Radiance Direct Vent / Natural VentOptional Accessories Limited Lifetime Warranty Efficiency Ratings Model EnerGuide Ratings Fireplace Efficiency %