Vermont Casting RDVOD manual Vent Termination Below Grade, Vertical Through the Roof Vent Assembly

Page 17

Radiance Direct Vent/Natural Vent Gas Heater

11.For CFM only: Install Charcoal Gray Pipe Rings (#7FSDRG) or Polished Brass Pipe Rings (#7FSDRP) at pipe joints, if desired.

Seal Both Termi- nal Ends

Caulk Plate Joint with

ST217

Weatherproof Sealant

Recessed Wall

Sheet Metal

Screws and

Bracket

Wall Screws

and Anchors

Waterproof Seal Around Pipe

ST219

Firestop

Finishing

Collar

7” Pipe

Wall Plate

Fig. 29 Install the vent terminal.

Vent Termination Below Grade

Install Snorkel Kit #7FSDVSKS when it is not possible to meet the required vent termination clearances of 12” (305mm) above grade level. The snorkel kit will allow installation depth of down to 7” (178mm) below grade level. The seven inches is measured from the center of the horizontal vent pipe as it penetrates the wall. If the venting system is installed below grade, a window well must be installed with adequate and proper drainage. (Fig. 31)

NOTE: Be sure to maintain side wall clearances and vent run restrictions. Refer to Page 6, Figures 3, 4, 5, 6.

1.Establish the vent hole through the wall.

2.Remove soil to a depth of approximately 16” (406 mm) below the base of the snorkel. Install a window well (not supplied). Refill the hole with 12” (305mm) of coarse gravel and maintain a clearance of at least 4” (102 mm) below the snorkel. (Fig. 31)

3.Install the vent system as described on pages 15-18.

4.Be sure to make a watertight joint around the vent pipe joint at the inside and outside wall joints.

5.Apply high temperature sealant around the inner and outer snorkel collars. Join the pipes and fasten the snorkel termination to the wall with the screws provided.

6.Level the soil to maintain a 4” clearance below the snorkel.

If the foundation is recessed, use extension brack- ets (not supplied) to fasten the lower portion of the snorkel. Fasten the brackets to the wall first, and then fasten to the snorkel with self-tapping #8 x 1/2” sheet metal screws. Extend the vent pipes out as far as the protruding wall face. (Fig. 30)

Fig. 30 Use extension brackets to mount snorkel against recessed wall.

 

Wall Screws

 

 

and Anchors

Waterproof Seal

 

 

Snorkel

Around Pipe

Termination

Firestop

Cap

 

 

 

4” Clearance

 

 

Gravel

 

 

Drain

 

 

Window Well

 

 

 

RADIANCE

 

 

ST653

Fig. 31

Snorkel kit installation.

 

Vertical (Through the Roof)

Vent Assembly

Note that all vertically terminated installations must, where specified, use the restrictor plate to comply with Vertical Termination Window (Page 7, Figure 8), included in the hardware bag. The plate must be installed within the firebox inner flue collar to insure a proper air/fuel ratio is maintained in an appli- ance vented through the roof.

1818

20004188

Image 17
Contents Radiance Direct Vent/Natural Vent Gas Heater Installation & Operating Instructions Radiance dimensions Radiance Direct Vent/Natural Vent Stove DimensionsClearance Requirements Installation RequirementsLocating The Stove Hearth Requirements Wall Centerline from FloorWall and Ceiling Clearances Gas Inlet and Manifold Pressures Gas SpecificationsHigh Elevations Horizontal Termination Direct Vent onlyVent Termination Clearances Restictor Plate is used on Direct Vent installations onlyVertical Termination Direct Vent only Location of Vent Termination General Venting Information Termination Location Canadian Installations US InstallationsPlate supplied with the stove is not used Venting Requirements Natural Vent OnlyApproved Vent System Components Venting Requirements and Options Direct Vent onlyParts Bag Contents Assembly ProceduresTools Required Unpack and Assemble LegsRemove rear shroud Install the Optional FanInstall the Vent Adapter Pipe Venting System Assembly Direct Vent General InformationFor Canadian installations The venting system must Attach the Inner Vent Assembly to the stoveDiscard the inner starter pipe shipped with the log Side Wall Termination AssemblyInstall the Outer Adapter Pipe. Orient the verti Measure the horizontal length Vent Termination Below Grade Vertical Through the Roof Vent AssemblyInstall firestops and attic insulation shield Venting System Assembly Natural Vent General InformationInstall Log Set Install the Vent PipeConnect the Gas Supply Line Install the left and right rear logs and the right logInstall the Mesh and Grille Install ON/OFF SwitchBurner Information Thermostat Connection optionalFlame Characteristics Flame & Temperature AdjustmentOperation Your First FireTo Turn Off Gas To Heater Lighting and Operating InstructionsSymptom Possible Causes Corrective Action Troubleshooting / Honeywell #8420 Gas Control SystemTransmitter Operation Off Mode Shut Off ProcedureOn Manual Mode Delay Timer ModeLocal Path On Path Auto Path Fan Override During Auto Mode Auto ModeChange Between F/C Temperature Units Disable Thermostat FunctionInjector Orifice Size Matrix Air Shutter AdjustmentAll Models Conversion to Natural Gas Input BTU/hMaintenance Check the Gas Flame Regularly Gasket ReplacementInspect the Vent System Annually BLK Wiring DiagramsDescription Radiance Direct Vent/Natural Vent Gas Heater RdvodRadiance Direct Vent/Natural Vent Gas Heater Rdvod Shell Enamel Parts Radiance Direct Vent / Natural Vent Fuel Conversion KitsOptional Accessories Limited Lifetime Warranty Model EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings