3.REQUIRED COMPONENTS AND ACCESSORIES CHECKLIST
TD-7Z, TD-41Z, TD-7ZDW, TD-41ZDW
COMPONENTS CHECKLIST
The following is a checklist of components required for proper installation of these
BOILER MATE™ models, both Priority and
A.Separate circulator
•1 each - circulator
•1 each - positive
B.Use of heating system zone circulator
•1 each - zone valve
C.Also Required:
•4 each - unions
•4 each - shut off valve
•1 each - vacuum breaker
•1 each - T & P relief valve (included)
•1 each - A
•As needed - pipe dope or Teflon tape
•Do not forget an EXTROL® and thermal expansion - an expansion tank is required on the boiler side of your system.
If a steel hydropneumatic tank is in place, AMTROL recommends replacing it with a properly sized EXTROL® expansion tank. Otherwise, significant heat transfer problems can occur by causing air to be trapped in the heat exchanger. If the boiler system has an EXTROL® expansion tank and the boiler temperatures are being changed, resize the EXTROL® expansion tank.