Goodman Mfg CVC9/95, MVC95 If you smell gas after five minutes, immediately follow, Temperature

Page 37

HEATANTICIPATORSETTING

The heat anticipator in the room thermostat must be correctly adjusted to obtain the proper number of cycles per hour and to prevent “overshooting” of the setting. Set the heat anticipator set- ting to 0.7 amps. Follow the thermostat manufacturer’s instruc- tions on how to adjust the heat anticipator setting.

DRAIN TRAPPRIMING

The drain trap must be primed prior to furnace startup. To prime, fill the drain trap with water. This ensures proper furnace drainage upon startup and prohibits the possibility of flue gases escaping through the drain system.

FURNACEOPERATION

Purge gas lines of air prior to startup. Be sure not purge lines into an enclosed burner compartment.

Check for leaks using an approved chloride-free soap and water solution, an electronic combustible gas detector, or other approved method. Verify that all required kits (propane gas, high altitude, etc.) have been appropriately installed.

FURNACESTARTUP

1.Close the manual gas shutoff valve external to the furnace.

2.Turn off the electrical power to the furnace.

3.Set the room thermostat to the lowest possible setting.

4.Remove the burner compartment door.

NOTE: This furnace is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

5. Move the furnace gas valve manual control to the OFF position.

6. Wait five minutes then smell for gas. Be sure check near the floor as some types of gas are heavier than air.

7. If you smell gas after five minutes, immediately follow the

STARTUP PROCEDURE & ADJUSTMENT

GASSUPPLYPRESSUREMEASUREMENT

CAUTION

TO PREVENT UNRELIABLE OPERATION OR EQUIPMENT DAMAGE, THE INLET GAS SUPPLY PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING PLATE WITH ALL OTHER HOUSEHOLD GAS FIRED APPLIANCES OPERATING.

The line pressure supplied to the gas valve must be within the range specified below. The supply pressure can be measured at the gas valve inlet pressure boss or at a hose fitting installed in the gas piping drip leg. The supply pressure must be measured with the burners operating. To measure the gas supply pressure, use the following procedure.

INLET

OUTLET

Gas Valve On/Off

Selector Switch

White-Rodgers Model 36G54 (Two-Stage)

Open to

Manometer

 

 

 

 

 

 

 

 

 

 

Atmosphere

 

Hose

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Outlet

 

 

High Fire Regulator

 

 

 

 

 

 

 

 

 

 

 

 

Adjust

 

 

 

 

Pressure Boss

 

 

 

 

 

 

 

 

 

Regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Instructions on page 5 of this manual. If you do not smell gas after five minutes, move the furnace gas valve manual control to the ON position.

8. Replace the burner compartment door.

9. Open the manual gas shutoff valve external to the furnace. 10. Turn on the electrical power to the furnace.

11. Adjust the thermostat to a setting above room temperature. 12. After the burners are lit, set the thermostat to desired

temperature.

Inlet

 

Pressure

Boss

High Fire Coil

Manometer

Terminal (HI)

 

 

On/Off Switch

Low Fire

Regulator

Adjust

Coaxial Coil

Terminal (M)

Common

Terminal(C)

FURNACESHUTDOWN

1.Set the thermostat to the lowest setting.

The integrated control will close the gas valve and extinguish flame. Followinga15seconddelay,theinduceddraftblower will be de-energized. After a 120, 150, 180 or 210-second delay period (field selectable delay OFF [90, 120, 150, 180] plus 30-second ramp down), the circulator blower de- energizes.

2.Removetheburnercompartmentdoorandmovethefurnace gas valve manual control to the OFF position.

3.Close the manual gas shutoff valve external to the furnace.

4.Replace the burner compartment door.

White-Rodgers Model 36G54 Connected to Manometer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

High Fire

Regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Adjust

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Valve On/Off

Selector SwitchLow Fire

Regulator

Adjust

37

Image 37
Contents Type FSP Category IV Direct or Non Direct Vent Air Furnace Product Description Normal Sequence of Operation Troubleshooting What to do if YOU Smell GAS Safety PrecautionsTotheinstaller ElectrostaticdischargeesdprecautionsProduct Description & Application ShippinginspectionProduct Description FeaturesProductapplication Location Requirements & Considerations Furnacesuspension ClearancesandaccessibilityExistingfurnaceremoval Combustion & Ventilation AIR Requirements Installation PositionsThermostatlocation Horizontal Applications & Considerations AlternateVent/FlueLocation RecommendedInstallationPositionsHorizontalFurnace VENT/FLUE Pipe & Combustion AIR Pipe Propane GAS/HIGH Altitude InstallationsPROPERVENT/FLUEANDCOMBUSTIONAIRPIPINGPRACTICES MaterialsandjoiningmethodsTerminationlocations Vent Termination Clearances Increased Clearance ConfigurationCanadianventingrequirements StandardfurnaceconnectionsAlternatefurnaceconnections Vent/FluePipeCutsRemove Pipe Relocate NON-DIRECTVENTSINGLEPIPEPIPING UpflowAlternate Vertical Termination Single Pipe Vertical Termination Single PipeHorizontalTerminationSinglePipe DirectventdualpipepipingStandard Horizontal Terminations Dual Pipe Vertical Terminations Dual PipeHorizontalVentingOfMultipleUnits Alternate Horizontal Vent Termination Dual PipeConcentricventtermination Side Wall Vent KITHose and Tube Identification Condensate Drain Lines & Drain TrapStandardrightorleftsidedrainhoseconnections Drain Trap Mounting UPRIGHTINSTALLATIONS-TRAPONRIGHTSIDEExternally UPRIGHTINSTALLATIONS-TRAP on Leftside Counterflow furnaces HorizontalinstallationsCut Electrical Connections WiringharnessJunctionbox Relocation 115VOLT Line Connections24VOLTTHERMOSTATWIRING Thermostat Wiring DiagramsSINGLE-STAGE Heatingthermostatapplication Fossilfuelapplications Accessory load specifications are as followsGAS Supply and Piping Accessories Wiring24VOLTHUMIDIFIER HighaltitudederateNatural Gas Capacity of Pipe Cubic Feet of Gas Per Hour CFH GaspipingconnectionsGas Piping Connections Horizontal Upflow ModelCoupling Degree elbow Inch close nipple PropaneGasInstallationTypPropanegastanksandpiping Circulating AIR & Filters Propane Gas Piping ChartDuct Work -AIR Flow Checking Duct StaticChecking Static Pressure 80% Furnace Shown, 90% Similar Consult proper tables for the quantity of airDuctFlangeCutOuts BottomreturnairopeningupflowmodelsStartup Procedure &ADJUSTMENT Startup Procedure & AdjustmentFollowing figure shows possible filter locations Set the thermostat to the lowest setting TemperatureIf you smell gas after five minutes, immediately follow White-Rodgers Model 36G54 Two-StageTurn on the gas supply GasmanifoldpressuremeasurementandadjustmentHoneywell Model VR9205 Connected to Manometer Measuring Inlet Gas Pressure Alt. MethodGasinputratemeasurementnaturalgasonly TemperatureriseCirculatorblowerspeeds Temperature Rise MeasurementAirflowTable Blowerheat Offdelay Timings Heat Off Delay DipswitchesComfortnet System OverviewSystem System Operating System Wiring using Four-WiresComfortnetsystemadvancedfeatures Touch To step through the list of installed equipPear. Use Value. TouchConfiguration Is 30 seconds Non-CT compatible single stage AC unit NetworktroubleshootingPower UP SystemtroubleshootingNormal Sequence of Operation HeatingmodeCoolingmode Operational Checks & Safety Circuit DescriptionFanonlymode Safety Circuit Description Troubleshooting & Maintenance Operational ChecksTroubleshooting Maintenance Troubleshooting & MaintenanceFollow the manufacturer’s directions for service Repair and Replacement Parts Before Leaving AN InstallationInduced Draft Blower Transformer Door Switch MiscellaneousBank DIP SwitchesInternal Troubleshooting ChartLimit Message ChartInvalid Trips Status Codes CVC9AA, *MVC95AA Wiring DiagramCVC9AB, *MVC95AB

MVC95, CVC9/95 specifications

Goodman Manufacturing has established itself as a leader in the HVAC industry, and among its stellar lineup, the Goodman CVC9/95 and MVC95 stand out for their remarkable features, technologies, and efficiency.

The Goodman CVC9/95 is a high-performance gas furnace, designed for homeowners seeking reliability and cost-effective heating solutions. It operates with an impressive 95% Annual Fuel Utilization Efficiency (AFUE), which means that a significant portion of the fuel it consumes is converted into heat. This level of efficiency not only contributes to lower energy bills but also reduces greenhouse gas emissions, making it an environmentally friendly choice.

One of the standout features of the CVC9/95 is its multi-speed ECM blower motor. This technology adjusts the airflow according to the heating demands of the home, ensuring consistent and comfortable temperatures. The ECM motor also operates quietly, enhancing the comfort of your living space without the disruptive noise often associated with traditional furnaces.

The MVC95, on the other hand, offers similar efficiency with its also 95% AFUE rating. This model is equipped with a patented ignition system that enhances reliability with minimal maintenance needs. Its durable construction includes a heavy-gauge steel cabinet and an insulated blower compartment that minimizes heat loss. This design not only supports optimal performance but also contributes to its longevity.

Both models come with a self-diagnostic control board that provides straightforward troubleshooting capabilities, making it easier for technicians to ensure that your system is operating at peak performance. This feature aids in timely maintenance, which is crucial for extending the lifespan of the unit.

Additionally, Goodman backs their products with a strong warranty, offering a lifetime limited warranty on the heat exchanger and a 10-year limited parts warranty. This assurance provides homeowners peace of mind regarding their investment.

In the landscape of HVAC solutions, the Goodman CVC9/95 and MVC95 models exemplify a commitment to quality, efficiency, and advanced technology. Whether for new constructions or replacements, these furnaces offer superior heating performance coupled with modern conveniences, making them an invaluable choice for homeowners seeking effective climate control solutions. With their low emissions and high efficiency, choosing Goodman means investing in both comfort and sustainability.